SAP ABAP Message Class /MRSS/SGE Message Number 261 (Duration of res. &1 availability longer than that of stretched assgmnt &2)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class /MRSS/SGE  
Short Description Messages for the Scheduling Engine    
Message Number 261  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
Duration of res. &1 availability longer than that of stretched assgmnt &2
Help Document

Diagnosis

The availability of the resource has since changed and now extends beyond the period of the stretched assignment. This may be the result of an intermediate transfer of availability data from the HR system.

System Response

Procedure

Check the availability of the resource and the stretched assignment.

Procedure for System Administration

History
Last changed on/by 20141109  SAP 
SAP Release Created in   401