SAP ABAP Message Class /MRSS/SGE Message Number 493 (Assignments cannot be aligned; see long text)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class /MRSS/SGE  
Short Description Messages for the Scheduling Engine    
Message Number 493  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
Assignments cannot be aligned; see long text
Help Document

Diagnosis

The assignments cannot be aligned because there is no availability in the selected planning horizon.

System Response

Procedure

Increase the planning horizon period to align the assignments automatically.

Procedure for System Administration

History
Last changed on/by 20141109  SAP 
SAP Release Created in   401