SAP ABAP Message Class /MRSS/SGE Message Number 355 (End time of optimization is before the start time)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Attribute
Message class | ![]() |
/MRSS/SGE | |
Short Description | ![]() |
Messages for the Scheduling Engine | |
Message Number | ![]() |
355 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20141109 |
Message Text
End time of optimization is before the start time
Help Document
Diagnosis
You have entered a value for the lead time that causes the start date/time to be after the end date/time.
System Response
The system cannot carry out the activity.
Procedure
Change the lead time or the end date/time.
Procedure for System Administration
History
Last changed on/by | ![]() |
20141109 | SAP |
SAP Release Created in | 401 |