SAP ABAP Message Class /MRSS/SGE Message Number 108 (Linked resources &1 and &2 for &3 are scheduled in different orders)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Attribute
Message class | /MRSS/SGE | ||
Short Description | Messages for the Scheduling Engine | ||
Message Number | 108 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20141109 |
Message Text
Linked resources &1 and &2 for &3 are scheduled in different orders
Help Document
Diagnosis
Simultaneous assignments for the linked resources and do not belong together, because the tool demand is not a subitem of the service demand.
System Response
Procedure
We recommend that you assign an assignment to a different personnel resource, or that you do not schedule the assignments for the same time.
Procedure for System Administration
History
Last changed on/by | 20141109 | SAP | |
SAP Release Created in | 401 |