SAP ABAP Message Class /MRSS/SGE Message Number 339 (Cannot determine end time of stretched assignment for resource &1)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class /MRSS/SGE  
Short Description Messages for the Scheduling Engine    
Message Number 339  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
Cannot determine end time of stretched assignment for resource &1
Help Document

Diagnosis

Resource &V1& has no availability. Therefore, the end time of the stretched assignment cannot be determined.

System Response

The creation of the assignment is terminated.

Procedure

You have to create an availability for the resource. You can do this using an exception in the planning board or using the HR transfer report for availabilities.

Procedure for System Administration

History
Last changed on/by 20141109  SAP 
SAP Release Created in   401