SAP ABAP Message Class /MRSS/SGE Message Number 232 (Time frame of capacitive assignment is smaller than duration)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Attribute
Message class | ![]() |
/MRSS/SGE | |
Short Description | ![]() |
Messages for the Scheduling Engine | |
Message Number | ![]() |
232 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20141109 |
Message Text
Time frame of capacitive assignment is smaller than duration
Help Document
Diagnosis
The period between the start and end of the assignment is smaller than the duration.
System Response
The assignment cannot be created.
Procedure
For a capacitive assignment, the duration of the assignment must be shorter than or the same as the period between the start and end of the assignment.
Reduce the duration or change the start or end of the assignment.
History
Last changed on/by | ![]() |
20141109 | SAP |
SAP Release Created in | 401 |