SAP ABAP Message Class KZ Message Number 092 (Material & requires an alternative routing)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KKP (Package) Cost Object Controlling for Repetitive Mfg: General
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KKP (Package) Cost Object Controlling for Repetitive Mfg: General
Attribute
Message class | KZ | ||
Short Description | Cost Object Repetitive Mfg / Process Mfg | ||
Message Number | 092 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Material & requires an alternative routing
Help Document
Diagnosis
You have not specified an alternative routing for material .
This material has already been assigned to a cost object ID with an alternative routing.
Material can therefore only be assigned to a further cost object ID with an alternative routing.
System Response
Procedure
- Enter an alternative routing for material , or
- Enter another material
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |