SAP ABAP View CAUFV (View "Order Headers PP/CO")
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
View Type D Database View 
Database View CAUFV  
Short Description View "Order Headers PP/CO"    
Root table AFKO   Order Header Data PP Orders 
Table
# Table Name Foreign Table Foreign Field Foreign DIR
1 AFKO AFKO
2 AUFK  
Join Conditions
# Table Name Field Name Negation Operator Constants Cont. line AND/OR Offset F Length Mco Field
1 AFKO MANDT JL EQ 0 0
2 AUFK MANDT JR EQ AND 0 0
3 AFKO AUFNR JL EQ 0 0
4 AUFK AUFNR JR EQ 0 0
                     
View Fields
# View field Table Field Maintenance Flag Key Data element Mod Short Description
1 * AUFK *    
2 MANDT AUFK MANDT   MANDT Client
3 AUFNR AUFK AUFNR   AUFNR Order Number
4 AUART AUFK AUART   AUFART Order Type
5 AUTYP AUFK AUTYP   AUFTYP Order category
6 REFNR AUFK REFNR   AUFREFNR Reference order number
7 ERNAM AUFK ERNAM   AUFERFNAM Entered by
8 ERDAT AUFK ERDAT   AUFERFDAT Created on
9 AENAM AUFK AENAM   AUFAENAM Last changed by
10 AEDAT AUFK AEDAT   AUFAEDAT Change date for Order Master
11 KTEXT AUFK KTEXT   AUFTEXT Description
12 LTEXT AUFK LTEXT   AUFLTEXT Long Text Exists
13 BUKRS AUFK BUKRS   BUKRS Company Code
14 WERKS AUFK WERKS   WERKS_D Plant
15 GSBER AUFK GSBER   GSBER Business Area
16 KOKRS AUFK KOKRS   KOKRS Controlling Area
17 CCKEY AUFK CCKEY   CCKEY Cost collector key
18 KOSTV AUFK KOSTV   AUFKOSTV Responsible cost center
19 STORT AUFK STORT   AUFSTORT Location
20 SOWRK AUFK SOWRK   AUFSOWRK Location plant
21 ASTKZ AUFK ASTKZ   AUFSTKZ Identifier for statistical order
22 WAERS AUFK WAERS   AUFWAERS Order Currency
23 - AUFK ASTNR   AUFASTNR Order status
24 STDAT AUFK STDAT   AUFSTDAT Date of last status change
25 - AUFK ESTNR   AUFESTNR Status reached so far
26 - AUFK PHAS0   AUFPHAS0 Phase "Order created"
27 - AUFK PHAS1   AUFPHAS1 Phase "Order released"
28 - AUFK PHAS2   AUFPHAS2 Phase "order completed"
29 - AUFK PHAS3   AUFPHAS3 Phase "order closed"
30 - AUFK PDAT1   AUFPDAT1 Planned release date
31 - AUFK PDAT2   AUFPDAT2 Planned completion date
32 - AUFK PDAT3   AUFPDAT3 Planned closing date
33 IDAT1 AUFK IDAT1   AUFIDAT1 Release date
34 IDAT2 AUFK IDAT2   AUFIDAT2 Technical completion date
35 IDAT3 AUFK IDAT3   AUFIDAT3 Close date
36 OBJID AUFK OBJID   CCOBJID Object ID
37 - AUFK VOGRP   AUFSPSET Group of disallowed transactions
38 LOEKZ AUFK LOEKZ   AUFLOEKZ Deletion flag
39 PLGKZ AUFK PLGKZ   PLGKZ Identifier for planning with line items
40 KVEWE AUFK KVEWE   KVEWE Usage of the Condition Table
41 KAPPL AUFK KAPPL   KAPPL Application
42 KALSM AUFK KALSM   AUFKALSM Costing Sheet
43 ZSCHL AUFK ZSCHL   AUFZSCHL Overhead key
44 ABKRS AUFK ABKRS   AUFABKRS Processing group
45 KSTAR AUFK KSTAR   AUFKSTAR Settlement cost element
46 KOSTL AUFK KOSTL   AUFKOSTL Cost center for basic settlement
47 - AUFK SAKNR   AUFSAKNR G/L account for basic settlement
48 SETNM AUFK SETNM   AUFSETNM Allocation set
49 CYCLE AUFK CYCLE   ST_KOSTL Cost center to which costs are actually posted
50 SDATE AUFK SDATE   SDATE Start Date
51 SEQNR AUFK SEQNR   AUFSEQNR Sequence number
52 - AUFK USER0   AUFUSER0 Applicant
53 - AUFK USER1   AUFUSER1 Applicant's telephone number
54 - AUFK USER2   AUFUSER2 Person Responsible
55 - AUFK USER3   AUFUSER3 Telephone number of person in charge
56 USER4 AUFK USER4   AUFUSER4 Estimated total costs of order
57 - AUFK USER5   AUFUSER5 Application date
58 - AUFK USER6   AUFUSER6 Department
59 - AUFK USER7   AUFUSER7 Work Start
60 - AUFK USER8   AUFUSER8 End of Work
61 - AUFK USER9   AUFUSER9 Identifier for work permit issued
62 OBJNR AUFK OBJNR   J_OBJNR Object number
63 PRCTR AUFK PRCTR   PRCTR Profit Center
64 PSPEL AUFK PSPEL   PS_PSP_ELE Work breakdown structure element (WBS element)
65 AWSLS AUFK AWSLS   AWSLS Variance Key
66 ABGSL AUFK ABGSL   ABGR_SCHL Results Analysis Key
67 TXJCD AUFK TXJCD   TXJCD Tax Jurisdiction
68 FUNC_AREA AUFK FUNC_AREA   FKBER Functional Area
69 SCOPE AUFK SCOPE   SCOPE_CV Object Class
70 PLINT AUFK PLINT   PLINT Indicator for Integrated Planning
71 KDAUF AUFK KDAUF   KDAUF Sales Order Number
72 KDPOS AUFK KDPOS   KDPOS Item number in Sales Order
73 AUFEX AUFK AUFEX   AUFEX External order number
74 IVPRO AUFK IVPRO   IM_PROFIL Investment measure profile
75 LOGSYSTEM AUFK LOGSYSTEM   LOGSYSTEM Logical System
76 FLG_MLTPS AUFK FLG_MLTPS   CO_MLTPS Order with multiple items
77 ABUKR AUFK ABUKR   IM_ABUKRS Requesting company code
78 AKSTL AUFK AKSTL   PS_AKSTL Requesting cost center
79 SIZECL AUFK SIZECL   IM_SIZECL Scale of investment objects
80 IZWEK AUFK IZWEK   IZWEK Reason for investment
81 UMWKZ AUFK UMWKZ   AM_UMWKZ Reason for environmental investment
82 KSTEMPF AUFK KSTEMPF   CO_KSTEMPF Indicator: Direct cost collector
83 ZSCHM AUFK ZSCHM   PS_ZSCHM Interest Profile for Project/Order Interest Calculation
84 PKOSA AUFK PKOSA   PKOSA_D Cost collector for production process PROCNR
85 ANFAUFNR AUFK ANFAUFNR   AUFANFNR Requesting order
86 PROCNR AUFK PROCNR   CKML_F_PROCNR Production Process
87 PROTY AUFK PROTY   CKML_PROZESS_TYP Process Category (Procurement/Consumption)
88 RSORD AUFK RSORD   RSORD Refurbishment order indicator (PM)
89 BEMOT AUFK BEMOT   BEMOT Accounting Indicator
90 ADRNRA AUFK ADRNRA   AD_ADDRNUM Address number
91 ERFZEIT AUFK ERFZEIT   CO_INS_TIME Time created
92 AEZEIT AUFK AEZEIT   CO_CHG_TIME Changed at
93 CSTG_VRNT AUFK CSTG_VRNT   CK_KLVAR Costing Variant
94 COSTESTNR AUFK COSTESTNR   CK_KALNR Cost Estimate Number for Cost Est. w/o Qty Structure
95 VERAA_USER AUFK VERAA_USER   VERAA_USER Person Responsible for CO Internal Order
96 VNAME AUFK VNAME   JV_NAME Joint venture
97 RECID AUFK RECID   JV_RECIND Recovery Indicator
98 ETYPE AUFK ETYPE   JV_ETYPE Equity type
99 OTYPE AUFK OTYPE   JV_OTYPE Joint Venture Object Type
100 JV_JIBCL AUFK JV_JIBCL   JV_JIBCL JIB/JIBE Class
101 JV_JIBSA AUFK JV_JIBSA   JV_JIBSA JIB/JIBE Subclass A
102 JV_OCO AUFK JV_OCO   JV_OR_CO JV original cost object
103 /CUM/INDCU AUFK /CUM/INDCU   /CUM/INDCU CU: Order is Used for Compatible Units
104 /CUM/CMNUM AUFK /CUM/CMNUM   /CUM/CMNUM CU: Construction Measure Number
105 /CUM/AUEST AUFK /CUM/AUEST   /CUM/AUEST CU: Automatic Copy of Estimated Costs
106 /CUM/DESNUM AUFK /CUM/DESNUM   /CUM/DESNUM CU: Design Number
107 VAPLZ AUFK VAPLZ   GEWRK Main work center for maintenance tasks
108 WAWRK AUFK WAWRK   WERGW Plant associated with main work center
109 FERC_IND AUFK FERC_IND   FE_IND Regulatory indicator
110 * AFKO *    
111 - AFKO MANDT   MANDT Client
112 - AFKO AUFNR   AUFNR Order Number
113 GLTRP AFKO GLTRP   CO_GLTRP Basic finish date
114 GSTRP AFKO GSTRP   PM_ORDGSTRP Basic Start Date
115 FTRMS AFKO FTRMS   CO_FTRMS Scheduled release date
116 GLTRS AFKO GLTRS   CO_GLTRS Scheduled finish
117 GSTRS AFKO GSTRS   CO_GSTRS Scheduled start
118 GSTRI AFKO GSTRI   CO_GSTRI Actual start date
119 GETRI AFKO GETRI   CO_GETRI Confirmed Order Finish Date
120 GLTRI AFKO GLTRI   CO_GLTRI Actual finish date
121 FTRMI AFKO FTRMI   CO_FTRMI Actual release date
122 FTRMP AFKO FTRMP   CO_FTRMP Planned release date
123 RSNUM AFKO RSNUM   RSNUM Number of reservation/dependent requirements
124 GASMG AFKO GASMG   GASMG Total scrap quantity in the order
125 GAMNG AFKO GAMNG   GAMNG Total order quantity
126 GMEIN AFKO GMEIN   MEINS Base Unit of Measure
127 PLNBEZ AFKO PLNBEZ   MATNR Material Number
128 PLNTY AFKO PLNTY   PLNTY Task List Type
129 PLNNR AFKO PLNNR   PLNNR Key for Task List Group
130 PLNAW AFKO PLNAW   PLNAW Application of the task list
131 PLNAL AFKO PLNAL   PLNAL Group Counter
132 PVERW AFKO PVERW   PLN_VERWE Task list usage
133 PLAUF AFKO PLAUF   CO_PLAUF Date for routing transfer
134 PLSVB AFKO PLSVB   LOSGRBIS To lot size
135 PLNME AFKO PLNME   PLNME Task list unit of measure
136 PLSVN AFKO PLSVN   LOSGRVON From Lot Size
137 PDATV AFKO PDATV   DATUV Valid-From Date
138 PAENR AFKO PAENR   AENNR Change Number
139 PLGRP AFKO PLGRP   VAGRP Responsible planner group/department
140 LODIV AFKO LODIV   LOSDIV Lot size divisor
141 STLTY AFKO STLTY   STLTY BOM Category
142 STLBEZ AFKO STLBEZ   MATNR Material Number
143 STLST AFKO STLST   STLST BOM Statuses
144 STLNR AFKO STLNR   STNUM Bill of Material
145 SDATV AFKO SDATV   DATUV Valid-From Date
146 SBMNG AFKO SBMNG   BASMN Base quantity
147 SBMEH AFKO SBMEH   MEINS Base Unit of Measure
148 SAENR AFKO SAENR   AENNR Change Number
149 STLAL AFKO STLAL   STALT Alternative BOM
150 STLAN AFKO STLAN   STLAN BOM Usage
151 SLSVN AFKO SLSVN   LOSVN From Lot Size
152 SLSBS AFKO SLSBS   LOSBS To Lot Size
153 AUFLD AFKO AUFLD   CO_AUFLD Date of BOM Explosion/Routing Transfer
154 DISPO AFKO DISPO   CO_DISPO MRP controller for the order
155 AUFPL AFKO AUFPL   CO_AUFPL Routing number of operations in the order
156 FEVOR AFKO FEVOR   FEVOR Production Supervisor
157 FHORI AFKO FHORI   FHORI Scheduling Margin Key for Floats
158 TERKZ AFKO TERKZ   TERMKZ Scheduling type
159 REDKZ AFKO REDKZ   REDKZ Reduction indicator for scheduling
160 APRIO AFKO APRIO   CO_APRIO Order priority
161 NTZUE AFKO NTZUE   NETZ_UEBER Superior network number
162 VORUE AFKO VORUE   VORG_UEBER Superior activity
163 PROFID AFKO PROFID   PROFIDNZPL Network profile
164 VORGZ AFKO VORGZ   VORGZ Float before production (in days)
165 SICHZ AFKO SICHZ   SICHZ Float after production (in days)
166 FREIZ AFKO FREIZ   FREIZ Release period (in days)
167 UPTER AFKO UPTER   CO_UPTER Indicator: Change to Scheduled Dates
168 BEDID AFKO BEDID   BEDID ID of the capacity requirements record
169 PRONR AFKO PRONR   PS_PSP_PRO Project definition
170 ZAEHL AFKO ZAEHL   CIM_COUNT Internal counter
171 MZAEHL AFKO MZAEHL   CIM_COUNT Internal counter
172 ZKRIZ AFKO ZKRIZ   DZKRIZ Counter for additional criteria
173 PRUEFLOS AFKO PRUEFLOS   QPLOS Inspection Lot Number
174 KLVARP AFKO KLVARP   KALKVARPLN Costing variant for planned costs
175 KLVARI AFKO KLVARI   KALKVARIST Costing variant for actual costs
176 RGEKZ AFKO RGEKZ   CO_RGEKZ Indicator: Backflushing for order
177 PLART AFKO PLART   PS_PLART Basis for scheduling
178 FLG_AOB AFKO FLG_AOB   FLG_AOB Indicator: relationships
179 FLG_ARBEI AFKO FLG_ARBEI   FLG_ARBEI Indicator: Default value work is relevant
180 GLTPP AFKO GLTPP   CO_GLTPP Finish date (forecast)
181 GSTPP AFKO GSTPP   CO_GSTPP Forecast start date
182 GLTPS AFKO GLTPS   CO_GLTPS Scheduled forecast finish
183 GSTPS AFKO GSTPS   CO_GSTPS Scheduled forecast start
184 FTRPS AFKO FTRPS   CO_FTRPS Scheduled release date (forecast)
185 RDKZP AFKO RDKZP   REDKZP Reduction indicator for scheduling (forecast)
186 TRKZP AFKO TRKZP   TERMKZP Scheduling type (forecast)
187 RUECK AFKO RUECK   CO_RUECK Completion confirmation number for the operation
188 RMZHL AFKO RMZHL   CIM_COUNT Internal counter
189 IGMNG AFKO IGMNG   CO_IGMNG Yield confirmed from order confirmation
190 RATID AFKO RATID   BEDID ID of the capacity requirements record
191 GROID AFKO GROID   BEDID ID of the capacity requirements record
192 CUOBJ AFKO CUOBJ   CUOBJ Configuration (internal object number)
193 GLUZS AFKO GLUZS   CO_GLUZS Scheduled finish time
194 GSUZS AFKO GSUZS   CO_GSUZS Scheduled Start (Time)
195 REVLV AFKO REVLV   REVLV Revision level
196 RSHTY AFKO RSHTY   CR_OBJTY Object types of the CIM resource
197 RSHID AFKO RSHID   CR_OBJID Object ID of the resource
198 RSNTY AFKO RSNTY   CR_OBJTY Object types of the CIM resource
199 RSNID AFKO RSNID   CR_OBJID Object ID of the resource
200 NAUTERM AFKO NAUTERM   CO_NAUTERM Indicator: Do not schedule automatically
201 NAUCOST AFKO NAUCOST   CO_NAUCOST Indicator: Do not cost automatically
202 STUFE AFKO STUFE   HISTU Level (in Multi-Level BOM Explosions)
203 WEGXX AFKO WEGXX   WEGXX Path (for Multi-Level BOM Explosions)
204 VWEGX AFKO VWEGX   WEGXX Path (for Multi-Level BOM Explosions)
205 ARSNR AFKO ARSNR   RSNUM Number of reservation/dependent requirements
206 ARSPS AFKO ARSPS   CO_POSNR Order item number
207 MAUFNR AFKO MAUFNR   MAUFNR Number of superior order
208 LKNOT AFKO LKNOT   CO_LKNOT Left node in collective order
209 RKNOT AFKO RKNOT   CO_RKNOT Right node of a collective order
210 PRODNET AFKO PRODNET   CO_PRODNET Indicator: Order is part of collective order
211 IASMG AFKO IASMG   CO_IASMG Scrap confirmed for order
212 ABARB AFKO ABARB   CO_ABARB Confirmation: Degree of processing
213 AUFNT AFKO AUFNT   CO_TEILNET Number of superior network
214 AUFPT AFKO AUFPT   CO_AUFPL Routing number of operations in the order
215 APLZT AFKO APLZT   CO_APLZL General counter for order
216 NO_DISP AFKO NO_DISP   NO_DISP_PLUS Effective for Materials Planning
217 CSPLIT AFKO CSPLIT   CSPLIT Apportionment structure
218 AENNR AFKO AENNR   AENNR Change Number
219 CY_SEQNR AFKO CY_SEQNR   CY_SEQNR Seq. number order
220 BREAKS AFKO BREAKS   BREAKS Indicator: Scheduling allowing for breaks
221 VORGZ_TRM AFKO VORGZ_TRM   VORGZ_TRM Scheduled float before production in days
222 SICHZ_TRM AFKO SICHZ_TRM   SICHZ_TRM Scheduled float after production in days
223 TRMDT AFKO TRMDT   TRMDT Date of the last scheduling
224 GLUZP AFKO GLUZP   CO_GLUZP Basic finish (time)
225 GSUZP AFKO GSUZP   CO_GSUZP Basic start time
226 GSUZI AFKO GSUZI   CO_GSUZI Actual start time
227 GEUZI AFKO GEUZI   CO_GEUZI Confirmed order finish (time)
228 GLUPP AFKO GLUPP   CO_GLUPP Forecast finish (time)
229 GSUPP AFKO GSUPP   CO_GSUPP Forecast start (time)
230 GLUPS AFKO GLUPS   CO_GLUPS Scheduled forecast finish time
231 GSUPS AFKO GSUPS   CO_GSUPS Scheduled start time (Forecast)
232 CHSCH AFKO CHSCH   KALSMA_CH Search procedure for batch determination
233 KAPT_VORGZ AFKO KAPT_VORGZ   KAPT_VORGZ Float (bef. production) remaining after finite scheduling
234 KAPT_SICHZ AFKO KAPT_SICHZ   KAPT_SICHZ Remaining float after finite scheduling
235 LEAD_AUFNR AFKO LEAD_AUFNR   CO_LAUFNR Leading order in current processing
236 PNETSTARTD AFKO PNETSTARTD   CO_PSTARTD Outline start of collective network (date)
237 PNETSTARTT AFKO PNETSTARTT   CO_PSTARTT Start time of a collective order
238 PNETENDD AFKO PNETENDD   CO_PENDD Outline finish of collective order (date)
239 PNETENDT AFKO PNETENDT   CO_PENDT Outline finish time
240 KBED AFKO KBED   KBED_D Ind: do not create capacity requirements
241 KKALKR AFKO KKALKR   COMP_CALC Indicator: Components will not be costed
242 SFCPF AFKO SFCPF   CO_PRODPRF Production Scheduling Profile
243 RMNGA AFKO RMNGA   RMNGA Total confirmed rework quantity
244 GSBTR AFKO GSBTR   CO_GSBTR Overall commitment date
245 VFMNG AFKO VFMNG   CO_VFMNG Committed quantity for order acc. to ATP check components
246 NOPCOST AFKO NOPCOST   CO_NOPCOST Do not calculate planned costs for order
247 NETZKONT AFKO NETZKONT   NETZKONT Indicator for the account assignment of a network(hdr/act.)
248 ATRKZ AFKO ATRKZ   ATRKZ Request ID
249 OBJTYPE AFKO OBJTYPE   OCM_OBJ_TYPE Change indicator
250 CH_PROC AFKO CH_PROC   OCM_CH_PROC Process that has lead to the change of an object
251 KAPVERSA AFKO KAPVERSA   KAPVERSA Version of Available Capacity
252 COLORDPROC AFKO COLORDPROC   CO_COLORDPRC Collective order with/without automatic goods movement
253 KZERB AFKO KZERB   PS_KZERB Indicator: Project summarization
254 CONF_KEY AFKO CONF_KEY   CC_CONF_KEY Identical object
255 ST_ARBID AFKO ST_ARBID   OBJEKTID Object ID
256 VSNMR_V AFKO VSNMR_V   VSNMR_V Sales document version number
257 TERHW AFKO TERHW   TERHW Scheduling note from order scheduling
258 SPLSTAT AFKO SPLSTAT   SPLIT_STAT Status of an order in a split hierarchy
259 COSTUPD AFKO COSTUPD   CN_COSTUPD Costs are updated
260 MAX_GAMNG AFKO MAX_GAMNG   CO_MES_MAX_GAMNG Maximum Value of Total Order Quantity After Distribution
261 MES_ROUTINGID AFKO MES_ROUTINGID   CO_MES_INT_ROUTINGID Key of a Routing from an ME System
262 ADPSP AFKO ADPSP   ADCOMPARE PM/PS Reference Element
263 RMANR AFKO RMANR   VBELN Sales and Distribution Document Number
264 POSNR_RMA AFKO POSNR_RMA   POSNR Item number of the SD document
265 POSNV_RMA AFKO POSNV_RMA   POSNR Item number of the SD document
266 CFB_MAXLZ AFKO CFB_MAXLZ   MAXLZ Maximum storage period
267 CFB_LZEIH AFKO CFB_LZEIH   LZEIH Unit for maximum storage period
268 CFB_ADTDAYS AFKO CFB_ADTDAYS   CFB_ADTDAYS Additional Days
269 CFB_DATOFM AFKO CFB_DATOFM   CFB_DATOFM Date of Manufacture
270 CFB_BBDPI AFKO CFB_BBDPI   CFB_BBD_PPPI Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED)
271 - AFKO OIHANTYP   OIH_HANTYP Excise Duty Handling Type
                 
Maintenance Status
Access
  read only
  read and change
  Time-dependent views: like U, validity data like ' '
  read, change, delete and insert
Delivery Class      
Data Browser/Table View Maintenance    Display/Maintenance Allowed with Restrictions  
History
Last changed by/on SAP  20130529 
SAP Release Created in