SAP ABAP Message Class /MRSS/SGE Message Number 005 (No individual object exists for tool &1 (&2))
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class /MRSS/SGE  
Short Description Messages for the Scheduling Engine    
Message Number 005  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
No individual object exists for tool &1 (&2)
Help Document

Diagnosis

Operation for tool is marked as relevant for resource planning. However, the resource planning nodes for which the planning board was designed do not contain any individual objects that can be used as a basis for carrying out planning.

System Response

You cannot create an assignment for operation .

Procedure

Contact technical support.

Procedure for System Administration

Check whether operation is supposed to be marked as relevant for resource planning. If the operation is not supposed to be relevant for resource planning, you can make the appropriate setting using the operation category, which is determined during operation category determination from the item category group and other data.

If the operation is supposed to be relevant for resource planning, check in the master data for the individual object whether an appropriate tool resource exists. Check that this tool resource has tool as the reference product and that it is assigned to the resource planning node in question for the relevant period. Assignments to resource planning nodes are passed down to lower-level resource planning nodes. That is, in the resource planning structure, the tool resource need only be assigned to a resource planning node above one of the resource planning nodes for which the planning board was set up.

History
Last changed on/by 20141109  SAP 
SAP Release Created in   401