SAP ABAP Message Class /MRSS/SGE Message Number 400 (Totals bar: time overlap during assignment &2 for resource &1)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class /MRSS/SGE  
Short Description Messages for the Scheduling Engine    
Message Number 400  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
Totals bar: time overlap during assignment &2 for resource &1
Help Document

Diagnosis

The finish date for the capacitive assignment was exceeded.

System Response

The totals bar for capacitive assignment of resource was created even though the finish data was exceeded.

Procedure

Check assignment and correct the resource planning if necessary.

History
Last changed on/by 20141109  SAP 
SAP Release Created in   401