SAP ABAP Message Class /MRSS/SGE Message Number 339 (Cannot determine end time of stretched assignment for resource &1)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Attribute
Message class | ![]() |
/MRSS/SGE | |
Short Description | ![]() |
Messages for the Scheduling Engine | |
Message Number | ![]() |
339 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20141109 |
Message Text
Cannot determine end time of stretched assignment for resource &1
Help Document
Diagnosis
Resource &V1& has no availability. Therefore, the end time of the stretched assignment cannot be determined.
System Response
The creation of the assignment is terminated.
Procedure
You have to create an availability for the resource. You can do this using an exception in the planning board or using the HR transfer report for availabilities.
Procedure for System Administration
History
Last changed on/by | ![]() |
20141109 | SAP |
SAP Release Created in | 401 |