SAP ABAP Message Class /MRSS/SGE Message Number 971 (Automatic assignment split could not be performed)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class /MRSS/SGE  
Short Description Messages for the Scheduling Engine    
Message Number 971  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
Automatic assignment split could not be performed
Help Document

Diagnosis

The assignment could not be split since the maximum allowed gap between the resulting assignments is exceeded.

System Response

Procedure

Contact your system administrator.

Procedure for System Administration

Check the settings made in Customizing under Set Up Scheduler Workplace --> Workplace Profiles --> Define Planning Board Profile.

History
Last changed on/by 20141109  SAP 
SAP Release Created in   401