SAP ABAP Message Class /MRSS/SGE Message Number 440 (Stretched assignm. &1 could not be changed; beyond planning horizon)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class /MRSS/SGE  
Short Description Messages for the Scheduling Engine    
Message Number 440  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
Stretched assignm. &1 could not be changed; beyond planning horizon
Help Document

Diagnosis

You want to move a time specification to beyond the planning horizon. A parallel stretched assignment would have to be adjusted to it, but this is not possible beyond the horizon.

System Response

The stretched assignment was not adjusted. The time specification was moved.

Procedure

If you want to adjust the parallel stretched assignment, extend the planning horizon and check the assignment there.

Procedure for System Administration

History
Last changed on/by 20141109  SAP 
SAP Release Created in   401