SAP ABAP Message Class /MRSS/SGE (Messages for the Scheduling Engine)
Basic Data
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷
⤷
Attributes
| Message class | /MRSS/SGE | |
| Short Description | Messages for the Scheduling Engine | |
| Changed On | 20141109 | |
| Last Changed At | 161336 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | Critical exception error has occurred; contact your system administrator | Space: object requires documentation | ||
| 2 | Start time of assignment is later than the end time | Space: object requires documentation | ||
| 3 | Personnel resource &1 cannot be assigned to item &2 | Space: object requires documentation | ||
| 4 | Tool resource &1 cannot be assigned to item &2 | Space: object requires documentation | ||
| 5 | Tool resource &1 cannot be used as tool &2 | Space: object requires documentation | ||
| 6 | No individual object exists for tool &1 (&2) | Space: object requires documentation | ||
| 7 | Action cannot be undone | Space: object requires documentation | ||
| 8 | Action cannot be restored | Space: object requires documentation | ||
| 9 | Cannot determine start time for the demand | Space: object requires documentation | ||
| 10 | Cannot determine end time for the demand | Space: object requires documentation | ||
| 11 | Cannot determine duration of the demand | Space: object requires documentation | ||
| 12 | Link possible between personnel resource and tool only | Space: object requires documentation | ||
| 13 | Assignment demand cannot be changed | Space: object requires documentation | ||
| 14 | Enter a valid time interval for link [&1,&2] | Space: object requires documentation | ||
| 15 | Invalid relationship type &1 for link | Space: object requires documentation | ||
| 16 | Link already exists in the specified time interval | Space: object requires documentation | ||
| 17 | Selected demand is not an operation relevant to resource planning | Space: object requires documentation | ||
| 18 | Start time must be earlier than end time | Space: object requires documentation | ||
| 19 | Resource &1 is not a personnel resource | Space: object requires documentation | ||
| 20 | Selected demand &1 is not relevant for resource planning | Space: object requires documentation | ||
| 21 | Assignment &1 for resource &2 is being processed by user &3 | Space: object requires documentation | ||
| 22 | Resource &1 is being processed by user &3 on &2 | Space: object requires documentation | ||
| 23 | Operation &1 is being processed by user &2 | Space: object requires documentation | ||
| 24 | Link &1 is being processed by user &2 | Space: object requires documentation | ||
| 25 | Time allocation &1 for resource &2 is being processed by user &3 | Space: object requires documentation | ||
| 26 | Service process &1 cannot be assigned to resource &2 | Space: object requires documentation | ||
| 27 | Start date &1 is earlier than the start date &2 of the planning period | Space: object requires documentation | ||
| 28 | End date &1 is later than the end date of the planning period, &2 | Space: object requires documentation | ||
| 29 | Resource &1 already exists in planning board | Space: object requires documentation | ||
| 30 | Resource &3 is not available | Space: object requires documentation | ||
| 31 | Cannot determine a planning board profile | Space: object requires documentation | ||
| 32 | Planning board profile &1 not found | Space: object requires documentation | ||
| 33 | &1 is not assigned to an RP node as a planner in period &2-&3 | Space: object requires documentation | ||
| 34 | Time interval for teams must not be empty | Space: object requires documentation | ||
| 35 | Resource &1 not yet created in the MRS system | Space: object requires documentation | ||
| 36 | GUID &1 does not represent an individual object | Space: object requires documentation | ||
| 37 | Could not initialize resource &1 | Space: object requires documentation | ||
| 38 | Demand &1 does not exist in the MRS system | Space: object requires documentation | ||
| 39 | No team exists for GUID &1 | Space: object requires documentation | ||
| 40 | Order &1 is not consistent with resource planning | Space: object requires documentation | ||
| 41 | Cannot change capacity planning for team &1 | Space: object requires documentation | ||
| 42 | Cannot delete team &1; assignments exist | Space: object requires documentation | ||
| 43 | Assignment is not within the validity of the team | Space: object requires documentation | ||
| 44 | Team is not assigned to a resource planning node | Space: object requires documentation | ||
| 45 | Assignments for the team exist that are not within the specified validity | Space: object requires documentation | ||
| 46 | Assignment must match the validity of the team | Space: object requires documentation | ||
| 47 | Team description is missing | Space: object requires documentation | ||
| 48 | Planning board was saved successfully | Space: object requires documentation | ||
| 49 | Planning board was saved and updated successfully | Space: object requires documentation | ||
| 50 | Error while saving; reset the planning board | Space: object requires documentation | ||
| 51 | You are not authorized to edit the data for &1 | The short text describes the object sufficiently | ||
| 52 | You are not authorized to display the data for &1 | The short text describes the object sufficiently | ||
| 53 | You are not authorized to edit the planning board for orders | Space: object requires documentation | ||
| 54 | You are not authorized to display the planning board for orders | Space: object requires documentation | ||
| 55 | Error during the authorization check (authorization object &1) | Space: object requires documentation | ||
| 56 | Resource &1 locked on &2 by user &3 | Space: object requires documentation | ||
| 57 | Operation &1 is already locked by user &2 | Space: object requires documentation | ||
| 58 | Assignment of &1 to a resource planning node is not unique in [&2,&3] | Space: object requires documentation | ||
| 59 | Data was not changed | Space: object requires documentation | ||
| 60 | Assignment duration is less than the minimum duration (&1 minutes) | Space: object requires documentation | ||
| 61 | Utilization must be greater than 0% and less than or equal to 100% | Space: object requires documentation | ||
| 62 | Assignment splitting is not possible for teams from capacity planning | Space: object requires documentation | ||
| 63 | Assignment duration is too short for splitting | Space: object requires documentation | ||
| 64 | Error during relationship check; no network available for order &1 | Space: object requires documentation | ||
| 65 | Error in WFM Core; &1 &2 &3 | Space: object requires documentation | ||
| 66 | Error while creating assignment in WFM Core | Space: object requires documentation | ||
| 67 | Error while changing assignment in WFM Core | Space: object requires documentation | ||
| 68 | Time allocation type is missing | Space: object requires documentation | ||
| 69 | Time allocation is not available | Space: object requires documentation | ||
| 70 | Assignment is not available | Space: object requires documentation | ||
| 71 | Links are inactive in the planning board profile | Space: object requires documentation | ||
| 72 | Teams are inactive in the planning board profile | Space: object requires documentation | ||
| 73 | Error while initializing resource &1 (type: &2) | Space: object requires documentation | ||
| 74 | Resources in a link cannot be changed | Space: object requires documentation | ||
| 75 | Error initializing assignment &1 (resource: &2) | Space: object requires documentation | ||
| 76 | Cannot change resource of a time allocation | Space: object requires documentation | ||
| 77 | Demand &1 cannot be assigned to resource &2 | Space: object requires documentation | ||
| 78 | Duration of time allocation must be greater than 0 | Space: object requires documentation | ||
| 79 | Automatic assignment creation of demand &1 failed | Space: object requires documentation | ||
| 80 | No geolocation is available for resource &1 | Space: object requires documentation | ||
| 81 | No geolocation is available for demand &1 (business partner: &2) | Space: object requires documentation | ||
| 82 | Capacitive assignment overlaps with absence between &1 and &2. | Space: object requires documentation | ||
| 83 | Capacitive assignment overlaps with normal assignment at &1 | Space: object requires documentation | ||
| 84 | Demand &1 is implicitly locked; unlocking is not possible | Space: object requires documentation | ||
| 85 | The selected element is not a network activity | Space: object requires documentation | ||
| 86 | You can maintain the log text only for a network operation | Space: object requires documentation | ||
| 87 | For capacitive assignments, duration must be less than the time frame | Space: object requires documentation | ||
| 88 | Demand &1 does not allow capacitive planning | Space: object requires documentation | ||
| 89 | You are not authorized to edit the data for &1 | Space: object requires documentation | ||
| 90 | You are not authorized to select the resource for RP node &1 | Space: object requires documentation | ||
| 91 | You are not authorized to select the demand for RP node &1 | Space: object requires documentation | ||
| 92 | Manual lock cannot be released: object since changed | Space: object requires documentation | ||
| 93 | Cannot change assignments in current demand status | The short text describes the object sufficiently | ||
| 94 | Determination of tool or resource required to obtain links | The short text describes the object sufficiently | ||
| 95 | Resource &1 is not available | The short text describes the object sufficiently | ||
| 96 | No links data exists for the resource specified | The short text describes the object sufficiently | ||
| 97 | Cannot create link; data is missing | The short text describes the object sufficiently | ||
| 98 | Cannot create link; time stamp is empty | The short text describes the object sufficiently | ||
| 99 | Personnel number not identified for GUID &1 | The short text describes the object sufficiently | ||
| 100 | The resource(s) cannot be planned in one operation (&1) | Space: object requires documentation | ||
| 101 | Resource &1 is overloaded from &2 to &3 | Space: object requires documentation | ||
| 102 | Resource &1 is not available from &2 to &3 | Space: object requires documentation | ||
| 103 | Assignment &1 violates link to resource &2 | Space: object requires documentation | ||
| 104 | Data for deleting links not provided | The short text describes the object sufficiently | ||
| 105 | Cannot add filtered resource &1 | The short text describes the object sufficiently | ||
| 106 | Tool &1 is not scheduled with assignment &2 | Space: object requires documentation | ||
| 107 | Spare part demand &1 is not available for assignment &2 on &3 | Space: object requires documentation | ||
| 108 | Resources for demand &1 are not scheduled for the same time | Space: object requires documentation | ||
| 109 | Linked resources &1 and &2 for &3 are scheduled in different orders | Space: object requires documentation | ||
| 110 | Assignment &1 violates the link between &2 and &3 | Space: object requires documentation | ||
| 111 | Tool &1 is scheduled several times from &2 to &3 | Space: object requires documentation | ||
| 112 | Resource &1 is not suitable for assignment &2 | Space: object requires documentation | ||
| 113 | Cannot delete link &1 | The short text describes the object sufficiently | ||
| 114 | Team &1 is overloaded from &2 to &3 | Space: object requires documentation | ||
| 115 | Team &1 does not have any capacity from &2 to &3 | Space: object requires documentation | ||
| 116 | Utilization of team &1 is &4% | Space: object requires documentation | ||
| 117 | First assignment for demand &1 starts before the earliest start date &2 | Space: object requires documentation | ||
| 118 | First assignment for demand &1 starts after the latest start date &2 | Space: object requires documentation | ||
| 119 | Last assignment for demand &1 ends before the earliest end date &2 | Space: object requires documentation | ||
| 120 | Last assignment for demand &1 ends after the latest end date &2 | Space: object requires documentation | ||
| 121 | Resource &1 does not have the qualifications required for assignment &2 | Space: object requires documentation | ||
| 122 | Total duration &2 of assignments f. demand &1 is too long (plnd dur. &3) | Space: object requires documentation | ||
| 123 | Total duration &2 of assignments f. demand &1 is too short (plnd dur. &3) | Space: object requires documentation | ||
| 124 | Total duration &2 of assignments f. demand &1 is too long (plnd dur. &3) | Space: object requires documentation | ||
| 125 | Total duration &2 of assignments f. demand &1 is too short (plnd dur. &3) | Space: object requires documentation | ||
| 126 | First assignment for demand &1 starts after the SLA start date &2 | Space: object requires documentation | ||
| 127 | Last assignment for demand &1 ends after the SLA end date &2 | Space: object requires documentation | ||
| 128 | Duration not entered for demand &1 for some assignments | Space: object requires documentation | ||
| 129 | Time stamp is initial for resource &1 | The short text describes the object sufficiently | ||
| 130 | Link &1 deleted successfully | The short text describes the object sufficiently | ||
| 131 | Assignment &3 starts before assignment &1 &2 ends | Space: object requires documentation | ||
| 132 | Assignment &1 &2 ends after demand &3 is planned to start | Space: object requires documentation | ||
| 133 | Assignment &3 starts before demand &1 &2 is planned to end | Space: object requires documentation | ||
| 134 | Start of time stamp cannot be after end of time stamp | The short text describes the object sufficiently | ||
| 135 | Assignment &3 starts before assignment &1 &2 starts | Space: object requires documentation | ||
| 136 | Assignment &1 &2 starts after demand &3 is planned to start | Space: object requires documentation | ||
| 137 | Assignment &3 starts before demand &1 &2 is planned to start | Space: object requires documentation | ||
| 138 | Cannot create link for resource &1 and tool &2 | The short text describes the object sufficiently | ||
| 139 | Assignment &3 ends before assignment &1 &2 ends | Space: object requires documentation | ||
| 140 | Assignment &1 &2 ends after demand &3 is planned to end | Space: object requires documentation | ||
| 141 | Assignment &3 ends before demand &1 &2 is planned to end | Space: object requires documentation | ||
| 142 | Link created successfully for resource &1 and tool &2 | The short text describes the object sufficiently | ||
| 143 | Assignment &3 ends before assignment &1 &2 starts | Space: object requires documentation | ||
| 144 | Assignment &1 &2 starts after demand &3 is planned to end | Space: object requires documentation | ||
| 145 | Assignment &3 ends before demand &1 &2 is planned to start | Space: object requires documentation | ||
| 146 | Time allocation details are missing | The short text describes the object sufficiently | ||
| 147 | Assignment &3 does not start at the same time as assignment &1 | Space: object requires documentation | ||
| 148 | Assignment &1 does not start at same time as demand &3 is plnd to start | Space: object requires documentation | ||
| 149 | Assignment &3 does not start at same time as demand &1 is plnd to start | Space: object requires documentation | ||
| 150 | Error while creating time allocation for resource &1 | The short text describes the object sufficiently | ||
| 151 | Concrete status is already assigned to status &1 | Space: object requires documentation | ||
| 152 | Time allocation for resource &1 created successfully | The short text describes the object sufficiently | ||
| 153 | Time allocation &1 is not changed | The short text describes the object sufficiently | ||
| 154 | Time allocation &1 changed successfully | The short text describes the object sufficiently | ||
| 155 | Time stamp for &1 is empty | The short text describes the object sufficiently | ||
| 156 | Time allocation for resource &1 updated successfully | The short text describes the object sufficiently | ||
| 157 | Time allocation &1 not deleted | The short text describes the object sufficiently | ||
| 158 | Time allocation &1 deleted successfully | The short text describes the object sufficiently | ||
| 159 | Order number must be transferred with operation number | The short text describes the object sufficiently | ||
| 160 | Demand ID or GUID of demand must be provided | The short text describes the object sufficiently | ||
| 161 | Planning is not complete for demand &1 (planned start &2) | Space: object requires documentation | ||
| 162 | No time data available for assignment &1 (planned start &2) | Space: object requires documentation | ||
| 163 | Start of work delayed (&1) for assignment &2 (planned start &3) | Space: object requires documentation | ||
| 164 | End of work delayed (&1) for assignment &2 (planned end &3) | Space: object requires documentation | ||
| 165 | Work not yet ended for assignment &1 (planned end &2) | Space: object requires documentation | ||
| 166 | Premature end of work (&1) for assignment &2 (planned end &3) | Space: object requires documentation | ||
| 167 | &1% completion achieved for assignment &2 | Space: object requires documentation | ||
| 168 | Timeframe for assignment must be provided | The short text describes the object sufficiently | ||
| 169 | Resource must be provided to create assignment | The short text describes the object sufficiently | ||
| 170 | Abstract status &1 is already defined as the mobile status | Space: object requires documentation | ||
| 171 | Demand &1/&2: Automatic creation of assignment failed | Space: object requires documentation | ||
| 172 | You have no authorization for resource &1 from resource planning node &2 | The short text describes the object sufficiently | ||
| 173 | You are not authorized to access order &1 | The short text describes the object sufficiently | ||
| 174 | You have no authorization for resource planning node &1 | The short text describes the object sufficiently | ||
| 175 | No valid assignments were found for assignment GUID &1 | The short text describes the object sufficiently | ||
| 176 | No demands found | The short text describes the object sufficiently | ||
| 177 | No valid assignments found | The short text describes the object sufficiently | ||
| 178 | Assignment key must be provided | The short text describes the object sufficiently | ||
| 179 | Mobile status &1 is already defined as the abstract status | Space: object requires documentation | ||
| 180 | No date rule exists for this demand | The short text describes the object sufficiently | ||
| 181 | Capacitive assignment &1 has duration 0 | Space: object requires documentation | ||
| 182 | Extended assignment &1 has duration 0 | Space: object requires documentation | ||
| 183 | Stretched assignment for resource &1 exceeds planning horizon | Space: object requires documentation | ||
| 184 | MRS: Cannot delete demand for operation &1/&2 | Space: object requires documentation | ||
| 185 | Cannot change demand &1 | The short text describes the object sufficiently | ||
| 186 | Demand &1 does not allow changes due to status | The short text describes the object sufficiently | ||
| 187 | Start date is after end date | The short text describes the object sufficiently | ||
| 188 | Start date is earlier than start date of date rule &1 | The short text describes the object sufficiently | ||
| 189 | End date is later than end date of date rule &1 | The short text describes the object sufficiently | ||
| 190 | Start date &1 and end date &2 are outside planning period | The short text describes the object sufficiently | ||
| 191 | Resource &1 is not valid in period | The short text describes the object sufficiently | ||
| 192 | &2 &3: Field &1 has been changed | The short text describes the object sufficiently | ||
| 193 | Start and end dates must be provided for capacitive assignments | The short text describes the object sufficiently | ||
| 194 | Assignments can only be created for teams | Space: object requires documentation | ||
| 195 | Demand is not an offer (offer status not set) | The short text describes the object sufficiently | ||
| 196 | Offer demand does not have status "Manual resource confirmation" | The short text describes the object sufficiently | ||
| 197 | Offer demand has planned assignments: you cannot reject it | The short text describes the object sufficiently | ||
| 198 | & & & & | The short text describes the object sufficiently | ||
| 199 | Transfer time intervals with resource &1 | The short text describes the object sufficiently | ||
| 200 | No input parameters provided | The short text describes the object sufficiently | ||
| 201 | Link &1 was changed by user &2 | Space: object requires documentation | ||
| 202 | Link &1 was deleted by user &2 | Space: object requires documentation | ||
| 203 | Assignment &1 was changed by user &2 | Space: object requires documentation | ||
| 204 | Assignment &1 was deleted previously | Space: object requires documentation | ||
| 205 | Time allocation &1 was changed by user &2 | Space: object requires documentation | ||
| 206 | Time allocation &1 was deleted previously | Space: object requires documentation | ||
| 207 | Resource &1 was edited by user &3 on &2 | Space: object requires documentation | ||
| 208 | Transaction &1 was processed by user &2 | Space: object requires documentation | ||
| 209 | Operation &1 has since been changed | Space: object requires documentation | ||
| 210 | Operation &1 has since been deleted | Space: object requires documentation | ||
| 211 | Action is not permitted for assignment; check status | Space: object requires documentation | ||
| 212 | GUID for resource &1 not found | The short text describes the object sufficiently | ||
| 213 | Partner role &1 is already assigned | Space: object requires documentation | ||
| 214 | Start and end dates must be in the planning period between &1 and &2 | The short text describes the object sufficiently | ||
| 215 | Tool resource &1 is invalid | The short text describes the object sufficiently | ||
| 216 | Type of assignment is not permitted (&1) | The short text describes the object sufficiently | ||
| 217 | Time allocation deleted successfully | The short text describes the object sufficiently | ||
| 218 | There are no links between resource &1 and tool &2 | The short text describes the object sufficiently | ||
| 219 | Dates of assignment &1 are different from date rule of demand | The short text describes the object sufficiently | ||
| 220 | Could not create assignment for resource &1 | The short text describes the object sufficiently | ||
| 221 | Dur. of stretched assignment &1 for resource &2 is less than availability | Space: object requires documentation | ||
| 222 | Demand already has assignments; distribution is no longer possible | The short text describes the object sufficiently | ||
| 223 | Demand contains a time rule; cannot distribute | The short text describes the object sufficiently | ||
| 224 | Demand in process variant "manual confirmation"; cannot distribute | The short text describes the object sufficiently | ||
| 225 | Time interval is to be transferred | The short text describes the object sufficiently | ||
| 226 | Offer demand not yet arrived; distribution is not possible | The short text describes the object sufficiently | ||
| 227 | Assignment is not within the validity of the team | The short text describes the object sufficiently | ||
| 228 | Assignment for resource &1 is outside validity of team | The short text describes the object sufficiently | ||
| 229 | Demand &1 is already being processed by user &2 | The short text describes the object sufficiently | ||
| 230 | No further information is available | The short text describes the object sufficiently | ||
| 231 | Start time missing | Space: object requires documentation | ||
| 232 | End time missing | Space: object requires documentation | ||
| 233 | Time frame of capacitive assignment is smaller than duration | Space: object requires documentation | ||
| 234 | Time frame of capacitive assignment is equal to duration | Space: object requires documentation | ||
| 235 | Invalid on-call type &1; time allocation not created | The short text describes the object sufficiently | ||
| 236 | Error: external check class for demand type &1 | Space: object requires documentation | ||
| 237 | No work center found for resource | Space: object requires documentation | ||
| 238 | Object type does not correspond to subtype | Space: object requires documentation | ||
| 239 | Start or end time of demand &1 is outside original demand | The short text describes the object sufficiently | ||
| 240 | Start or end time of demand &1 not changed | The short text describes the object sufficiently | ||
| 241 | Selected equipment &1 is invalid | The short text describes the object sufficiently | ||
| 242 | You must adhere to the sum of total work | Space: object requires documentation | ||
| 243 | You must adhere to the sum of the duration | Space: object requires documentation | ||
| 244 | Total work must be larger than 0 | The short text describes the object sufficiently | ||
| 245 | Number of resources must be larger than 0 | The short text describes the object sufficiently | ||
| 246 | No valid resource planning node &1 | The short text describes the object sufficiently | ||
| 247 | No work center found for resource &1 | The short text describes the object sufficiently | ||
| 248 | Assignment probability must be 100% or less | The short text describes the object sufficiently | ||
| 249 | Cannot create assignment; resource is unavailable from &1 &2 to &3 &4 | The short text describes the object sufficiently | ||
| 250 | Time between assignment &1 and &2 is longer than normal working time &3 H | The short text describes the object sufficiently | ||
| 251 | Availability not possible for more than &1 hours; check Customizing | The short text describes the object sufficiently | ||
| 252 | Data for this resource is not buffered in the table | The short text describes the object sufficiently | ||
| 253 | &1 is not a valid resource | The short text describes the object sufficiently | ||
| 254 | &1 is not a valid organizational unit | The short text describes the object sufficiently | ||
| 255 | Buffered resource data is no longer valid | The short text describes the object sufficiently | ||
| 256 | Demand &1 is indicated as no longer changeable | Space: object requires documentation | ||
| 257 | Travel time cannot overlap with the assignment &1) | The short text describes the object sufficiently | ||
| 258 | This function is not supported | The short text describes the object sufficiently | ||
| 259 | Concretization exists in parallel w/ attendance time alloc. from &1 to &2 | The short text describes the object sufficiently | ||
| 260 | Concretization exists in parallel w/ absence time alloc. from &1 to &2 | The short text describes the object sufficiently | ||
| 261 | Calculating travel time requires planning period to be change from & to & | Space: object requires documentation | ||
| 262 | Duration of res. &1 availability longer than that of stretched assgmnt &2 | Space: object requires documentation | ||
| 263 | Resource &1 is overloaded due to the concretization of &2 to &3 | The short text describes the object sufficiently | ||
| 264 | Team &1 is overloaded due to the concretization of &2 to &3 | The short text describes the object sufficiently | ||
| 265 | Changing parallel assignments | The short text describes the object sufficiently | ||
| 266 | Start time of arrival is later than end time of arrival (&1) | The short text describes the object sufficiently | ||
| 267 | Start time of departure is later than end time of departure (&1) | The short text describes the object sufficiently | ||
| 268 | For resource &, the travel time falls in a non-availability from & to & | The short text describes the object sufficiently | ||
| 269 | For team &1, the travel time falls in a non-availability from &2 to &3 | The short text describes the object sufficiently | ||
| 270 | Assignment GUID &1 is not a valid GUID | The short text describes the object sufficiently | ||
| 271 | Cannot redo any more work steps | Space: object requires documentation | ||
| 272 | You cannot save a temporary, external demand key | The short text describes the object sufficiently | ||
| 273 | Enter a value for concretization option for parallel stretched assignment | The short text describes the object sufficiently | ||
| 274 | Assignment &1 must be within planning horizon | The short text describes the object sufficiently | ||
| 275 | Start date &1 is earlier than the start date &2 of the planning period | The short text describes the object sufficiently | ||
| 276 | End date &1 is later than the end date of the planning period, &2 | The short text describes the object sufficiently | ||
| 277 | Start and end dates must be in the planning period between &1 and &2 | The short text describes the object sufficiently | ||
| 278 | Source code called is obsolete (&1) | The short text describes the object sufficiently | ||
| 279 | Geolocations not maintained for demand &1 | The short text describes the object sufficiently | ||
| 280 | Address for demand &1 is not maintained | The short text describes the object sufficiently | ||
| 281 | Object for GUID &1 does not exist | The short text describes the object sufficiently | ||
| 282 | Resource &1 was removed from the current selection | The short text describes the object sufficiently | ||
| 283 | Cannot remove resource &1 from the current selection | The short text describes the object sufficiently | ||
| 284 | Intelligent shifting is not allowed for capacitive planning in teams | The short text describes the object sufficiently | ||
| 285 | Resource &1 does not have any information about the geolocation | The short text describes the object sufficiently | ||
| 286 | Not all resources are displayed (insufficient authorization) | The short text describes the object sufficiently | ||
| 287 | Error in MRS: &1 &2 &3 | The short text describes the object sufficiently | ||
| 288 | Team &1 is overloaded by &2 hours work | The short text describes the object sufficiently | ||
| 289 | Duration of link is outside validity period of team | The short text describes the object sufficiently | ||
| 290 | Subordinate assignment &1 is outside higher-level assignment &2 | The short text describes the object sufficiently | ||
| 291 | Date rule is outside time frame for assignment &1 | The short text describes the object sufficiently | ||
| 292 | Demand &1 does not permit abstract assignments | The short text describes the object sufficiently | ||
| 293 | Abstract assignment &1 has duration 0 | The short text describes the object sufficiently | ||
| 294 | Time frame of abstract assignment is shorter than duration | The short text describes the object sufficiently | ||
| 295 | &1 is not a valid organizational unit | The short text describes the object sufficiently | ||
| 296 | You cannot create abstract assignments for tool demands | The short text describes the object sufficiently | ||
| 297 | Subordinate assignment &1 is not within its higher-level assignment &2 | The short text describes the object sufficiently | ||
| 298 | Subordinate assignment &1 overlaps subordinate assignment &2 | The short text describes the object sufficiently | ||
| 299 | Ttl duration of sub. assgmnts is longer than that of higher-level ones | The short text describes the object sufficiently | ||
| 300 | Subordinate assgmnt &1 does not belong to same demand of higher-lvl assgm | The short text describes the object sufficiently | ||
| 301 | Duration &1 &2 is not a multiple of &3 minutes | Space: object requires documentation | ||
| 302 | Time &1 does not match the time granularity of &2 minutes | Space: object requires documentation | ||
| 303 | Time stamp &1 does not match the time granularity of &2 minutes | Space: object requires documentation | ||
| 304 | Sub. assgmt &1 does not belong to same resource as higher-level assgmt | The short text describes the object sufficiently | ||
| 305 | Abstract assignment &1 has duration 0 | The short text describes the object sufficiently | ||
| 306 | Manual splitting is not permitted for subordinate assignments | The short text describes the object sufficiently | ||
| 307 | Cutting is not permitted for subordinate assignments | The short text describes the object sufficiently | ||
| 308 | Enter a target resource for reassignment | The short text describes the object sufficiently | ||
| 309 | Cannot assign tool since assignment for demand &1 is capacitive | The short text describes the object sufficiently | ||
| 310 | Cannot cut since it is not possible to attach duration &1 | The short text describes the object sufficiently | ||
| 311 | Duration of split period is less than minimum duration (&1 minutes) | Space: object requires documentation | ||
| 312 | Split period is outside limits of assignment period | Space: object requires documentation | ||
| 313 | Resource &1 is not available for new assignment on &2 at &3 | Space: object requires documentation | ||
| 314 | Cannot create assignment | Space: object requires documentation | ||
| 315 | Split period must not be identical to assignment period | Space: object requires documentation | ||
| 316 | Cannot assign tool to selected demand | The short text describes the object sufficiently | ||
| 317 | Cannot assign tool to a technically completed order | The short text describes the object sufficiently | ||
| 318 | Tool &1 is not relevant to resource planning | Space: object requires documentation | ||
| 319 | Tool &1 does not exist in plant &2 | The short text describes the object sufficiently | ||
| 320 | Tool &1 is not a production resource or tool | The short text describes the object sufficiently | ||
| 321 | Cannot create tool &1 due to deletion indicator | The short text describes the object sufficiently | ||
| 322 | Could not assign tool since no plant was specified | The short text describes the object sufficiently | ||
| 323 | Equipment &1 does not exist or is not valid | The short text describes the object sufficiently | ||
| 324 | Could not assign tool since equipment or plant is missing | The short text describes the object sufficiently | ||
| 325 | Could not assign tool; no material exists in equipment | Space: object requires documentation | ||
| 326 | Resource &1 is not configured in the WFM Core to use Groupware | Space: object requires documentation | ||
| 327 | The task has a duration of zero | Space: object requires documentation | ||
| 328 | Cutting is not permitted for assignment type &1 | The short text describes the object sufficiently | ||
| 329 | Choose an on-call type | Space: object requires documentation | ||
| 330 | Specified on-call type is incorrect | Space: object requires documentation | ||
| 331 | No on-call types maintained for &1 | Space: object requires documentation | ||
| 332 | Cannot save due to alerts | Space: object requires documentation | ||
| 333 | Cannot change time allocations from HR | The short text describes the object sufficiently | ||
| 334 | HR transfer for resource &1 is in process | Space: object requires documentation | ||
| 335 | HR transfer for resource &1 complete | Space: object requires documentation | ||
| 336 | Cannot save since HR transfer for &1 is in process | The short text describes the object sufficiently | ||
| 337 | You are not authorized to plan resource &1 | The short text describes the object sufficiently | ||
| 338 | You are not authorized to plan operation &1 | The short text describes the object sufficiently | ||
| 339 | Assignment exceeds validity period for resource &1 | The short text describes the object sufficiently | ||
| 340 | Cannot determine end time of stretched assignment for resource &1 | Space: object requires documentation | ||
| 341 | Resource is not available for the current timeframe | The short text describes the object sufficiently | ||
| 342 | Resource &1 is currently being processed by user &2 | The short text describes the object sufficiently | ||
| 343 | Work center &1 in plant &2 is overloaded from &3 to &4 | The short text describes the object sufficiently | ||
| 344 | Resource-planning-relevant operation &1 is not copied to MRS | Space: object requires documentation | ||
| 345 | WBS element &1 is locked by user &2 | The short text describes the object sufficiently | ||
| 346 | Project &1 is locked by user &2 | The short text describes the object sufficiently | ||
| 347 | You cannot create a new demand for this network | Space: object requires documentation | ||
| 348 | Team &1 cannot be assigned to demand item &2 | The short text describes the object sufficiently | ||
| 349 | Assignment for demand &1 is carried out by another team resource | The short text describes the object sufficiently | ||
| 350 | You cannot change the work center of a scheduled demand | Space: object requires documentation | ||
| 351 | Creation of change documents is inactive for &1 | The short text describes the object sufficiently | ||
| 352 | Order/network closed; cannot create new demand | The short text describes the object sufficiently | ||
| 353 | No valid items found for order &1 | The short text describes the object sufficiently | ||
| 354 | Work center of demand is not assigned to an organizational unit | The short text describes the object sufficiently | ||
| 355 | No availability information for resource &1 after period &2 exists | Space: object requires documentation | ||
| 356 | End time of optimization is before the start time | Space: object requires documentation | ||
| 357 | Cannot optimize in the past | The short text describes the object sufficiently | ||
| 358 | Assignment description is too long; enter a maximum of 80 characters | The short text describes the object sufficiently | ||
| 359 | Cannot recalculate splits for &1 assignment type | The short text describes the object sufficiently | ||
| 360 | Assignment cannot be changed; split is already confirmed | The short text describes the object sufficiently | ||
| 361 | You can create a time allocation of type &1 only after you save | Space: object requires documentation | ||
| 362 | Time allocation of type &1 cannot be changed or deleted | The short text describes the object sufficiently | ||
| 363 | Resource &1 is locked by another user | The short text describes the object sufficiently | ||
| 364 | Could not create &1 in HCM; check your settings | The short text describes the object sufficiently | ||
| 365 | Availability of resource &1 has been changed | The short text describes the object sufficiently | ||
| 366 | &1&2&3&4 | The short text describes the object sufficiently | ||
| 367 | Enter a daily work schedule | The short text describes the object sufficiently | ||
| 368 | Logical system for HCM is not defined | Space: object requires documentation | ||
| 369 | Mapping of time allocation types to infotype/subtype is not unique | Space: object requires documentation | ||
| 370 | Details for alternative working time are missing | The short text describes the object sufficiently | ||
| 371 | Cannot create alternative working time; enter start and end date/time | The short text describes the object sufficiently | ||
| 372 | Error while creating alternative working time for resource &1 | The short text describes the object sufficiently | ||
| 373 | Alternative working time for resource &1 created successfully | The short text describes the object sufficiently | ||
| 374 | Cannot create alternative working time; enter a subtype | The short text describes the object sufficiently | ||
| 375 | Subtype &1 is not planning-relevant for resource &2 | The short text describes the object sufficiently | ||
| 376 | Cannot create alternative working time; enter a daily work schedule | The short text describes the object sufficiently | ||
| 377 | Daily work schedule &1, variant &2 is not valid for resource &3 | The short text describes the object sufficiently | ||
| 378 | Cannot determine alternative working time; time stamp is empty | The short text describes the object sufficiently | ||
| 379 | Cannot determine alternative working time for resource &1 | The short text describes the object sufficiently | ||
| 380 | Period must be defined as full-day; time is not relevant | The short text describes the object sufficiently | ||
| 381 | Error during HR backward integration | Space: object requires documentation | ||
| 382 | Fatal exception error in HCM (dump) during HR backward integration | The short text describes the object sufficiently | ||
| 383 | Fatal exception error &1 &2 | The short text describes the object sufficiently | ||
| 384 | Alternative working time must be defined as full-day | The short text describes the object sufficiently | ||
| 385 | You can create/delete alternative working times only after you have saved | The short text describes the object sufficiently | ||
| 386 | Time allocation type &1 is not intended for resource &2 | The short text describes the object sufficiently | ||
| 387 | Cannot delete alt. working time; "Can Be Deleted" indicator not selected | The short text describes the object sufficiently | ||
| 388 | Time allocation GUID &1 replaced by GUID &2 | The short text describes the object sufficiently | ||
| 389 | No time allocation found for GUID &1 | The short text describes the object sufficiently | ||
| 390 | Alternative working time for resource &1 deleted successfully | The short text describes the object sufficiently | ||
| 391 | Error while deleting alternative working time for resource &1 | The short text describes the object sufficiently | ||
| 392 | Alternative working time for resource &1 deleted successfully | The short text describes the object sufficiently | ||
| 393 | Enter a work center | The short text describes the object sufficiently | ||
| 394 | Enter the plant for the work center | The short text describes the object sufficiently | ||
| 395 | Duration of the demand is invalid | The short text describes the object sufficiently | ||
| 396 | Start and end dates must be in the planning period between &1 and &2 | The short text describes the object sufficiently | ||
| 397 | Start date &1 is earlier than the start date &2 of the planning period | The short text describes the object sufficiently | ||
| 398 | End date &1 is later than the end date of the planning period, &2 | The short text describes the object sufficiently | ||
| 399 | Work of the demand is invalid | The short text describes the object sufficiently | ||
| 400 | Number of resources must not be zero | The short text describes the object sufficiently | ||
| 401 | Totals bar: time overlap during assignment &2 for resource &1 | Space: object requires documentation | ||
| 402 | Scheduling demand &1 did not result in scheduling changes | The short text describes the object sufficiently | ||
| 403 | Planning node &1 already exists in the planning board | The short text describes the object sufficiently | ||
| 404 | Planning node &1 is not assigned to an organizational unit; cannot load | The short text describes the object sufficiently | ||
| 405 | Order type cannot be initial | The short text describes the object sufficiently | ||
| 406 | Abstract status &1 is not assigned to a concrete status | The short text describes the object sufficiently | ||
| 407 | Resource data inconsistent; cannot process the data | The short text describes the object sufficiently | ||
| 408 | Vehicle already exists on the planning board | The short text describes the object sufficiently | ||
| 409 | Start date &1, end date &2 must be in the planning period &3 - &4 | The short text describes the object sufficiently | ||
| 410 | & & & & | The short text describes the object sufficiently | ||
| 411 | Backward integration of the demand is deactivated; cannot split | The short text describes the object sufficiently | ||
| 412 | Updating demand data for order &1 from &2 | Space: object requires documentation | ||
| 413 | Additional customer attribute for the team is invalid | The short text describes the object sufficiently | ||
| 414 | Only one additional customer attribute is supported | The short text describes the object sufficiently | ||
| 415 | Additional customer attribute is supported only for the team | The short text describes the object sufficiently | ||
| 416 | Enter data for the field name for the additional customer attribute | The short text describes the object sufficiently | ||
| 417 | Assignment &1 does not permit concrete or stretched planning | The short text describes the object sufficiently | ||
| 418 | User not recognized; set &1 as the active user | Space: object requires documentation | ||
| 419 | Selected status for demand type &1 is not permitted | The short text describes the object sufficiently | ||
| 420 | Demand split for &1 orders is not permitted | The short text describes the object sufficiently | ||
| 421 | Resource &1 already belongs to the team | The short text describes the object sufficiently | ||
| 422 | Start date &1 is earlier than start date &2 of team for resource &3 &4 | The short text describes the object sufficiently | ||
| 423 | End date &1 is later than the end date &2 of the team for resource &3 &4 | The short text describes the object sufficiently | ||
| 424 | Start and end date must be in the period btw &1 and &2 for resource &3 &4 | The short text describes the object sufficiently | ||
| 425 | No team manager is assigned to the team between &1 and &2 | The short text describes the object sufficiently | ||
| 426 | Resource &1 &2 must be within team validity between &3 and &4 | The short text describes the object sufficiently | ||
| 427 | Start time is after the end time for resource &1 | The short text describes the object sufficiently | ||
| 428 | Enter valid times for resource &1 &2 | The short text describes the object sufficiently | ||
| 429 | Start date &1 of resource &2 is before start date &3 of PLB horizon | The short text describes the object sufficiently | ||
| 430 | End date &1 of resource &2 is after end date &3 of PLB horizon | The short text describes the object sufficiently | ||
| 431 | There is more than one team manager in a given period | The short text describes the object sufficiently | ||
| 432 | Resource &1 already exists in the team in the period specified | The short text describes the object sufficiently | ||
| 433 | No team manager exists between &1 and &2 in the team validity specified | The short text describes the object sufficiently | ||
| 434 | Start date is after end date for team &3 | The short text describes the object sufficiently | ||
| 435 | Enter valid start and end times for team &1 | The short text describes the object sufficiently | ||
| 436 | Tool &1 and demand &1 originate from different systems | The short text describes the object sufficiently | ||
| 437 | &1: class does not exist | The short text describes the object sufficiently | ||
| 438 | Start and end date is falling in the past | The short text describes the object sufficiently | ||
| 439 | Order operation is already assigned to resource &1 on &2 at &3 | The short text describes the object sufficiently | ||
| 440 | Breaks cannot be moved beyond the permitted intervals &1 - &2 | The short text describes the object sufficiently | ||
| 441 | Stretched assignm. &1 could not be changed; beyond planning horizon | Space: object requires documentation | ||
| 442 | Cannot create additional assignment; demand already has &1 assignments | Space: object requires documentation | ||
| 443 | Demand time frame was chosen for employee search | Space: object requires documentation | ||
| 444 | Specify the language | The short text describes the object sufficiently | ||
| 445 | Backward integration of the demand duration is deactivated; cannot split | The short text describes the object sufficiently | ||
| 446 | &1 is not a valid status | Space: object requires documentation | ||
| 447 | Planning period was recalculated from demand dates | The short text describes the object sufficiently | ||
| 448 | Demand &1 is of a type for which printing is not supported | Space: object requires documentation | ||
| 449 | Save your changes before displaying or printing documents | Space: object requires documentation | ||
| 450 | Assignment cut is not allowed; "Assignment Follows Demand" is active | The short text describes the object sufficiently | ||
| 451 | Collisions between planning board elements detected | Space: object requires documentation | ||
| 452 | &1: Collision between two travel times is not permitted | The short text describes the object sufficiently | ||
| 453 | Limited number of proposals; no. of working days exceeds planning horizon | Space: object requires documentation | ||
| 454 | Assignment &1 not created; conflicts during assignment follows demand | The short text describes the object sufficiently | ||
| 455 | Assignment &1 deleted; conflicts during assignment follows demand | Space: object requires documentation | ||
| 456 | Assignment split is not allowed; assignment follows demand is active | The short text describes the object sufficiently | ||
| 457 | End date &1 of team &2 is after end date &3 of PLB horizon | The short text describes the object sufficiently | ||
| 458 | Assignment is following demand dates | The short text describes the object sufficiently | ||
| 459 | Space: object requires documentation | |||
| 460 | An entry already exists with priority &1 | The short text describes the object sufficiently | ||
| 461 | Assignment &1 has a longer duration than normal working time &2 H | The short text describes the object sufficiently | ||
| 462 | Cannot create assignment; demand is not relevant for resource planning | The short text describes the object sufficiently | ||
| 463 | Assignment &1 not created; conflicts during assignment follows demand | The short text describes the object sufficiently | ||
| 464 | Assignment &1 deleted; conflicts during assignment follows demand | The short text describes the object sufficiently | ||
| 465 | Assignment split is not allowed; assignment follows demand is active | The short text describes the object sufficiently | ||
| 466 | Assignment is created/updated based on demand dates; assign. follows dem. | The short text describes the object sufficiently | ||
| 467 | Not all single demands in the complex demand &1 could be shifted | Space: object requires documentation | ||
| 468 | Demand &1 has relationships that cannot be handled | Space: object requires documentation | ||
| 469 | Assignment precedes validity period for resource &1 | The short text describes the object sufficiently | ||
| 470 | Original start and end dates of demand &1 are not within planning period | Space: object requires documentation | ||
| 471 | Resource &1 is not valid from &2 to &3 | The short text describes the object sufficiently | ||
| 472 | Maintain the correct time unit for day-based planning in Customizing | The short text describes the object sufficiently | ||
| 473 | Qualification matching was not performed for &1; see long text | Space: object requires documentation | ||
| 474 | A mixture of HR resources and teams are selected for matching | The short text describes the object sufficiently | ||
| 475 | Enter both order type and time zone indicator | The short text describes the object sufficiently | ||
| 476 | An entry with the same key already exists | The short text describes the object sufficiently | ||
| 477 | The role type specified does not belong to an abstract role type | The short text describes the object sufficiently | ||
| 478 | Enter valid order type | The short text describes the object sufficiently | ||
| 479 | No resource/team valid for qualification matching | The short text describes the object sufficiently | ||
| 480 | Could not create assignment for tool resource | Space: object requires documentation | ||
| 481 | Selected status &1 is not valid for demand | The short text describes the object sufficiently | ||
| 482 | Tool demand was created | The short text describes the object sufficiently | ||
| 483 | &1: No free slot found for the order | The short text describes the object sufficiently | ||
| 484 | &1: No resource found within utilization threshold | The short text describes the object sufficiently | ||
| 485 | &1: Assignment already exists for demand; auto. assignment not created | The short text describes the object sufficiently | ||
| 486 | &: Constraint check: Relationship to existing assignments; no date found | The short text describes the object sufficiently | ||
| 487 | Single demands with multiple FS relationships exist in selected demand &1 | Space: object requires documentation | ||
| 488 | &1: No resource found with free availability | The short text describes the object sufficiently | ||
| 489 | &1: No resource found with sufficient qualifications | The short text describes the object sufficiently | ||
| 490 | No valid team members found for qualification matching | The short text describes the object sufficiently | ||
| 491 | HR time allocations cannot be created for multiple resources | The short text describes the object sufficiently | ||
| 492 | Duplicate time record entered for &1 , demand &2 at &3 &4 | The short text describes the object sufficiently | ||
| 493 | Planning horizon lies in the past; no slots can be found | The short text describes the object sufficiently | ||
| 494 | Assignments cannot be aligned; see long text | Space: object requires documentation | ||
| 495 | Assignment is completed; changes are no longer possible | The short text describes the object sufficiently | ||
| 496 | Assignment cannot be moved from N.N. resource to another resource type | The short text describes the object sufficiently | ||
| 497 | Assignment cannot be moved to N.N. resources | The short text describes the object sufficiently | ||
| 498 | The short text describes the object sufficiently | |||
| 499 | Entry & does not exists as abstract status or mobile status | The short text describes the object sufficiently | ||
| 500 | Assignment &1 overlaps with the arrival of assignment &2 from &3 to &4 | The short text describes the object sufficiently | ||
| 501 | Assignment &1 overlaps with the departure of assignment &2 from &3 to &4 | The short text describes the object sufficiently | ||
| 502 | Travel time from &1 to &2 overlaps with absence of resource &3 | The short text describes the object sufficiently | ||
| 503 | Travel times &1 &2 and &3 &4 overlap | The short text describes the object sufficiently | ||
| 504 | Order &1 has been changed; see long text | Space: object requires documentation | ||
| 505 | Order &1 has since been deleted | The short text describes the object sufficiently | ||
| 506 | No suitable time slot found for an assignment | The short text describes the object sufficiently | ||
| 507 | Availability for team is not found for stretched assignment | The short text describes the object sufficiently | ||
| 508 | Travel to distance for assignment &1 exceeds configured value of &2 &3 | Space: object requires documentation | ||
| 509 | Travel from distance for assignment &1 exceeds configured value of &2 &3 | The short text describes the object sufficiently | ||
| 510 | Planned status logic for order type & item type & not provided | The short text describes the object sufficiently | ||
| 511 | Demand type cannot be blank | The short text describes the object sufficiently | ||
| 512 | Bundle &1 was created | The short text describes the object sufficiently | ||
| 513 | Bundle &1 was updated | The short text describes the object sufficiently | ||
| 514 | Bundle &1 was deleted | The short text describes the object sufficiently | ||
| 515 | Cut is not possible; cannot determine utilization (availability) | The short text describes the object sufficiently | ||
| 516 | Demand & is bundled; scheduling cannot be done | The short text describes the object sufficiently | ||
| 517 | Demand &1/&2 duration does not fit in the bundle period | Space: object requires documentation | ||
| 518 | Demand &1/&2 has a different main object | The short text describes the object sufficiently | ||
| 519 | Demand &1/&2 has a different customer | The short text describes the object sufficiently | ||
| 520 | Demand with GUID &1 does not exist; check with your system administrator | The short text describes the object sufficiently | ||
| 521 | Bundle does not exist for the demand | The short text describes the object sufficiently | ||
| 522 | No Service Area found for the demand &1 | Space: object requires documentation | ||
| 523 | Demand &1/&2 belongs to bundling group &3 | Space: object requires documentation | ||
| 524 | Demand &1/&2 has operation user status &3 which is set for exclusion | Space: object requires documentation | ||
| 525 | Assignments cannot be aligned; assignment simulation failed | The short text describes the object sufficiently | ||
| 526 | Assignments cannot be aligned; splits are not allowed for alignment | The short text describes the object sufficiently | ||
| 527 | Assignments cannot be aligned; parallel assignments exist | The short text describes the object sufficiently | ||
| 528 | Specify a maximum allowed time gap to activate alignment | The short text describes the object sufficiently | ||
| 529 | Assignments cannot be aligned; assignment lies in non-availability | The short text describes the object sufficiently | ||
| 530 | Assignments cannot be aligned; assignment lies outside demand dates | The short text describes the object sufficiently | ||
| 531 | Interval ID &1 does not lie on the same level of interval ID &2 | The short text describes the object sufficiently | ||
| 532 | Time frame of interval ID &1 lies outside the range of parent ID &2 | The short text describes the object sufficiently | ||
| 533 | Time frame of interval ID &1 overlaps with interval ID &2 | The short text describes the object sufficiently | ||
| 534 | Demand &1/&2 has a different error-causing object | The short text describes the object sufficiently | ||
| 535 | Demand &1/&2 has different main or error-causing object | The short text describes the object sufficiently | ||
| 536 | Demand &1/&2; planning node &3 has no working time in capacity settings | Space: object requires documentation | ||
| 537 | Enter an interval ID | The short text describes the object sufficiently | ||
| 538 | Enter a qualification category | The short text describes the object sufficiently | ||
| 539 | Parent Interval ID: &1 is not defined | The short text describes the object sufficiently | ||
| 540 | The short text describes the object sufficiently | |||
| 541 | Demand &1 was not shifted; work center capacity is not exceeded | Space: object requires documentation | ||
| 542 | Slots could not be found for demand &1; not enough capacity left | Space: object requires documentation | ||
| 543 | Demand &1/&2 has a different number of resources | The short text describes the object sufficiently | ||
| 544 | Demand is not relevant for planning | The short text describes the object sufficiently | ||
| 545 | Resource &1 cannot be dragged, see long text | Space: object requires documentation | ||
| 546 | Resource &1 cannot be dragged, see long text | Space: object requires documentation | ||
| 547 | Resource &1 cannot be dragged, see long text | Space: object requires documentation | ||
| 548 | Order &1 is locked | The short text describes the object sufficiently | ||
| 549 | The short text describes the object sufficiently | |||
| 550 | Bundle priority &1 is lower than the highest demand priority &2 | The short text describes the object sufficiently | ||
| 551 | Total demand duration does not fit into the bundling period | The short text describes the object sufficiently | ||
| 552 | Bundle start date and time is less than end date and time | The short text describes the object sufficiently | ||
| 553 | Demand &1/&2 cannot be bundled in &3; demand already belongs to bundle &4 | The short text describes the object sufficiently | ||
| 554 | Bundle ID cannot be generated; number range has not been defined | Space: object requires documentation | ||
| 555 | Bundle GUID error; contact your system administrator | The short text describes the object sufficiently | ||
| 556 | Demand &1/&2; no overlapping period found | The short text describes the object sufficiently | ||
| 557 | Demand &1 belongs to bundle &2; &3 cannot be changed/added | The short text describes the object sufficiently | ||
| 558 | Demand &1 is deleted from bundle &2; &3 was changed/added | The short text describes the object sufficiently | ||
| 559 | The short text describes the object sufficiently | |||
| 560 | Enter a bundle start date and time | The short text describes the object sufficiently | ||
| 561 | Enter a bundle end date and time | The short text describes the object sufficiently | ||
| 562 | Bundle cannot exist without any demand | The short text describes the object sufficiently | ||
| 563 | Demand &1/&2; planning node &3 has no start time in capacity settings | Space: object requires documentation | ||
| 564 | Single demands and complex demands cannot be shifted together | Space: object requires documentation | ||
| 565 | Selected demand &1 is not relevant for this action | Space: object requires documentation | ||
| 566 | Selected demand has no work center | Space: object requires documentation | ||
| 567 | Demand &1/&2; planning node &3 has no end time in capacity settings | Space: object requires documentation | ||
| 568 | You cannot change the demand dates according to Customizing settings | Space: object requires documentation | ||
| 569 | Assignment creation failed for the order; see long text for details | Space: object requires documentation | ||
| 570 | You cannot create a new demand in the planning board; see long text | Space: object requires documentation | ||
| 571 | Demand split is not allowed according to Customizing settings | Space: object requires documentation | ||
| 572 | The short text describes the object sufficiently | |||
| 573 | The short text describes the object sufficiently | |||
| 574 | Demand split is not allowed; demand is part of a bundle | The short text describes the object sufficiently | ||
| 575 | Demand &1/&2 has a different work center | The short text describes the object sufficiently | ||
| 576 | Demand &1/&2 does not belong to the same bundling group as other demands | The short text describes the object sufficiently | ||
| 577 | Select all bundled demands | The short text describes the object sufficiently | ||
| 578 | Demand &1 could not be added to any bundle | The short text describes the object sufficiently | ||
| 579 | Demand &1 cannot be modified | The short text describes the object sufficiently | ||
| 580 | Demand &1 has assignments | The short text describes the object sufficiently | ||
| 581 | Demand &1 has time rules | The short text describes the object sufficiently | ||
| 582 | Demand &1 cannot be deleted from bundle | The short text describes the object sufficiently | ||
| 583 | Demand &1; order basic start date is blank | The short text describes the object sufficiently | ||
| 584 | Demand &1; order basic end date is blank | The short text describes the object sufficiently | ||
| 585 | Bundle & cannot be modified | The short text describes the object sufficiently | ||
| 586 | Logging profile &1 not found for log activity &2 | Space: object requires documentation | ||
| 587 | Cannot move assignments to the past | The short text describes the object sufficiently | ||
| 588 | Demand not updated with bundled status; abstract status mapping not found | Space: object requires documentation | ||
| 589 | Demand & is already included in the bundle proposal | The short text describes the object sufficiently | ||
| 590 | Demands cannot be added to bundle | The short text describes the object sufficiently | ||
| 591 | Bundle &2 and its demand &1 are not in sync; &3 was modified after saving | The short text describes the object sufficiently | ||
| 592 | Demand &1 belongs to bundle &2; &3 is changed/added | The short text describes the object sufficiently | ||
| 593 | Demands are not locked; manual locking inactive in planning board profile | Space: object requires documentation | ||
| 594 | Bundle &1 cannot be deleted | The short text describes the object sufficiently | ||
| 595 | Check the log for details | The short text describes the object sufficiently | ||
| 596 | Demand &1 was skipped; automatic scheduling is not allowed | Space: object requires documentation | ||
| 597 | Automatic Scheduling of Multiday Assignments was executed; check the log | Space: object requires documentation | ||
| 598 | All demands were filtered; no demands are left for automatic scheduling | Space: object requires documentation | ||
| 599 | All resources were filtered; no resources left for automatic scheduling | Space: object requires documentation | ||
| 600 | All assignments for the selected demands were deleted | The short text describes the object sufficiently | ||
| 601 | All assignments within the selected time frame were deleted | The short text describes the object sufficiently | ||
| 602 | Demand &1: all resources filtered out;no resources left for asg. creation | The short text describes the object sufficiently | ||
| 603 | Demand &1 was skipped; technical object is blocked | The short text describes the object sufficiently | ||
| 604 | No capacity information found for resource &1 | The short text describes the object sufficiently | ||
| 605 | Demand &1 &2: no or not enough slots found for assignment | The short text describes the object sufficiently | ||
| 606 | Demand &1: slots for assignments found for resource &2 | The short text describes the object sufficiently | ||
| 607 | Demand &1: an error occurred during assignment creation | The short text describes the object sufficiently | ||
| 608 | Optimizer was executed for remaining demands | The short text describes the object sufficiently | ||
| 609 | Demand & was skipped; default asg. type is not concrete or stretched | The short text describes the object sufficiently | ||
| 610 | Resource &1 was skipped for demand &1; capacity information is missing | Space: object requires documentation | ||
| 611 | Demand &1 is not locked manually; cannot unlock | Space: object requires documentation | ||
| 612 | Demand &1 is locked by system; cannot unlock manually | Space: object requires documentation | ||
| 613 | Demand &1 is locked by system; manual lock is no longer possible | Space: object requires documentation | ||
| 614 | Some of the demands were skipped; check the log for more details | Space: object requires documentation | ||
| 615 | Some of the resources were skipped; check the log for more details | Space: object requires documentation | ||
| 616 | All selected assignments must belong to the same resource | The short text describes the object sufficiently | ||
| 617 | Select all assignments for demand &1; asg. on &2 (res. &3) not selected | The short text describes the object sufficiently | ||
| 618 | There is no factory calendar assigned to &1 | The short text describes the object sufficiently | ||
| 619 | Error during calculation of assignment shift | The short text describes the object sufficiently | ||
| 620 | Shifting assignment outside the planning period is not possible | The short text describes the object sufficiently | ||
| 621 | Demand &1&2: assignments were created for resource &3 | The short text describes the object sufficiently | ||
| 622 | Error occurred during automatic assignment execution; check the log | Space: object requires documentation | ||
| 623 | Error during assignment creation | The short text describes the object sufficiently | ||
| 624 | Error during assignment deletion | The short text describes the object sufficiently | ||
| 625 | No valid time interval found for resource &1 | The short text describes the object sufficiently | ||
| 626 | Assignment status &1 not permitted | The short text describes the object sufficiently | ||
| 627 | Resource &1 is team manager for team &2 between &3 and &4 | The short text describes the object sufficiently | ||
| 628 | Resource &1 is already a member of team &2 from &3 to &4 | The short text describes the object sufficiently | ||
| 629 | Team &1 does not exist | The short text describes the object sufficiently | ||
| 630 | Technical object &1 of demand &2 is not available for the assignment | The short text describes the object sufficiently | ||
| 631 | Relationship type was changed from &1 to &2 | The short text describes the object sufficiently | ||
| 632 | You have not maintained an offset unit for the relationship | Space: object requires documentation | ||
| 633 | Cannot create a relationship to the same demand; select different demands | The short text describes the object sufficiently | ||
| 634 | Cannot create or modify relationship; contact your system administrator | Space: object requires documentation | ||
| 635 | You cannot create hierarchical and simultaneous relationships | The short text describes the object sufficiently | ||
| 636 | You cannot modify relationships for orders that are already completed | The short text describes the object sufficiently | ||
| 637 | All demands in a relationship must be of the same type | The short text describes the object sufficiently | ||
| 638 | You can only create relationships for PM/CS orders and PS networks | The short text describes the object sufficiently | ||
| 639 | Successor demand is already involved in another relationship | Space: object requires documentation | ||
| 640 | Cannot create relationship in order to avoid cyclic dependency | Space: object requires documentation | ||
| 641 | You cannot delete the only implicit relationship in the demand | Space: object requires documentation | ||
| 642 | You cannot delete the last remaining relationship within a complex demand | The short text describes the object sufficiently | ||
| 643 | Relationship offset was updated | The short text describes the object sufficiently | ||
| 644 | No changes were made to the existing relationship | The short text describes the object sufficiently | ||
| 645 | Relationship was deleted | The short text describes the object sufficiently | ||
| 646 | Relationships were deleted | The short text describes the object sufficiently | ||
| 647 | Assignment note is currently locked by user &1 | The short text describes the object sufficiently | ||
| 648 | Resource note is currently locked by user &1 | The short text describes the object sufficiently | ||
| 649 | Class &1 does not support interface /MRSS/IF_SGE_WL_ATT | Space: object requires documentation | ||
| 650 | Class &1 does not support interface /MRSS/IF_SGE_CHECK | Space: object requires documentation | ||
| 651 | &1 is not a unit of speed | The short text describes the object sufficiently | ||
| 652 | &1 is not a unit of time | The short text describes the object sufficiently | ||
| 653 | Default pre-booking status is not set for demand type &1 | The short text describes the object sufficiently | ||
| 654 | Automatic assignment creation is deactivated for demand &1 | The short text describes the object sufficiently | ||
| 655 | Automatic assignment creation failed for demand &1 | The short text describes the object sufficiently | ||
| 656 | Self-planning failed for demand &1 | The short text describes the object sufficiently | ||
| 657 | Resource &1 cannot be included for automatic planning of demand &2 | The short text describes the object sufficiently | ||
| 658 | Automatic assignment creation failed because demand is already planned | The short text describes the object sufficiently | ||
| 659 | Auto. assgmnt creation for demand &1 failed; partner is not available | The short text describes the object sufficiently | ||
| 660 | Auto. assgmnt creation for demand &1 failed; no suitable resource found | The short text describes the object sufficiently | ||
| 661 | Auto. assgmnt creation for demand &1 not executed due to Customizing | The short text describes the object sufficiently | ||
| 662 | No requirements profile is assigned to demand &1 | The short text describes the object sufficiently | ||
| 663 | No partners exist for the demand | The short text describes the object sufficiently | ||
| 664 | No qualified resources found | The short text describes the object sufficiently | ||
| 665 | No resources found for resource planning node | The short text describes the object sufficiently | ||
| 666 | Enter explicit resource planning nodes | The short text describes the object sufficiently | ||
| 667 | Enter an ID for the preselection | The short text describes the object sufficiently | ||
| 668 | Automatic scheduling failed; order/network not completely loaded | The short text describes the object sufficiently | ||
| 669 | Automatic resource creation for demand &1 failed; see long text | Space: object requires documentation | ||
| 670 | Automatic resource creation for demand &1 failed; see long text | Space: object requires documentation | ||
| 671 | Automatic resource creation for demand &1 failed; see long text | Space: object requires documentation | ||
| 672 | Automatic resource creation for demand &1 failed; see long text | Space: object requires documentation | ||
| 673 | Automatic resource creation for demand &1 failed; see long text | Space: object requires documentation | ||
| 674 | Demand &1 was not automatically planned | The short text describes the object sufficiently | ||
| 675 | Demands in the bundle do not have the same default assignment type | The short text describes the object sufficiently | ||
| 676 | Demands in the bundle do not have the same setting for daily travel | The short text describes the object sufficiently | ||
| 677 | Demands in the bundle do not have the same settings for daily processing | The short text describes the object sufficiently | ||
| 678 | No resource found within maximum distance of service area &1 | The short text describes the object sufficiently | ||
| 679 | During the requested interval, no resource works in the service area &1 | The short text describes the object sufficiently | ||
| 680 | No resource found for the service area &1 | The short text describes the object sufficiently | ||
| 681 | No resource has the required qualifications | The short text describes the object sufficiently | ||
| 682 | No resource found for interval group &1 between &2 | The short text describes the object sufficiently | ||
| 683 | Earliest appointment date for spare parts is later than requested date | Space: object requires documentation | ||
| 684 | Resource &1 is not available in MRS | The short text describes the object sufficiently | ||
| 685 | The given resource is not working in any service area | The short text describes the object sufficiently | ||
| 686 | No technical object exists for GUID &1 | The short text describes the object sufficiently | ||
| 687 | &1 is not a valid attribute | The short text describes the object sufficiently | ||
| 688 | &1 is not a valid function | The short text describes the object sufficiently | ||
| 689 | &1 is not a valid application | The short text describes the object sufficiently | ||
| 690 | No valid log data found to be displayed | The short text describes the object sufficiently | ||
| 691 | No valid log data found to be deleted | The short text describes the object sufficiently | ||
| 692 | You are not authorized to display or delete the logged data | The short text describes the object sufficiently | ||
| 693 | Data was deleted from the log table | The short text describes the object sufficiently | ||
| 694 | Demand &1 can have only one status as default pre-booking status | The short text describes the object sufficiently | ||
| 695 | Plannning node for work center &1, plant &2 was transferred | The short text describes the object sufficiently | ||
| 696 | Asynchronous queue was started for planning node capacity calculation | The short text describes the object sufficiently | ||
| 697 | Plannning node for org. unit &1 was transferred | The short text describes the object sufficiently | ||
| 698 | No org. unit details found for org. unit &1 | The short text describes the object sufficiently | ||
| 699 | No work center details found; no work center is linked to org. unit &1 | The short text describes the object sufficiently | ||
| 700 | No valid org. unit found for &1 in this system; see longtext | Space: object requires documentation | ||
| 701 | You are using a multi back-end landscape; enter the logical system | The short text describes the object sufficiently | ||
| 702 | No start information available for resource &1 and demand &2 | Space: object requires documentation | ||
| 703 | Change from time info. &1 to &2 is not permitted (resource &3, demand &4) | Space: object requires documentation | ||
| 704 | Time data exists for resource &1 and demand &2 after the time stamp &3 | Space: object requires documentation | ||
| 705 | Assignment type &1 is not permitted | Space: object requires documentation | ||
| 706 | Site supervisor indicator must be changed to assignments btw &1 and &2 | The short text describes the object sufficiently | ||
| 707 | Site Supervisor cannot be set, it is set in another Asgn.of the Operation | The short text describes the object sufficiently | ||
| 708 | Status &1 does not exist or is not permitted for resource category &2 &3 | The short text describes the object sufficiently | ||
| 709 | Choose a valid resource | The short text describes the object sufficiently | ||
| 710 | Function code &1 for type &2 does not exist | The short text describes the object sufficiently | ||
| 711 | No valid slot found for time data addition | The short text describes the object sufficiently | ||
| 712 | No valid time data found to be deleted | The short text describes the object sufficiently | ||
| 713 | Start time of preparation is later than end time of preparation (&1) | The short text describes the object sufficiently | ||
| 714 | Wrap-up phase cannot overlap with the assignment (&1) | The short text describes the object sufficiently | ||
| 715 | Start time of wrap-up is later than end time of wrap-up (&1) | The short text describes the object sufficiently | ||
| 716 | Arrival time cannot overlap with the preparation phase | The short text describes the object sufficiently | ||
| 717 | Status of language &1 retained | The short text describes the object sufficiently | ||
| 718 | Preparation phase cannot overlap with the assignment (&1) | The short text describes the object sufficiently | ||
| 719 | Preparation end is overlapping with assignment & | The short text describes the object sufficiently | ||
| 720 | Travel time is colliding with preparation for & | The short text describes the object sufficiently | ||
| 721 | Set default status indicator for demand type &1 | The short text describes the object sufficiently | ||
| 722 | Demand split is not allowed for RM demands | The short text describes the object sufficiently | ||
| 723 | Select an appointment interval group | The short text describes the object sufficiently | ||
| 724 | Select a search strategy | The short text describes the object sufficiently | ||
| 725 | Application was not initialized; contact your system administrator | The short text describes the object sufficiently | ||
| 726 | Could not find demands | The short text describes the object sufficiently | ||
| 727 | Bundles were not saved; contact your system administrator | The short text describes the object sufficiently | ||
| 728 | Bundles were saved | The short text describes the object sufficiently | ||
| 729 | Technical object &1 (&2 &3) is blocked due to &4 in assignment time frame | The short text describes the object sufficiently | ||
| 730 | Functional location &1 is blocked due to &2 in assignment time frame | The short text describes the object sufficiently | ||
| 731 | Technical object &1 (&2 &3) is blocked due to &4 in assignment time frame | The short text describes the object sufficiently | ||
| 732 | Technical object &1 (&2 &3) is blocked in assignment time frame (Date &4) | The short text describes the object sufficiently | ||
| 733 | No free demands found for bundling | The short text describes the object sufficiently | ||
| 734 | Technical object &1 is blocked in the assignment time frame &2 | The short text describes the object sufficiently | ||
| 735 | Transaction is intended for internal use only | The short text describes the object sufficiently | ||
| 736 | Cannot execute queue &1 due to a system error | Space: object requires documentation | ||
| 737 | Demand &1 excluded from bundling | The short text describes the object sufficiently | ||
| 738 | Assignments for demand &1 are independent of MRS time rule | The short text describes the object sufficiently | ||
| 739 | Update termination: STATUS | The short text describes the object sufficiently | ||
| 740 | Update termination: MAP | The short text describes the object sufficiently | ||
| 741 | Time allocation data has been changed | The short text describes the object sufficiently | ||
| 742 | Resource &1 is overloaded from &2 to &3 at Day level | The short text describes the object sufficiently | ||
| 743 | Could not find suitable time frame for assignment | The short text describes the object sufficiently | ||
| 744 | Assignment split is not possible for assignment &1 | Space: object requires documentation | ||
| 745 | Links are not allowed for external resources | The short text describes the object sufficiently | ||
| 746 | Teams allocations are not allowed for external resources | The short text describes the object sufficiently | ||
| 747 | No capacity slots found for the resource | The short text describes the object sufficiently | ||
| 748 | Resource is in frozen period; cannot plan between &1 and &2 | The short text describes the object sufficiently | ||
| 749 | No assignment or more than one assignment exist | The short text describes the object sufficiently | ||
| 750 | Capacitive assignment overlaps with absence between &1 and &2 | Space: object requires documentation | ||
| 751 | Cannot execute cap. assignment &1; resource is not sufficiently available | Space: object requires documentation | ||
| 752 | Assignment for demand &1 is scheduled to finish on &2 | Space: object requires documentation | ||
| 753 | Assignment for demand &1 is scheduled to start on &2 | Space: object requires documentation | ||
| 754 | Capacitive assignment for demand &1 exceeds planned end date | Space: object requires documentation | ||
| 755 | Assignments for demand &1 of &2 to &3 not created | Space: object requires documentation | ||
| 756 | Demand &1 for the same customer is assigned to resource &2 | Space: object requires documentation | ||
| 757 | Site supervisor indicator not set in any demand for order &1 | Space: object requires documentation | ||
| 758 | Site supervisor indicator set in several demands for order &1 | Space: object requires documentation | ||
| 759 | Demand &1 should start no later than &2 according to SLA | Space: object requires documentation | ||
| 760 | Resource is not valid | The short text describes the object sufficiently | ||
| 761 | For operation &1 (Order Operation Level), no supervisor is set | The short text describes the object sufficiently | ||
| 762 | For Order operation &1 (Order Operation Level), no supervisor is set | The short text describes the object sufficiently | ||
| 763 | For &, there are other Teams for the same period | The short text describes the object sufficiently | ||
| 764 | Note management is inactive for object & of type & | The short text describes the object sufficiently | ||
| 765 | No Valid members found for the team &, during the Period & to & | The short text describes the object sufficiently | ||
| 766 | Automatic assignment split could not be performed | Space: object requires documentation | ||
| 767 | Test message for related assignments | The short text describes the object sufficiently |
History
| Last changed on/by | 20141109 | SAP | |
| SAP Release Created in | 401 |