SAP ABAP Message Class /MRSS/SGE Message Number 086 (For capacitive assignments, duration must be less than the time frame)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Attribute
Message class | ![]() |
/MRSS/SGE | |
Short Description | ![]() |
Messages for the Scheduling Engine | |
Message Number | ![]() |
086 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20141109 |
Message Text
For capacitive assignments, duration must be less than the time frame
Help Document
Diagnosis
The timeframe of the assignment, which is defined by the start and end dates, is larger than or equal to the execution duration that you specified. For capacitive assignments, the duration must be less than the assignment timeframe defined by the start and end dates.
System Response
Procedure
Change the assignment type to "concrete assignment," or change the duration or timeframe for the assignment.
History
Last changed on/by | ![]() |
20141109 | SAP |
SAP Release Created in | 401 |