SAP ABAP Message Class /MRSS/SGE Message Number 105 (Tool &1 is not scheduled with assignment &2)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class /MRSS/SGE  
Short Description Messages for the Scheduling Engine    
Message Number 105  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
Tool &1 is not scheduled with assignment &2
Help Document

Diagnosis

The assignment for tool is not scheduled for the same times as service assignment .

The assignment for the tool must overlap the times for the service assignments. The relevant tool must be scheduled for the entire period of a service order.

System Response

Procedure

To remove the cause of the alert, schedule the tool assignment for the time of the related service assignments.

Procedure for System Administration

History
Last changed on/by 20141109  SAP 
SAP Release Created in   401