Data Element list used by SAP ABAP Table ACT01_UPDATE_RELEVANT (Fields relevant to update from AFVC,V,V (sim. vers.))
SAP ABAP Table
ACT01_UPDATE_RELEVANT (Fields relevant to update from AFVC,V,V (sim. vers.)) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
ABLAD | Unloading Point | |
2 | ![]() |
ABLIPKZ | Indicator: simultaneous teardown and wait | |
3 | ![]() |
ABRUE | Teardown | |
4 | ![]() |
AENNR | Change Number | |
5 | ![]() |
AFAKT | Execution Factor | |
6 | ![]() |
AFNAM | Name of requisitioner/requester | |
7 | ![]() |
ANFKO | Requesting cost center | |
8 | ![]() |
ANFKOKRS | Controlling area of the requesting cost center | |
9 | ![]() |
ANLZU | Syst.Condition | |
10 | ![]() |
ANZKAP | Number of capacities required | |
11 | ![]() |
ANZMS | Number of employees | |
12 | ![]() |
APROZENT | Work percentage | |
13 | ![]() |
ARBEIT | Work involved in the activity | |
14 | ![]() |
ARBEITE | Unit for work | |
15 | ![]() |
ARUZE | Unit of measure for teardown | |
16 | ![]() |
ASVRG | Operation scrap | |
17 | ![]() |
AUFKALSM | Costing Sheet | |
18 | ![]() |
AUFLOEKZ | Deletion flag | |
19 | ![]() |
AUFZSCHL | Overhead key | |
20 | ![]() |
AUSCHUFAK | Scrap factor | |
21 | ![]() |
BEARZEIT | Processing time | |
22 | ![]() |
BEAZE | Unit of measure for processing time | |
23 | ![]() |
BEAZEP | Unit of processing time (Forecast) | |
24 | ![]() |
BEDNR | Requirement Tracking Number | |
25 | ![]() |
BMSCH | Base Quantity | |
26 | ![]() |
BUKRS | Company Code | |
27 | ![]() |
CIM_COUNT | Internal counter | |
28 | ![]() |
CLASF | Ind.: Take Activity Into Account for Project Summarization | |
29 | ![]() |
CN_KZFIX | Indicator: Purchasing info record data are fixed | |
30 | ![]() |
CO_APLZL | General counter for order | |
31 | ![]() |
CO_FRDLB | Indicator: Externally processed op. with subcontracting | |
32 | ![]() |
CO_LEIKZ | Indicator: No remaining activity expected | |
33 | ![]() |
CO_LEIKZ | Indicator: No remaining activity expected | |
34 | ![]() |
CO_LEIKZ | Indicator: No remaining activity expected | |
35 | ![]() |
CO_LEIKZ | Indicator: No remaining activity expected | |
36 | ![]() |
CO_LEIKZ | Indicator: No remaining activity expected | |
37 | ![]() |
CO_LEIKZ | Indicator: No remaining activity expected | |
38 | ![]() |
CO_PEDD | Forecast finish date of operation from confirmation | |
39 | ![]() |
CO_PEDZ | Forecast finish time of operation from confirmation | |
40 | ![]() |
CO_PERNR | Personnel number | |
41 | ![]() |
CO_SCHAETZ | Forecast value used to update the standard value | |
42 | ![]() |
CO_SCHAETZ | Forecast value used to update the standard value | |
43 | ![]() |
CO_SCHAETZ | Forecast value used to update the standard value | |
44 | ![]() |
CO_SCHAETZ | Forecast value used to update the standard value | |
45 | ![]() |
CO_SCHAETZ | Forecast value used to update the standard value | |
46 | ![]() |
CO_SCHAETZ | Forecast value used to update the standard value | |
47 | ![]() |
CO_SELKZ | Selection indicator for costing line items | |
48 | ![]() |
CP_OBZOFFB | Reference date for start of sub-operation | |
49 | ![]() |
CP_OBZOFFE | Reference date for finish of sub-operation | |
50 | ![]() |
CP_OEHOFFB | Unit for offset to start | |
51 | ![]() |
CP_OEHOFFE | Unit for offset to finish | |
52 | ![]() |
CP_OOFFSTB | Offset to sub-operation start | |
53 | ![]() |
CP_OOFFSTE | Offset to sub-operation finish | |
54 | ![]() |
CP_UMREN | Denominator for converting rtg and op units of measure | |
55 | ![]() |
CP_UMREZ | Numerator for converting task list and oper. un. of measure | |
56 | ![]() |
CR_OBJID | Object ID of the resource | |
57 | ![]() |
CR_OBJID_I | Actual operating resources object identification | |
58 | ![]() |
CR_PDEST | Printer for shop papers | |
59 | ![]() |
CR_RS_ANZ | Number of confirmation slips | |
60 | ![]() |
CR_VERTN | Distr.cap.reqmts (plant maint.,process order, network) | |
61 | ![]() |
CUOBJ | Configuration (internal object number) | |
62 | ![]() |
CY_SEQNRV | Sequence number operation | |
63 | ![]() |
DAUDEHN | Indicator: flexible duration | |
64 | ![]() |
DAUMIN | Minimum activity duration | |
65 | ![]() |
DAUMINE | Unit for the minimum duration | |
66 | ![]() |
DAUNOR | Normal duration of the activity | |
67 | ![]() |
DAUNORE | Normal duration/unit | |
68 | ![]() |
DZCODE | Reference number for standard value code | |
69 | ![]() |
DZEIER | Unit for the break time | |
70 | ![]() |
DZEILM | Unit for the maximum wait time | |
71 | ![]() |
DZEILP | Unit for the required wait time | |
72 | ![]() |
DZEIMB | Unit for the minimum processing time | |
73 | ![]() |
DZEIMU | Unit for the minimum overlap time | |
74 | ![]() |
DZEITM | Unit for the minimum move time | |
75 | ![]() |
DZEITN | Unit for the standard move time | |
76 | ![]() |
DZEIWM | Unit for the minumum queue time | |
77 | ![]() |
DZEIWN | Unit for the standard queue time | |
78 | ![]() |
DZERMA | Type of standard value calculation | |
79 | ![]() |
DZGDAT | Date when the standard value was calculated | |
80 | ![]() |
DZLMAX | Maximum wait time | |
81 | ![]() |
DZLPRO | Minimum wait time | |
82 | ![]() |
DZMERH | Break | |
83 | ![]() |
DZMINB | Minimum processing time | |
84 | ![]() |
DZMINU | Minimum overlap time | |
85 | ![]() |
DZTMIN | Minimum move time | |
86 | ![]() |
DZTNOR | Standard move time | |
87 | ![]() |
DZULNR | Basis for standard value calculation | |
88 | ![]() |
DZWMIN | Minimum queue time | |
89 | ![]() |
DZWNOR | Standard queue time | |
90 | ![]() |
EBORT | Installation Point for Subitem | |
91 | ![]() |
EINSCHRA | Constraint on the basic start date for the activity | |
92 | ![]() |
EINSCHRE | Constraint on the finish date of the activity | |
93 | ![]() |
EKORG | Purchasing organization | |
94 | ![]() |
EPANF | Dispatched start date for operation | |
95 | ![]() |
EPANZ | Dispatched start time for operation | |
96 | ![]() |
EPEND | Dispatched finish date | |
97 | ![]() |
EPENZ | Dispatched finish time | |
98 | ![]() |
ESOKZ | Purchasing info record category | |
99 | ![]() |
EV_WEIGHTD | Aggregation weight for POC (PS progress) | |
100 | ![]() |
EWDAM | Minimum duration (from forecast) for activity | |
101 | ![]() |
EWDAN | Normal duration (from forecast) of activity | |
102 | ![]() |
EWDME | Unit for forecast minimum duration | |
103 | ![]() |
EWDNE | Unit for forecast normal duration | |
104 | ![]() |
EWENDED | Forecast finish date | |
105 | ![]() |
EWENDEZ | Forecast finish time for the activity | |
106 | ![]() |
EWSTARTD | Forecasted start date for the activity | |
107 | ![]() |
EWSTARTZ | Forecast start time of the activity | |
108 | ![]() |
FE_IND | Regulatory indicator | |
109 | ![]() |
FLIESSKZ | Indicator: continuous flow production | |
110 | ![]() |
FPAVD | Earliest scheduled start date (forecast) | |
111 | ![]() |
FPAVZ | Earliest scheduled start time (forecast) | |
112 | ![]() |
FPEDD | Earliest scheduled finish date (forecast) | |
113 | ![]() |
FPEDZ | Earliest scheduled finish time (forecast) | |
114 | ![]() |
FPLNR | Billing plan number / invoicing plan number | |
115 | ![]() |
FRSP | Earliest possible activity / Latest possible activity | |
116 | ![]() |
FRUNV | Indicator: External procurement data incomplete | |
117 | ![]() |
FSAVD | Earliest scheduled start: Execution (date) | |
118 | ![]() |
FSAVZ | Earliest scheduled start: Execution (time) | |
119 | ![]() |
FSEDD | Earliest scheduled finish: Execution (date) | |
120 | ![]() |
FSEDZ | Earliest scheduled finish: Execution (time) | |
121 | ![]() |
FSELD | Earliest scheduled finish: Wait (date) | |
122 | ![]() |
FSELZ | Earliest scheduled finish: Wait (time) | |
123 | ![]() |
FSSAD | Earliest scheduled start: Teardown (date) | |
124 | ![]() |
FSSAZ | Earliest scheduled start: Teardown (time) | |
125 | ![]() |
FSSBD | Earliest scheduled start: Processing (date) | |
126 | ![]() |
FSSBZ | Earliest scheduled start: Processing (time) | |
127 | ![]() |
FSSLD | Earliest scheduled start: Wait (date) | |
128 | ![]() |
FSSLZ | Earliest scheduled start: Wait (time) | |
129 | ![]() |
GMNGA | Confirmed yield in order unit of measure | |
130 | ![]() |
GSBER | Business Area | |
131 | ![]() |
ILA | Maintenance activity type | |
132 | ![]() |
INDET | Calculation key | |
133 | ![]() |
ISTRU | Assembly | |
134 | ![]() |
JV_ETYPE | Equity type | |
135 | ![]() |
JV_JIBCL | JIB/JIBE Class | |
136 | ![]() |
JV_JIBSA | JIB/JIBE Subclass A | |
137 | ![]() |
JV_NAME | Joint venture | |
138 | ![]() |
JV_OR_CO | JV original cost object | |
139 | ![]() |
JV_OTYPE | Joint Venture Object Type | |
140 | ![]() |
JV_RECIND | Recovery Indicator | |
141 | ![]() |
KAPT_PUFFR | Operation floats after finite scheduling (in seconds) | |
142 | ![]() |
KNOBJ | Number of Object with Assigned Dependencies | |
143 | ![]() |
KNOTE | Transportation Connection Points | |
144 | ![]() |
KSTAR | Cost Element | |
145 | ![]() |
KTSCH | Standard text key | |
146 | ![]() |
KZLGF | Indicator: fixed lot external processing | |
147 | ![]() |
KZWRTF | Indicator: Fixed price for external processing | |
148 | ![]() |
LEKNW | Indicator: No Remaining Work Expected | |
149 | ![]() |
LIEGEZEIT | Wait time used for scheduling | |
150 | ![]() |
LIFNR | Account Number of Vendor or Creditor | |
151 | ![]() |
LIGZE | Unit of measure for wait time | |
152 | ![]() |
LMNGA | Total Yield Confirmed | |
153 | ![]() |
LOHNANZ | Number of Time Tickets | |
154 | ![]() |
LOHNART | Wage type | |
155 | ![]() |
LOHNGRP | Wage group | |
156 | ![]() |
LSTAR | Activity Type | |
157 | ![]() |
LSTAR | Activity Type | |
158 | ![]() |
LSTAR | Activity Type | |
159 | ![]() |
LSTAR | Activity Type | |
160 | ![]() |
LSTAR | Activity Type | |
161 | ![]() |
LSTAR | Activity Type | |
162 | ![]() |
LSTAR | Activity Type | |
163 | ![]() |
LTXA1 | Operation short text | |
164 | ![]() |
LTXA2 | Second line of the description | |
165 | ![]() |
MATKL | Material Group | |
166 | ![]() |
MGVRG | Operation Quantity | |
167 | ![]() |
MILESTONE | Usage | |
168 | ![]() |
MINWEI | Minimum Send-Ahead Quantity | |
169 | ![]() |
NETZKONT | Indicator for the account assignment of a network(hdr/act.) | |
170 | ![]() |
NODISP | Ind: Reserv. not applicable to MRP;Purc. req. not created | |
171 | ![]() |
NW_PRIO | Priority | |
172 | ![]() |
OBJEKTID | Object ID | |
173 | ![]() |
OFMNW | Forecasted work (actual + remaining) | |
174 | ![]() |
OTYPE | Object Type | |
175 | ![]() |
OWAERS | Object currency for network activity | |
176 | ![]() |
PACKNO | Package number | |
177 | ![]() |
PBEARZEIT | Processing time (forecast) | |
178 | ![]() |
PDAE | Unit of the forecasted duration from the confirmation | |
179 | ![]() |
PDAU | Forecasted duration of activity from confirmation | |
180 | ![]() |
PEINH | Price unit | |
181 | ![]() |
PHFLG | Indicator: Phase | |
182 | ![]() |
PHSEQ | Control Recipe Destination | |
183 | ![]() |
PLIFZ | Planned delivery time in days | |
184 | ![]() |
PLNAL | Group Counter | |
185 | ![]() |
PLNFOLGE | Sequence | |
186 | ![]() |
PLNFOLGE | Sequence | |
187 | ![]() |
PLNKN | Number of the task list node | |
188 | ![]() |
PLNNR | Key for Task List Group | |
189 | ![]() |
PLNTY | Task List Type | |
190 | ![]() |
PPUFF_FREI | Free float (from forecast) | |
191 | ![]() |
PPUFF_GESM | Total float (from forecast) | |
192 | ![]() |
PRCTR | Profit Center | |
193 | ![]() |
PREIS | Price | |
194 | ![]() |
PRIORITAET | Priority | |
195 | ![]() |
PRKST | Costs in the activity | |
196 | ![]() |
PROD_ACT | Indicator: Activity is a production activity | |
197 | ![]() |
PS_RESTA | Forecast date constraint on activity start | |
198 | ![]() |
PS_RESTE | Forecast date constraint on activity finish | |
199 | ![]() |
PS_SPS_ELE | Standard WBS element | |
200 | ![]() |
PUFFR_FREI | Free float | |
201 | ![]() |
PUFFR_GESM | Total float | |
202 | ![]() |
QEIFSUBSYS | Subsystem Identifier for QM Subsystem Interface | |
203 | ![]() |
QERFSICHT | Recording View | |
204 | ![]() |
QKZFEAT | Indicator Is Not Used Currently | |
205 | ![]() |
QKZPRFREI | Interval Without Reference to Time or Quantity | |
206 | ![]() |
QKZPRMENG | Creation Cycle = Quantity (Quantity-Reference) | |
207 | ![]() |
QKZPRZEIT | Interval = Time (Time-Related) | |
208 | ![]() |
QKZTLSBEST | Operation with Stock-Related Partial Lot Assignment | |
209 | ![]() |
QKZZTMG1 | Quantity Confirmation for Each Partial Lot | |
210 | ![]() |
QL_KAPART | Capacity category | |
211 | ![]() |
QPART | Inspection Type | |
212 | ![]() |
QPPKTABS | Flow Variants for Inspection Point Completion | |
213 | ![]() |
QRASTEREH | Grid Unit of Measure | |
214 | ![]() |
QRASTMENG | Quantity Between Two Inspections | |
215 | ![]() |
QRASTZEHT | Time Unit | |
216 | ![]() |
QRASTZFAK | Time Factor | |
217 | ![]() |
QUALF | Suitability | |
218 | ![]() |
RSTRA | Reduction strategy per operation/activity | |
219 | ![]() |
RSTUF | Reduction level which reduces operation lead time | |
220 | ![]() |
RSTZE | Unit of measure for setup time | |
221 | ![]() |
RUEARSCHLU | Setup Type Key | |
222 | ![]() |
RUEFAGRP | Setup group category | |
223 | ![]() |
RUEFASCHLU | Setup group key | |
224 | ![]() |
RUEST | Setup time | |
225 | ![]() |
SCEND_ACT | Ind.: Purchase requisition at activity finish date | |
226 | ![]() |
SCOPE_CV | Object Class | |
227 | ![]() |
SLWID | Key word ID for user-defined fields | |
228 | ![]() |
SORTI | Sort Term for Non-Stock Info Records | |
229 | ![]() |
SPARAMETER | Scheduling Parameters for External Scheduling | |
230 | ![]() |
SPARAMETER | Scheduling Parameters for External Scheduling | |
231 | ![]() |
SPARAMETER | Scheduling Parameters for External Scheduling | |
232 | ![]() |
SPAVD | Latest scheduled start date (forecast) | |
233 | ![]() |
SPAVZ | Latest scheduled start time (forecast) | |
234 | ![]() |
SPEDD | Latest scheduled finish date (forecast) | |
235 | ![]() |
SPEDZ | Latest scheduled finish time (forecast) | |
236 | ![]() |
SPLITTANZ | Maximum number of splits | |
237 | ![]() |
SPLITTERM | Actual number of splits | |
238 | ![]() |
SPLITTUNG | Required splitting | |
239 | ![]() |
SPRAS | Language Key | |
240 | ![]() |
SSAVD | Latest scheduled start: Execution (date) | |
241 | ![]() |
SSAVZ | Latest scheduled start: Execution (time) | |
242 | ![]() |
SSEDD | Latest scheduled finish: Execution (date) | |
243 | ![]() |
SSEDZ | Latest scheduled finish: Execution (time) | |
244 | ![]() |
SSELD | Latest scheduled finish: Wait time (date) | |
245 | ![]() |
SSELZ | Latest scheduled finish: Wait time | |
246 | ![]() |
SSSAD | Latest scheduled start: Teardown (date) | |
247 | ![]() |
SSSAZ | Latest scheduled start: Teardown (time) | |
248 | ![]() |
SSSBD | Latest scheduled start: Processing (date) | |
249 | ![]() |
SSSBZ | Latest scheduled start: Processing (time) | |
250 | ![]() |
SSSLD | Latest scheduled start: Wait time (date) | |
251 | ![]() |
SSSLZ | Latest scheduled start: Wait time | |
252 | ![]() |
STDKN | Node of operation within reference operation set | |
253 | ![]() |
STEUS | Control key | |
254 | ![]() |
STLTY | BOM Category | |
255 | ![]() |
STNUM | Bill of Material | |
256 | ![]() |
TRANSZEIT | Move time used for scheduling | |
257 | ![]() |
TRAZE | Unit of measure for move time | |
258 | ![]() |
TXJCD | Tax Jurisdiction | |
259 | ![]() |
UEKANKZ | Optional overlapping | |
260 | ![]() |
UEMUSKZ | Required overlapping | |
261 | ![]() |
USRCHAR10 | User field with 10 characters | |
262 | ![]() |
USRCHAR10 | User field with 10 characters | |
263 | ![]() |
USRCHAR20 | User field with 20 characters | |
264 | ![]() |
USRCHAR20 | User field with 20 characters | |
265 | ![]() |
USRCUKY | User field: Unit for value fields | |
266 | ![]() |
USRCUKY | User field: Unit for value fields | |
267 | ![]() |
USRCURR13 | User-defined field for values (length 10,3) | |
268 | ![]() |
USRCURR13 | User-defined field for values (length 10,3) | |
269 | ![]() |
USRDATE | User field for date | |
270 | ![]() |
USRDATE | User field for date | |
271 | ![]() |
USRFLAG | User-defined field: Indicator for reports | |
272 | ![]() |
USRFLAG | User-defined field: Indicator for reports | |
273 | ![]() |
USRQUAN13 | User field for quantity (length 10.3) | |
274 | ![]() |
USRQUAN13 | User field for quantity (length 10.3) | |
275 | ![]() |
USRUNIT | User field: Unit for quantity fields | |
276 | ![]() |
USRUNIT | User field: Unit for quantity fields | |
277 | ![]() |
VGWRT | Standard Value | |
278 | ![]() |
VGWRT | Standard Value | |
279 | ![]() |
VGWRT | Standard Value | |
280 | ![]() |
VGWRT | Standard Value | |
281 | ![]() |
VGWRT | Standard Value | |
282 | ![]() |
VGWRT | Standard Value | |
283 | ![]() |
VGWRTEH | Unit of measure for the standard value | |
284 | ![]() |
VGWRTEH | Unit of measure for the standard value | |
285 | ![]() |
VGWRTEH | Unit of measure for the standard value | |
286 | ![]() |
VGWRTEH | Unit of measure for the standard value | |
287 | ![]() |
VGWRTEH | Unit of measure for the standard value | |
288 | ![]() |
VGWRTEH | Unit of measure for the standard value | |
289 | ![]() |
VG_EKGRP | Purchasing group for external processing | |
290 | ![]() |
VINTV | Increment between referenced operations | |
291 | ![]() |
VORGABEEND | Constraint for finish of activity (Basic) | |
292 | ![]() |
VORGABEENZ | Basic finish time of the activity | |
293 | ![]() |
VORGABESTD | Constraint for activity start (Basic) | |
294 | ![]() |
VORGABESTZ | Constraint for activity start time (Basic) | |
295 | ![]() |
VORGSCHL | Standard value key | |
296 | ![]() |
VORME | Unit of measure for activity | |
297 | ![]() |
VORNR | Operation/Activity Number | |
298 | ![]() |
VPLBFL | Referenced sequence in routing | |
299 | ![]() |
VPLNAL | Group counter of the referenced task list | |
300 | ![]() |
VPLNNR | Group of the referenced task list | |
301 | ![]() |
VPLNTY | Type of the referenced task list | |
302 | ![]() |
VSTGA | Deadline deviation reason | |
303 | ![]() |
VSTZW | Deadline function | |
304 | ![]() |
WAERS | Currency Key | |
305 | ![]() |
WARTEZEIT | Queue time used for scheduling | |
306 | ![]() |
WEMPF | Goods recipient | |
307 | ![]() |
WERKS_D | Plant | |
308 | ![]() |
WERKS_I | Actual plant | |
309 | ![]() |
WFCID | Factory Calendar | |
310 | ![]() |
WKURS | Exchange Rate | |
311 | ![]() |
WTRZE | Unit of measure for queue time | |
312 | ![]() |
XMNGA | Total scrap quantity confirmed |