SAP ABAP Message Class KZ (Cost Object Repetitive Mfg / Process Mfg)
Basic Data
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
CO-PC-OBJ (Application Component) Cost Object Controlling
⤷
KKP (Package) Cost Object Controlling for Repetitive Mfg: General
⤷
⤷
Attributes
| Message class | KZ | |
| Short Description | Cost Object Repetitive Mfg / Process Mfg | |
| Changed On | 20100310 | |
| Last Changed At | 182454 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | ============== Master Data for Cost Objects ============================= | |||
| 2 | & & already exists | |||
| 3 | Cost object & does not exist | |||
| 4 | Saving master record for & & | Space: object requires documentation | ||
| 5 | No data was changed | |||
| 6 | System error in database & in table & | |||
| 7 | & & already being processed by user & | |||
| 8 | System error: & & cannot be locked | |||
| 9 | Cost object & cannot be posted to | |||
| 10 | Cost object & was not deleted | |||
| 11 | You cannot delete cost object & | |||
| 12 | & & deleted | |||
| 13 | No text exists in language & | |||
| 14 | System error when object numbers generated for cost object & | |||
| 15 | No long text exists for & & | |||
| 16 | Cost object does not exist | |||
| 17 | You cannot transfer cost object & | |||
| 18 | Enter a valid name | |||
| 19 | You cannot assign to the higher-level cost object & | |||
| 20 | Enter a valid object currency | |||
| 21 | CO area of higher-level cost object transferred | |||
| 22 | CO area & differs from that of higher-level cost object | |||
| 23 | Cost object not linked to complete hierarchy | |||
| 24 | System error: Cost object hierarchy contains a loop | |||
| 25 | Function & not allowed | |||
| 26 | Variance key of higher-level cost object was transferred | |||
| 27 | Variance key & differs from that of the higher-level cost object | |||
| 28 | Var. key of lower-level cost objects overwritten with new value | |||
| 29 | Variance key reset to original value | |||
| 30 | You cannot save now because cost object & is being processed | |||
| 31 | Enter a controlling area, company code, or plant | |||
| 32 | Enter company code or plant | |||
| 33 | Single object assignment: enter a plant | Space: object requires documentation | ||
| 34 | No company codes are assigned to controlling area & | |||
| 35 | No valuation areas are assigned to company code & (T001K) | |||
| 36 | No plants are assigned to valuation area & (T001W) | |||
| 37 | Plant & is not assigned to a company code | |||
| 38 | Plant & is not assigned to a controlling area | |||
| 39 | Plant & does not belong to controlling area & | |||
| 40 | Plant & does not belong to company code & | |||
| 41 | Enter business area | |||
| 42 | Company code currency transferred | |||
| 43 | Enter costing sheet | |||
| 44 | First enter the costing sheet | |||
| 45 | No overhead keys exist for costing sheet & | |||
| 46 | Overhead key & not available in costing sheet & | |||
| 47 | System error during & in file & | |||
| 48 | Costing sheet does not exist for cost obejct | |||
| 49 | Cost object & does not exist on & | |||
| 50 | Cost object & does not belong to controlling area & | |||
| 51 | Cost object & does not belong to company code & | |||
| 52 | Cost object & does not belong to business area & | |||
| 53 | Profit center & does not exist | |||
| 54 | Cost object & logically deleted | |||
| 55 | A cost object cannot be assigned to itself | |||
| 56 | Cost object & was marked as top node of hierarchy (*) | |||
| 57 | Cost object & is already marked as top node of hierarchy (*) | |||
| 58 | Cost object category & does not exist | |||
| 59 | You cannot maintain or display & & with this function | |||
| 60 | Cost object category & not allowed with this function | |||
| 61 | Higher-level cost object is of a different cost object category (&) | |||
| 62 | Referenced cost object is of a different cost object category (&) | |||
| 63 | Transaction & not allowed for cost object ID & | |||
| 64 | No top node (*) defined for cost object hierarchy | |||
| 65 | Cost object & cannot be defined as top node of hierarchy | |||
| 66 | Cost estimate already exists for cost object & | |||
| 67 | Cost estimate does not yet exist for cost object & | |||
| 68 | Function is not allowed | |||
| 69 | Enter a cost object | |||
| 70 | Set the controlling area | |||
| 71 | Company code of next-higher cost object transferred | |||
| 72 | Company code & does not match that of next-highest cost object | |||
| 73 | Profit center & is currently invalid | |||
| 74 | No profit center entered, although profit center accounting is active | |||
| 75 | & & is flagged for deletion - display only | |||
| 76 | Cost object & is marked for deletion -> assignment not allowed | |||
| 77 | System error: Parent cost object & does not exist | |||
| 78 | Deletion flag for cost object & cannot be removed | |||
| 79 | Single objects are assigned to cost object & | |||
| 80 | No cost objects are assigned to cost object & | |||
| 81 | Choose a lower-level cost object | |||
| 82 | No single objects are assigned to & & | |||
| 83 | Settlement rule for cost object & generated automatically | |||
| 84 | Cost object & is not assigned to any plant | |||
| 85 | Plant & is not the plant of the higher-level cost object | |||
| 86 | Using the plant of the higher-level cost object | |||
| 87 | Business area & not same as that of higher-level cost object | |||
| 88 | Referenced object & is not a product group | |||
| 89 | & is not a cost object of the expected cost object type | Space: object requires documentation | ||
| 90 | & is not a CO product group | Space: object requires documentation | ||
| 91 | ============== Single Objects Cost Object Hierarchy (Cont'd at 650) ===== | Space: object requires documentation | ||
| 92 | Material & is already assigned without production process | Space: object requires documentation | ||
| 93 | Material & requires an alternative routing | |||
| 94 | Material & requires a production version | |||
| 95 | Unsaved entries cannot be retrieved | |||
| 96 | Entries already noted | |||
| 97 | Group & does not contain any routings for material & | |||
| 98 | No routing &/group & for material & | |||
| 99 | Enter a routing group | |||
| 100 | Enter a group counter for an alternative routing | |||
| 101 | No routings exist for material & | |||
| 102 | You cannot assign single objects to cost object & | |||
| 103 | Production version does not exist for material & | |||
| 104 | Enter only one single object | |||
| 105 | Single object is already assigned to a cost object | |||
| 106 | Enter a single object | |||
| 107 | Plant & differs from the plant of cost object & | |||
| 108 | The combination plant & / material & is invalid | |||
| 109 | Cost object has been posted to. You can only delete new entries | |||
| 110 | Only new entries can be changed | |||
| 111 | Single object already assigned to &1 &2 | Space: object requires documentation | ||
| 112 | Entry already exists | |||
| 113 | Changes were held | |||
| 114 | Entry number & does not exist | |||
| 115 | Material & has no alternative rtg with group counter & | |||
| 116 | WBS element & does not exist | |||
| 117 | Enter an alternative routing or a version, but not both | |||
| 118 | Entry & already exists | |||
| 119 | DO NOT USE | Space: object requires documentation | ||
| 120 | Order & does not exist | |||
| 121 | ======= Summarization/Reporting ========================================= | |||
| 122 | Enter a valid time frame | |||
| 123 | Position the cursor on a cost object or a single object | |||
| 124 | No higher-level cost object exists | |||
| 125 | System error: Function & (SYST-SUBRC=&) | |||
| 126 | Analysis not available for the selected object | |||
| 127 | No reports exist for the chosen object | |||
| 128 | The report you selected has not been generated. Please generate it | |||
| 129 | User & has no authorization for the selected report | |||
| 130 | No reports exist for user & for the selected object | |||
| 131 | No report was selected | |||
| 132 | Please position the cursor on a selected report | |||
| 133 | User & has no authorization for the selected cost element group | |||
| 134 | No cost element groups exist | |||
| 135 | No cost element group was selected | |||
| 136 | System error: Cost element set destroyed (internal error) | |||
| 137 | No data exists for the selected summarization object | |||
| 138 | Report was selected | |||
| 139 | Report executed for summarization object | |||
| 140 | Report executed for data entry object | |||
| 141 | No data exists for the selected data entry object | |||
| 142 | Variance settings for plant &/material & ignored | |||
| 143 | Mat. & & does not have standard price control (val. cat. &) | |||
| 144 | Error while reading valuation data for &2/&1 | Space: object requires documentation | ||
| 145 | Order & cannot be assigned | |||
| 146 | Assignment of single object to cost object saved | |||
| 147 | Assignment of single object to cost object deleted | |||
| 148 | Planning for & saved | |||
| 149 | Single object can only be assigned to one cost object node | Space: object requires documentation | ||
| 150 | Single object cannot be transferred | |||
| 151 | Material is a co-product - it cannot be assigned | |||
| 152 | Material has material type & - it cannot be assigned | |||
| 153 | Material is a raw material - it cannot be assigned | |||
| 154 | Deleting the assignment may cause inconsistencies: actual costs exist | |||
| 155 | DO NOT USE | Space: object requires documentation | ||
| 156 | DO NOT USE | Space: object requires documentation | ||
| 157 | Hierarchy does not exist | |||
| 158 | Function & not supported for & | |||
| 159 | Changes to control indicators are critical | |||
| 160 | Cost object & does not allow assignment of single objects | |||
| 161 | & & contains distribution rule with settlement type & | |||
| 162 | & & for material & contains distribution rule with settlement type & | |||
| 163 | DO NOT USE | Space: object requires documentation | ||
| 164 | & & will be settled to & - assignment not possible | |||
| 165 | Maximum number of single objects reached - no more assignments possible | |||
| 166 | Object not assigned to & & - cannot delete | |||
| 167 | Assignment of single object to cost object &v1& not allowed | |||
| 168 | DO NOT USE | Space: object requires documentation | ||
| 169 | DO NOT USE | Space: object requires documentation | ||
| 170 | & & has actual costs - deletion may lead to inconsistencies | |||
| 171 | Plant & does not belong to the controlling area of cost object & | |||
| 172 | Material &1/plant &2 is being processed by user &3 | Space: object requires documentation | ||
| 173 | Material &1/plant &2/version &3 being processed by user &4 | Space: object requires documentation | ||
| 174 | Material/plant &/& not assigned to any hierarchy | Space: object requires documentation | ||
| 175 | Material/plant/version &/&/& not assigned to any hierarchy | Space: object requires documentation | ||
| 176 | DO NOT USE | Space: object requires documentation | ||
| 177 | Object & not assigned to any hierarchy | Space: object requires documentation | ||
| 178 | Material/plant/production process &/&/& not assigned to any hierarchy | Space: object requires documentation | ||
| 179 | ======= Archiving ======================================================= | |||
| 180 | System error: Archiving cost object & is not allowed | |||
| 181 | No messages exist | Space: object requires documentation | ||
| 182 | Cost object and dependent data archived | The short text describes the object sufficiently | ||
| 183 | Snapshot created for cost object and dependent data | The short text describes the object sufficiently | ||
| 184 | Cost object and dependent data destroyed | The short text describes the object sufficiently | ||
| 185 | >> Planning processor: Planning for periodic cost object << | |||
| 186 | Operation &1 not allowed for cost object &3 | |||
| 187 | ============== Period Closing (General) ================= | Space: object requires documentation | ||
| 188 | Orders for cost objects cannot be selected without hierarchy | Space: object requires documentation | ||
| 189 | Progress display on | Space: object requires documentation | ||
| 190 | Progress display off | Space: object requires documentation | ||
| 191 | Breakpoint set: & | Space: object requires documentation | ||
| 192 | Breakpoint deactivated | Space: object requires documentation | ||
| 193 | Test mode "Process subhierarchy" active | Space: object requires documentation | ||
| 194 | Test mode "Process subhierarchy" deactivated | Space: object requires documentation | ||
| 195 | Test mode "Only process order" active | Space: object requires documentation | ||
| 196 | Test mode "Only process order" deactivated | Space: object requires documentation | ||
| 197 | Test mode "Only process material" active | Space: object requires documentation | ||
| 198 | Test mode "Only process material" deactivated | Space: object requires documentation | ||
| 199 | Parallel processing active | Space: object requires documentation | ||
| 200 | Parallel processing deactivated | Space: object requires documentation | ||
| 201 | Test mode "Display Interim Results" activated | Space: object requires documentation | ||
| 202 | Test mode "Display Interim Results" deactivated | Space: object requires documentation | ||
| 203 | Top node for &1 selected | Space: object requires documentation | ||
| 204 | ======= Variance Calculation ============================================ | |||
| 205 | The controlling area will be ignored | |||
| 206 | Please enter the cost object hierarchy | |||
| 207 | Cost object ID & is not a cost object node | Space: object requires documentation | ||
| 208 | System error: Unknown object type & in FORM & (internal error) | |||
| 209 | System error: Error in message handler in & | |||
| 210 | System error: Error in function module 'FIRST_DAY_IN_PERIOD_GET' | |||
| 211 | Variance key does not exist for cost object | |||
| 212 | & is not the name of any cost object hierarchy in CO area & | |||
| 213 | Set the controlling area | |||
| 214 | Distribution function active for cost object hierarchy & | |||
| 215 | Cost object & still has actual costs that must be distributed | Space: object requires documentation | ||
| 216 | No worklist to be processed available | Space: object requires documentation | ||
| 217 | Joint prod. active (!): Presettlement of co-products, rework required! | Space: object requires documentation | ||
| 218 | ====== Authorizations =================================================== | |||
| 219 | You have no authorization for activity "&" for cost obj. cat. & | |||
| 220 | You have no authorization for activity "&" for cost object cat. & | |||
| 221 | ======= Overhead Calculation ============================================ | |||
| 222 | Enter fiscal year and period or value date | |||
| 223 | Do not exceed the maximum value & for period & | |||
| 224 | System error: Error in function module 'K_GET_HIERARCHY' | |||
| 225 | System error: Error in function module 'DATE_TO_PERIOD_CONVERT' | |||
| 226 | CO area & differs from CO area & of cost object & | |||
| 227 | Value date does not fall within the specified fiscal year | |||
| 228 | Controlling area & does not exist | |||
| 229 | Cost object controlling in CO area & and fiscal year & not active | |||
| 230 | Warning: Processing will be carried out for entire CO area & | |||
| 231 | Overhead application for cost obj. & contains errors (log created) | |||
| 232 | Overhead application for cost obj. & contains no errors (see statistics) | |||
| 233 | Select single processing or hierarchy processing | |||
| 234 | Overhead posted | |||
| 235 | Overhead not posted | |||
| 236 | Further processing in controlling area only possible with hierarchy | |||
| 237 | No complete cost object hierarchies exist in CO area & | |||
| 238 | No overhead could be calculated for cost object & | |||
| 239 | Indicator for background processing ignored | |||
| 240 | JOB could not be opened | |||
| 241 | Request report for background processing run incorrectly | |||
| 242 | Batch processing canceled | |||
| 243 | ======= Distribution =============================================== | |||
| 244 | Object & not included in distribution | |||
| 245 | Object & has no reference base for distribution | |||
| 246 | Object & has no allocation bases | |||
| 247 | Target costs cannot be calculated for object &/& | |||
| 248 | Enter a permissible value | |||
| 249 | Internal error with object & / & / & | |||
| 250 | Target cost version missing | |||
| 251 | Hierarchy & not fully processed because object & has errors | |||
| 252 | Cost element group not maintained for object & | |||
| 253 | Operation & locked by user & | |||
| 254 | Set target cost version first | |||
| 255 | Distribution successfully reversed | |||
| 256 | Errors occurred during reversal | |||
| 257 | Errors occurred with & during reversal | |||
| 258 | Operation & locked in period & | |||
| 259 | Only subhierarchy of hierarchy & was processed | |||
| 260 | Specify only one target cost version | |||
| 261 | Cost element/origin & could not be distributed | Space: object requires documentation | ||
| 262 | ======== Settlement ================================================ | |||
| 263 | Cannot find senders to be settled - check your entries | |||
| 264 | <<<<<<<<<<<<< Reserved for SAPLCOZT >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> | |||
| 265 | Number of productive company codes: & | |||
| 266 | CO area & contains data from productive company codes not assigned to it | |||
| 267 | You are not authorized to delete CO transaction data | |||
| 268 | CCode-CO area assignment missing / No FI transaction data in CO | |||
| 269 | The routine to delete CO transaction data will not be carried out | |||
| 270 | The CO transaction data for CCode & is defined in different CO areas | |||
| 271 | CCode-CO area assignment missing / CO transaction data exists | |||
| 272 | Controlling area & does not contain any transaction data | |||
| 273 | CO transaction data in controlling area $ was completely $ $ | |||
| 274 | You are not authorized to delete CO transaction data | |||
| 275 | Routine to delete primary cost elements will not be carried out | |||
| 276 | Data missing or inconsistent | |||
| 277 | Only one selection criterion allowed for the deletion objects | |||
| 278 | Group & does not exist | |||
| 279 | Group & is assigned to & & | |||
| 280 | Group & is not a & | |||
| 281 | No & were selected | |||
| 282 | Transaction data still exists in controlling area & | |||
| 283 | The number of records to be deleted in each deletion cycle must be <= & | |||
| 284 | No controlling area is assigned to company code & | |||
| 285 | Group & contains an interval | |||
| 286 | You may only select one archiving key | |||
| 287 | Report category invalid for logical database & | |||
| 288 | Test report for archive analysis - no reloading | |||
| 289 | Path name required | |||
| 290 | No cost object hierarchies were selected | |||
| 291 | No canceled documents for allocation exist | |||
| 292 | Value types are fixed | |||
| 293 | Deletion program executed for transaction data in controlling area | Space: object requires documentation | ||
| 294 | Deletion program started for cost centers | |||
| 295 | Deletion program started for cost elements | |||
| 296 | Deletion program started for activity types | |||
| 297 | Callup of FM to delete transaction data in controlling area & | |||
| 298 | Delete program for business processes started | |||
| 299 | Deletion program executed for supplied controlling areas | Space: object requires documentation | ||
| 300 | Error while writing to application log (&) | Space: object requires documentation | ||
| 301 | <<<<<<<<<<<<<<<<<Reserved for SAPLKCTR>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> | |||
| 302 | Data locked by user & (table &) | |||
| 303 | No correction number was specified | |||
| 304 | Incorrect function module call & & | |||
| 305 | & & & & | |||
| 306 | ============= BAPI Messages =========================================== | Space: object requires documentation | ||
| 307 | No authorization to display controlling areas | |||
| 308 | Controlling area & does not exist | |||
| 309 | No controlling areas exist | |||
| 310 | ============ Euro Rounding Errors with Cost Object Hierarchy ============ | Space: object requires documentation | ||
| 311 | Rounding error on && exceeds maximum rounding difference | Space: object requires documentation | ||
| 312 | No credit exists for secondary debits of && | Space: object requires documentation | ||
| 313 | No credit exists for primary debits of && | Space: object requires documentation | ||
| 314 | No rounding differences determined | Space: object requires documentation | ||
| 315 | Rounding difference is subtracted from && | Space: object requires documentation | ||
| 316 | ============== Single Objects Cost Object Hierarchy (Continued)========== | Space: object requires documentation | ||
| 317 | Specify material & only with production process | Space: object requires documentation | ||
| 318 | Deleting the assignment can result in inconsistencies (see long text) | Space: object requires documentation | ||
| 319 | Production process & not possible for material & | Space: object requires documentation | ||
| 320 | ============== Master Data for Product Group ============================ | |||
| 321 | Product group & does not exist | |||
| 322 | Product group & cannot be deleted | |||
| 323 | Assignment to higher-level product group & is not possible | |||
| 324 | Controlling area of higher-level product group used | |||
| 325 | Controlling area & not the same as that of higher-level product group | |||
| 326 | Enter a plant | |||
| 327 | Product group & is flagged for deletion - assignment not allowed | |||
| 328 | No lower-level product groups are assigned to product group & | |||
| 329 | Choose a lower-level product group | |||
| 330 | No single objects can be assigned to product group & | |||
| 331 | No higher-level product group exists | |||
| 332 | Maximum number of single objects reached - no more assignments possible | |||
| 333 | Plant & does not belong to controlling area of product group & | |||
| 334 | Product group & does not exist on & | |||
| 335 | Messages issued during selection: see log | Space: object requires documentation | ||
| 336 | No data at plant level for material & | Space: object requires documentation | ||
| 337 | No materials could be selected | Space: object requires documentation | ||
| 338 | Errors occurred when assigning materials to product group | Space: object requires documentation | ||
| 339 | Product group cannot be assigned to itself | Space: object requires documentation | ||
| 340 | Report program RKKPPGR0 can only be executed on-line | Space: object requires documentation | ||
| 341 | ============== Master Data for List Entry =============================== | Space: object requires documentation | ||
| 342 | Saving master records | Space: object requires documentation | ||
| 343 | Function not possible - maximum number of items reached | Space: object requires documentation | ||
| 344 | Item & does not exist | Space: object requires documentation | ||
| 345 | Enter a different designation | Space: object requires documentation | ||
| 346 | Item already exists for & & | Space: object requires documentation | ||
| 347 | No items exist | Space: object requires documentation | ||
| 348 | Select only one item | Space: object requires documentation | ||
| 349 | Select an item before choosing the function | Space: object requires documentation | ||
| 350 | Item copied. Now use the Paste function | Space: object requires documentation | ||
| 351 | First enter all required data for the item | Space: object requires documentation | ||
| 352 | Position the cursor at the point where you want to paste the item | Space: object requires documentation | ||
| 353 | Cannot paste: clipboard is empty | Space: object requires documentation | ||
| 354 | Position the cursor at the point where you want to insert the item | Space: object requires documentation | ||
| 355 | Enter the data for the item inserted | Space: object requires documentation | ||
| 356 | First select the items to be deleted | Space: object requires documentation | ||
| 357 | Select the end of the block | Space: object requires documentation | ||
| 358 | Position the cursor on the item you want to select | Space: object requires documentation | ||
| 359 | & item(s) deleted | Space: object requires documentation | ||
| 360 | & items defined as top node of hierarchy | Space: object requires documentation | ||
| 361 | Function "&" not available for the selected column | Space: object requires documentation | ||
| 362 | First select a column | Space: object requires documentation | ||
| 363 | Position the cursor on an item with the column value to be set | Space: object requires documentation | ||
| 364 | Only & of & items entered processed | Space: object requires documentation | ||
| 365 | ================ Graphical Hierarchy Maintenance========================= | Space: object requires documentation | ||
| 366 | Internal message & & & & | Space: object requires documentation | ||
| 367 | Hierarchy &1 : A node is currently locked by user &2 | Space: object requires documentation | ||
| 368 | Specify a cost object category or a reference cost object | Space: object requires documentation |
History
| Last changed on/by | 20100310 | SAP | |
| SAP Release Created in |