SAP ABAP Message Class KZ Message Number 091 (Material & is already assigned without production process)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KKP (Package) Cost Object Controlling for Repetitive Mfg: General
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KKP (Package) Cost Object Controlling for Repetitive Mfg: General
Attribute
Message class | KZ | ||
Short Description | Cost Object Repetitive Mfg / Process Mfg | ||
Message Number | 091 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20100310 |
Message Text
Material & is already assigned without production process
Help Document
Diagnosis
You are attempting to assign a material (or the combination material/ production process) to a cost object node. However, the material (or the combination material/production process) has already been assigned to another cost object node.
System Response
Procedure
Enter a different object.
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |