SAP ABAP Message Class KZ Message Number 148 (Single object can only be assigned to one cost object node)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KKP (Package) Cost Object Controlling for Repetitive Mfg: General
Attribute
Message class KZ  
Short Description Cost Object Repetitive Mfg / Process Mfg    
Message Number 148  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20100310   
Message Text
Single object can only be assigned to one cost object node
Help Document

Diagnosis

You are attempting to assign a material (or the combination material/production process) to a cost object node. However, this object has already been assigned to another cost object node.

System Response

Procedure

Enter a different object.

History
Last changed on/by 20100310  SAP 
SAP Release Created in