SAP ABAP Message Class KZ Message Number 520 (Routine to delete primary cost elements will not be carried out)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KKP (Package) Cost Object Controlling for Repetitive Mfg: General
Attribute
Message class KZ  
Short Description Cost Object Repetitive Mfg / Process Mfg    
Message Number 520  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Routine to delete primary cost elements will not be carried out
Help Document

Diagnosis

You want to read or delete all the primary cost elements in a controlling area based on the G/L accounts in the corresponding company code. A routine is accessed to do this. This routine is not performed if one of the following errors occurs.

In this case error was determined during the check.

(1) The cost elements are not assigned to a controlling area. This meant that the system could not determine any primary cost elements.

(2) A controlling area already containing productive company codes with primary cost elements is assigned to the company code. The cost elements cannot be deleted since they already exist for productive company codes.

(3) A controlling area containing productive company codes without primary cost elements is assigned to the company code. This means that no cost elements are to be deleted.

(4) No primary cost elements exist in the assigned controlling area.

Procedure

Fulfill the conditions so that you can perform the routine (if you still need to delete the primary cost elements).

History
Last changed on/by 20100310  SAP 
SAP Release Created in