SAP ABAP Message Class /MRSS/SGE Message Number 493 (Assignments cannot be aligned; see long text)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Attribute
Message class | ![]() |
/MRSS/SGE | |
Short Description | ![]() |
Messages for the Scheduling Engine | |
Message Number | ![]() |
493 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20141109 |
Message Text
Assignments cannot be aligned; see long text
Help Document
Diagnosis
The assignments cannot be aligned because there is no availability in the selected planning horizon.
System Response
Procedure
Increase the planning horizon period to align the assignments automatically.
Procedure for System Administration
History
Last changed on/by | ![]() |
20141109 | SAP |
SAP Release Created in | 401 |