SAP ABAP Message Class KZ Message Number 141 (Variance settings for plant &/material & ignored)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KKP (Package) Cost Object Controlling for Repetitive Mfg: General
Attribute
Message class KZ  
Short Description Cost Object Repetitive Mfg / Process Mfg    
Message Number 141  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Variance settings for plant &/material & ignored
Help Document

Diagnosis

A variance key was specified for the assigned material in the material master record.

System Response

The system will ignore the control parameters for variance calculation that are associated with the variance key from the material master record.

Variance calculation within the cost object hierarchy uses only the variance key from the highest cost object node of the hierarchy. This variance key is defaulted into the highest node of the hierarchy based on the combination cost object category/cost object profile, and can be overwritten.

If you want to calculate variances for the orders (product cost collectors and manufacturing orders) assigned to the cost object hierarchy, the Scrap indicator must be selected in the variance key specified in the highest cost object node.

Procedure

History
Last changed on/by 20100310  SAP 
SAP Release Created in