Where Used List (Table) for SAP ABAP Table ONR00 (General Object Number)
SAP ABAP Table
ONR00 (General Object Number) is used by
pages: 1 2
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 | /BEV1/RBVBAK | Sales Document: Header Data | ||||
| 2 | /BEV1/RBVBAP | Sales Document: Item Data | ||||
| 3 | /CBAD/CON_DBS | Advanced Order Processing and Billing: DBS Item Data | ||||
| 4 | /CUM/BAPI_CUNIT_IO | IO fields for compatible units | ||||
| 5 | /ISDFPS/FORCEM | Authorized Materials | ||||
| 6 | /ISDFPS/FORCEP | Material Packages | ||||
| 7 | /ISDFPS/ME_NO_HEADER | DFPS: Notification Header - Mobile | ||||
| 8 | /ISDFPS/ME_WO_AFFH | DFPS: PRT Assignment Plant Order - Mobile (Without .include) | ||||
| 9 | /ISDFPS/NOTIF_HEADER2 | Notification Header DFPS PM Notification | ||||
| 10 | /ISDFPS/NOUPS_HEADER | DFPS: Notification Header - UPS Distribution | ||||
| 11 | /ISDFPS/PM_RELOC_CHECK_QMEL | Transfer of Technical Object: Notifications | ||||
| 12 | /ISDFPS/RIHEQUI_SMALL | Transfer Data for Equipment Hierarchy | ||||
| 13 | /ISDFPS/RIHIFLO_SMALL | Functional Location: Output Structure for ABAP Lists | ||||
| 14 | /SAPSMOSS/RQMQMEL1 | R/3 Notifications (Reporting) | ||||
| 15 | AD01ATTRI1 | Mandatory Parameters of Dynamic Items | ||||
| 16 | AD01OBJ | Communication: Objects to be Billed/Objects for Quotation | ||||
| 17 | AFAB | Network - Relationships | ||||
| 18 | AFAB_INC | Network relationships (Include structure) | ||||
| 19 | AFFH | PRT assignment data for the work order | ||||
| 20 | AFFH01 | Order PRT Data (for LDB) - 01 | ||||
| 21 | AFFH_INC | PRT assignment data for the work order | ||||
| 22 | AFFL | Work order sequence | ||||
| 23 | AFFLD | Order: Dialog table for order sequences (AFFL) | ||||
| 24 | AFFLDGET | AFFLD structure with VBKZ | ||||
| 25 | AFFL_INC | Work order sequence (Include structure) | ||||
| 26 | AFFL_UPDATE_RELEVANT | Fields that are relevant for update from AFFL (sim. vers.) | ||||
| 27 | AFPO | Order item | ||||
| 28 | AFPOB | Document structure for order items | ||||
| 29 | AFVC | Operation within an order | ||||
| 30 | AFVG01 | Structure for transferring processes to log.data base (CNJ) | ||||
| 31 | AFVGD | Order: Dialog table for Table AFVG (order operation) | ||||
| 32 | AFVGDGET | Operation incl. update indicator | ||||
| 33 | AFVGI | General include structure of the operation data | ||||
| 34 | AFWCH_STR_SAMP | Sample Customizing | ||||
| 35 | ALM_ME_NOTIFICATION_LIST | Notification List | ||||
| 36 | ALM_ME_NOTIF_HEADER | Notification Header | ||||
| 37 | ANIA1 | Depr. simulation for invest. projects | ||||
| 38 | ANIB | Investment projects depr. simulation depr. areas | ||||
| 39 | ANIB1 | Investment projects depr. simulation depr. areas | ||||
| 40 | ANLA | Asset Master Record Segment | ||||
| 41 | ANLI | Link table for investment measure -> AuC | ||||
| 42 | AUAA | Settlement Document: Receiver Segment | ||||
| 43 | AUAK | Document Header for Settlement | ||||
| 44 | AUAO | Document Segment: CO Objects to be Settled | ||||
| 45 | AUFK | Order master data | ||||
| 46 | AUFK2 | Order Master Data for WBS (LDB) | ||||
| 47 | AUFK3 | Network master data (LDB) | ||||
| 48 | AVIAK11 | Update structure for VIAK11 (D-tape records) | ||||
| 49 | AVIMI03 | Chnge doc. struct., indiv.generated (VIMI03 -> no chnge doc) | ||||
| 50 | AVIMI33 | Change document structure; individually generated (VIMI33) | ||||
| 51 | BAPI2045D_IL0 | General Data for Inspection Lot | ||||
| 52 | BAPI20783T | BAPI List of Existing Quality Notifications | ||||
| 53 | BAPI2080_NOTHDRE | BAPI Service Notification Header | ||||
| 54 | BAPIFRML_APPLICATION_SCOPE | RMS-FRM: Scope of Application for Formula | ||||
| 55 | BAPIFRML_VALIDITY_AREA | RMS-FRM: Scope of Application for Formula | ||||
| 56 | BAPI_ALM_ORDER_LISTHEAD_RESULT | ALM Orders: Order List from Selection | ||||
| 57 | BAPI_RE_COND_CALC_INT | Conditions: Time-Dependent Calculation Factors - Intern | ||||
| 58 | BAPI_RE_COND_DIST_INT | Conditions: Time-Dependent Distribution Factors - Internal | ||||
| 59 | BGMK | Master Warranty Header | ||||
| 60 | BKHS1 | Header: Unit Costing (Control + Totals) | ||||
| 61 | BKHS2 | Header: Unit Costing (Control + Totals) | ||||
| 62 | BKHS3 | Header: Unit Costing (Control + Totals) | ||||
| 63 | BKHS4 | Header: Unit Costing (Control + Totals) | ||||
| 64 | BPCG | Controlling Object, by Year | ||||
| 65 | BPCJ | Controlling Object, by Year | ||||
| 66 | BPCK | Controlling objects, activated objects | ||||
| 67 | BPDZ | Line Entry Document | ||||
| 68 | BPEG | Line Item Overall Values Controlling Obj. | ||||
| 69 | BPEJ | Line Item Annual Values Controlling Obj. | ||||
| 70 | BPEP | Line Item Period Values Controlling Obj. | ||||
| 71 | BPGE | Totals Record for Total Value Controlling obj. | ||||
| 72 | BPGE1 | Totals Record for Total Value Controlling obj. | ||||
| 73 | BPGE2 | Totals Record for Total Value Controlling obj. | ||||
| 74 | BPGE3 | Totals Record for Total Value Controlling obj. | ||||
| 75 | BPGE4 | Totals Record for Total Value Controlling obj. | ||||
| 76 | BPGE5 | Totals Record for Total Value Controlling obj. | ||||
| 77 | BPGE6 | Totals Record for Total Value Controlling obj. | ||||
| 78 | BPGV | Prel.entry, overall | ||||
| 79 | BPHI | Cross-hierarchy Data Controlling obj. | ||||
| 80 | BPHI1 | Cross-hierarchy Data Controlling obj. | ||||
| 81 | BPIG | Budget Object Index (Overall Budget) | ||||
| 82 | BPIG1 | Budget Object Index (Overall Budget) | ||||
| 83 | BPIJ | Budget Object Index (Annual Budget) | ||||
| 84 | BPIJ1 | Budget Object Index (Annual Budget) | ||||
| 85 | BPJA | Totals Record for Annual Total Controlling Obj. | ||||
| 86 | BPJA1 | Totals Record for Annual Total Controlling Obj. | ||||
| 87 | BPJA2 | Totals Record for Annual Total Controlling Obj. | ||||
| 88 | BPJA3 | Totals Record for Annual Total Controlling Obj. | ||||
| 89 | BPJA4 | Totals Record for Annual Total Controlling Obj. | ||||
| 90 | BPJA5 | Totals Record for Annual Total Controlling Obj. | ||||
| 91 | BPJA6 | Totals Record for Annual Total Controlling Obj. | ||||
| 92 | BPJV | Prel.entry - annual values | ||||
| 93 | BPPE | Totals Record for Period Values Controlling Obj. | ||||
| 94 | BPPE1 | Totals Record for Period Values Controlling Obj. | ||||
| 95 | BPPE2 | Totals Record for Period Values Controlling Obj. | ||||
| 96 | BPPE3 | Totals Record for Period Values Controlling Obj. | ||||
| 97 | BPPE4 | Totals Record for Period Values Controlling Obj. | ||||
| 98 | BPPE5 | Totals Record for Period Values Controlling Obj. | ||||
| 99 | BPPE6 | Totals Record for Period Values Controlling Obj. | ||||
| 100 | BPTR | Object Data Controlling Obj. | ||||
| 101 | BPTR1 | Object Data Controlling Obj. | ||||
| 102 | BPTR2 | Object Data Controlling Obj. | ||||
| 103 | BPTR3 | Object Data Controlling Obj. | ||||
| 104 | BPTR4 | Object Data Controlling Obj. | ||||
| 105 | BPTR5 | Object Data Controlling Obj. | ||||
| 106 | BPTR6 | Object Data Controlling Obj. | ||||
| 107 | BPTX | Budgeting Text | ||||
| 108 | BWOM_IFACT | CO: Interface Structure: Breakdown of Periodic Activity Qtys | ||||
| 109 | CAUFVDQ | Order header structure | ||||
| 110 | CAUFVTAB | Maps Database View CAUFV as Internal Table | ||||
| 111 | CBPRA | Structure of all activity attributes | ||||
| 112 | CBPRF | Business Process Field Selection for Master Data Validation | ||||
| 113 | CCGLS_ARESB | EHS: Reservation/Dependent Requirement - Old | ||||
| 114 | CE7S001 | Gen. flds for transfer of cost center costs to CO-PA | ||||
| 115 | CE7S_AL | Airline Route Profit | ||||
| 116 | CE7S_CP | Template for Consumer Goods Industry | ||||
| 117 | CE7S_GO | Quickstart Template | ||||
| 118 | CEST7 | Gen. flds for assessment of cost center costs to CO-PA | ||||
| 119 | CIMTV | Capital investment line item settlement list structure | ||||
| 120 | CIMZO | Structure of Change Document: Generated by RSSCD000 | ||||
| 121 | CIMZR | Structure of Change Document: Generated by RSSCD000 | ||||
| 122 | CKBOB | KKB: Object Record (Fixed Database Portion) | ||||
| 123 | CKHS | Header: Unit Costing (Control + Totals) | ||||
| 124 | CKHS1 | Header: Unit Costing (Control + Totals) | ||||
| 125 | CKHS2 | Header: Unit Costing (Control + Totals) | ||||
| 126 | CKHS3 | Header: Unit Costing (Control + Totals) | ||||
| 127 | CKHS4 | Header: Unit Costing | ||||
| 128 | CKHS5 | Header: Unit Costing (Control + Totals) | ||||
| 129 | CKHS6 | Header: Unit Costing (Control + Totals) | ||||
| 130 | CKMLLAHD | ML Activity Types: Header Record | ||||
| 131 | CKPH | Master Record: Cost Object ID Number | ||||
| 132 | CKRCO | Anchor Entry of Summarized CO Object (Summarization Object) | ||||
| 133 | CMDTPC_BUKRS | Generic Master Record: Company Code Assign. for Profit Cent. | ||||
| 134 | CMDT_KEY_TOP | Generic Master Record - Key Fields | ||||
| 135 | CMDT_PC_BUKRS | Generic Master Record: Company Code Assign. for Profit Cent. | ||||
| 136 | COACC_CHAR | Attributes of CO Account Assignment Objects in Account Row | ||||
| 137 | COANZ | Index of Objects With Down Payments/Requests | ||||
| 138 | COBRA | Settlement Rule for Order Settlement | ||||
| 139 | COBRA1 | Settlement Rule for Order Settlement | ||||
| 140 | COBRA2 | Settlement Rule for Order Settlement | ||||
| 141 | COBRA3 | Settlement Rule for Order Settlement | ||||
| 142 | COBRA4 | Settlement Rule for Order Settlement | ||||
| 143 | COBRA5 | Settlement Rule for Order Settlement | ||||
| 144 | COBRA6 | Settlement Rule for Order Settlement | ||||
| 145 | COBRB | Distribution Rules Settlement Rule Order Settlement | ||||
| 146 | COBRB1 | Distribution Rules Settlement Rule Order Settlement | ||||
| 147 | COBRB2 | Distribution Rules Settlement Rule Order Settlement | ||||
| 148 | COBRB3 | Distribution Rules Settlement Rule Order Settlement | ||||
| 149 | COBRB4 | Distribution Rules Settlement Rule Order Settlement | ||||
| 150 | COBRB5 | Distribution Rules Settlement Rule Order Settlement | ||||
| 151 | COBRB6 | Distribution Rules Settlement Rule Order Settlement | ||||
| 152 | COCF_S_PM_ORD_LIST | Maintenance orders | ||||
| 153 | COEJ | CO Object: Line Items (by Fiscal Year) | ||||
| 154 | COEJL | CO Object: Line Items for Activity Types (by Fiscal Year) | ||||
| 155 | COEJL_ONLY | Non-key fields, only in COEJL (INCLUDE structure) | ||||
| 156 | COEJR | CO Object: Line Items for Stat. Key Figures (by Fiscal Year) | ||||
| 157 | COEJRA | CO Object: Line Items for Stat. Key Figs (by FYr; All Prds) | ||||
| 158 | COEJR_ONLY | Non-key fields, only in COVJR (INCLUDE structure) | ||||
| 159 | COEJT | CO Object: Line Items for Prices (by Fiscal Year) | ||||
| 160 | COEJT_ONLY | Non-key fields, only in COEJT (INCLUDE structure) | ||||
| 161 | COEJ_ONLY | Non-key fields only in COEJ (INCLUDE structure) | ||||
| 162 | COEP | CO Object: Line Items (by Period) | ||||
| 163 | COEPB | CO Object: Line Items Variance/Period-Based Results Analysis | ||||
| 164 | COEPBR | CO Object: Valuated Line Item Settlement | ||||
| 165 | COEPBR11 | CO Object: Valuated Line Item Settlement | ||||
| 166 | COEPBR12 | CO Object: Valuated Line Item Settlement | ||||
| 167 | COEPB_ONLY | Non-Key Fields That Exist Only in COEPB (INCLUDE Structure) | ||||
| 168 | COEPD | CO Object: Line Item Settlement, Not Valuated, With Status | ||||
| 169 | COEPD11 | CO Object: Line Item Settlement, Not Valuated, With Status | ||||
| 170 | COEPD12 | CO Object: Line Item Settlement, Not Valuated, With Status | ||||
| 171 | COEPL | CO Object: Line Items for Activity Types (by Period) | ||||
| 172 | COEPL_ONLY | Non-key fields, only in COEPL (INCLUDE structure) | ||||
| 173 | COEPR | CO Object: Line Items for Stat. Key Figs (by Period) | ||||
| 174 | COEPR_ONLY | Non-key fields, only in COEPR (INCLUDE structure) | ||||
| 175 | COEPT | CO Object: Line Items for Prices (by Period) | ||||
| 176 | COEPT_ONLY | Non-key fields, only in COEPT (INCLUDE structure) | ||||
| 177 | COEP_ONLY | Non-key fields only in COEP (INCLUDE structure) | ||||
| 178 | COEP_P | CO object: Line items by period, transfer structure | ||||
| 179 | COER | Sales Order Value Revenue | ||||
| 180 | COFP | Document Lines (project cash management) | ||||
| 181 | COFP_ONLY | None key fields occurring only in COFP (INCLUDE structure) | ||||
| 182 | COHS4 | Header: Unit Costing (Control + Totals) | ||||
| 183 | COKA | CO Object: Control Data for Cost Elements | ||||
| 184 | COKA1 | CO Object: Control Data for Cost Elements | ||||
| 185 | COKA2 | CO Object: Control Data for Cost Elements | ||||
| 186 | COKA3 | CO Object: Control Data for Cost Elements | ||||
| 187 | COKA4 | CO Object: Control Data for Cost Elements | ||||
| 188 | COKA5 | CO Object: Control Data for Cost Elements | ||||
| 189 | COKA6 | CO Object: Control Data for Cost Elements | ||||
| 190 | COKAA | CO Object: Control Data for Variances and Results Analysis | ||||
| 191 | COKAQ | CO Object: Control Data for Cost Elem. (Inttab for Enqueue) | ||||
| 192 | COKEY_AD | IS A&D COKEY Extensions | ||||
| 193 | COKL | CO Object: Control Data for Activity Types | ||||
| 194 | COKL2 | CO Object: Control Data for Activity Types | ||||
| 195 | COKP | CO Object: Control Data for Primary Planning | ||||
| 196 | COKP1 | CO Object: Control Data for Primary Planning | ||||
| 197 | COKP2 | CO Object: Control Data for Primary Planning | ||||
| 198 | COKP3 | CO Object: Control Data for Primary Planning | ||||
| 199 | COKP4 | CO Object: Control Data for Primary Planning | ||||
| 200 | COKP5 | CO Object: Control Data for Primary Planning | ||||
| 201 | COKP6 | CO Object: Control Data for Primary Planning | ||||
| 202 | COKR | CO Object: Control Data for Statistical Key Figures | ||||
| 203 | COKR1 | CO Object: Control Data for Statistical Key Figures | ||||
| 204 | COKR2 | CO Object: Control Data for Statistical Key Figures | ||||
| 205 | COKR3 | CO Object: Control Data for Statistical Key Figures | ||||
| 206 | COKR4 | CO Object: Control Data for Statistical Key Figures | ||||
| 207 | COKR5 | CO Object: Control Data for Statistical Key Figures | ||||
| 208 | COKR6 | CO Object: Control Data for Statistical Key Figures | ||||
| 209 | COKS | CO Object: Control Data for Secondary Planning | ||||
| 210 | COKS1 | CO Object: Control Data for Secondary Cost Planning | ||||
| 211 | COKS2 | CO Object: Control Data for Secondary Cost Planning | ||||
| 212 | COKS3 | CO Object: Control Data for Secondary Planning | ||||
| 213 | COKS4 | CO Object: Control Data for Secondary Planning | ||||
| 214 | COKS5 | CO Object: Control Data for Secondary Planning | ||||
| 215 | COKS6 | CO Object: Control Data for Secondary Planning | ||||
| 216 | COOI | Commitments Management: Line Items | ||||
| 217 | COSB | CO Object: Total Variances/Results Analyses | ||||
| 218 | COSB1 | CO Object: Total Variances/Results Analyses | ||||
| 219 | COSB2 | CO Object: Total Variances/Results Analyses | ||||
| 220 | COSB3 | CO Object: Total Variances/Results Analyses | ||||
| 221 | COSB4 | CO Object: Total Variances/Results Analyses | ||||
| 222 | COSB5 | CO Object: Total Variances/Results Analyses | ||||
| 223 | COSB6 | CO Object: Total Variances/Results Analyses | ||||
| 224 | COSBD | CO Object: Total of variances/accruals, of which settled | ||||
| 225 | COSBD1 | CO Object: Total of variances/accruals, of which settled | ||||
| 226 | COSBD2 | CO Object: Total of variances/accruals, of which settled | ||||
| 227 | COSBD3 | CO Object: Total of variances/accruals, of which settled | ||||
| 228 | COSBD4 | CO Object: Total of variances/accruals, of which settled | ||||
| 229 | COSBD5 | CO Object: Total of variances/accruals, of which settled | ||||
| 230 | COSBD6 | CO Object: Total of variances/accruals, of which settled | ||||
| 231 | COSC | CO Object: Assignment Original Costing Sheets | ||||
| 232 | COSL | CO Object: Activity Type Totals | ||||
| 233 | COSL1 | CO Object: Activity Type Totals | ||||
| 234 | COSL2 | CO Object: Activity Type Totals | ||||
| 235 | COSLD | CO Object: Activity Type Totals - of Which Settled | ||||
| 236 | COSP | CO Object: Cost Totals for External Postings | ||||
| 237 | COSP1 | CO Object: Cost Totals for External Postings | ||||
| 238 | COSP2 | CO Object: Cost Totals for External Postings | ||||
| 239 | COSP3 | CO Object: Cost Totals for External Postings | ||||
| 240 | COSP4 | CO Object: Cost Totals for External Postings | ||||
| 241 | COSP5 | CO Object: Cost Totals for External Postings | ||||
| 242 | COSP6 | CO Object: Cost Totals for External Postings | ||||
| 243 | COSPD | CO Object: Settled Primary Cost Totals | ||||
| 244 | COSPD1 | CO Object: Settled Primary Cost Totals | ||||
| 245 | COSPD2 | CO Object: Settled Primary Cost Totals | ||||
| 246 | COSPD3 | CO Object: Settled Primary Cost Totals | ||||
| 247 | COSPD4 | CO Object: Settled Primary Cost Totals | ||||
| 248 | COSPD5 | CO Object: Settled Primary Cost Totals | ||||
| 249 | COSPD6 | CO Object: Settled Primary Cost Totals | ||||
| 250 | COSPP | Transfer of the Order in the COSP Table to the Project | ||||
| 251 | COSPR | CO Objekt: Enhancement to COSP for Dependency Planning | ||||
| 252 | COSR | CO Object: Statistical Key Figure Totals | ||||
| 253 | COSR1 | CO Object: Statistical Key Figure Totals | ||||
| 254 | COSR2 | CO Object: Statistical Key Figure Totals | ||||
| 255 | COSR3 | CO Object: Statistical Key Figure Totals | ||||
| 256 | COSR4 | CO Object: Statistical Key Figure Totals | ||||
| 257 | COSR5 | CO Object: Statistical Key Figure Totals | ||||
| 258 | COSR6 | CO Object: Statistical Key Figure Totals | ||||
| 259 | COSRA | CO Object: Statistical Key Fig. Totals (All Periods) | ||||
| 260 | COSS | CO Object: Cost Totals for Internal Postings | ||||
| 261 | COSS1 | CO Object: Cost Totals for Internal Postings | ||||
| 262 | COSS2 | CO Object: Cost Totals for Internal Postings | ||||
| 263 | COSS3 | CO Object: Cost Totals for Internal Postings | ||||
| 264 | COSS4 | CO Object: Cost Totals for Internal Postings | ||||
| 265 | COSS5 | CO Object: Cost Totals for Internal Postings | ||||
| 266 | COSS6 | CO Object: Cost Totals for Internal Postings | ||||
| 267 | COSSD | CO Object: Settled Secondary Cost Totals | ||||
| 268 | COSSD1 | CO Object: Settled Secondary Cost Totals | ||||
| 269 | COSSD2 | CO Object: Settled Secondary Cost Totals | ||||
| 270 | COSSD3 | CO Object: Settled Secondary Cost Totals | ||||
| 271 | COSSD4 | CO Object: Settled Secondary Cost Totals | ||||
| 272 | COSSD5 | CO Object: Settled Secondary Cost Totals | ||||
| 273 | COSSD6 | CO Object: Settled Secondary Cost Totals | ||||
| 274 | COSSP | Transfer of the Order COSS Table to the Project | ||||
| 275 | COST | CO Object: Price Totals | ||||
| 276 | COST2 | CO Object: Price Totals | ||||
| 277 | COVFP1 | CO object: Financial data line items, incl.document header | ||||
| 278 | COVO1 | CO Object: Open Items for Line Items (without doc. header) | ||||
| 279 | COVO2 | CO Object: Open Items for Line Items (without doc. header) | ||||
| 280 | COVO3 | CO Object: Open Items for Line Items (without doc. header) | ||||
| 281 | COVO4 | CO Object: Open Items for Line Items (without doc. header) | ||||
| 282 | COVO5 | CO Object: Open Items for Line Items (without doc. header) | ||||
| 283 | COVO6 | CO Object: Open Items for Line Items (without doc. header) | ||||
| 284 | COVP11 | CO Object: Line Items (by Period and Document Header) | ||||
| 285 | COVP12 | CO Object: Line Items (by Period and Document Header) | ||||
| 286 | COVP21 | CO Object: Line Items (by Period and Document Header) | ||||
| 287 | COVP22 | CO Object: Line Items (by Period and Document Header) | ||||
| 288 | COVP31 | CO Object: Line Items (by Period and Document Header) | ||||
| 289 | COVP32 | CO Object: Line Items (by Period and Document Header) | ||||
| 290 | COVP41 | CO Object: Line Items (by Period and Document Header) | ||||
| 291 | COVP42 | CO Object: Line Items (by Period and Document Header) | ||||
| 292 | COVP51 | CO Object: Line Items (by Period and Document Header) | ||||
| 293 | COVP52 | CO Object: Line Items (by Period and Document Header) | ||||
| 294 | COVP61 | CO Object: Line Items (by Period and Document Header) | ||||
| 295 | COVP62 | CO Object: Line Items (by Period and Document Header) | ||||
| 296 | CRFHD | Structure of the production resources/tools master | ||||
| 297 | CSKSB | Cost center master strucure for change documents | ||||
| 298 | CSKSF | Field selection from CSKS for master data validation | ||||
| 299 | CSKSI | Field Selection from CSKS | ||||
| 300 | CSKSP | Structure for cost center update (KOST1,TITAB) | ||||
| 301 | CSKS_BROAD | Cost Center: Fields for Broadcasting | ||||
| 302 | CSSL | Cost Center/Activity Type | ||||
| 303 | CYFI2 | Selection fields resource planning | ||||
| 304 | DIAFFH | PM resources | ||||
| 305 | DIIFLOX | Functional location | ||||
| 306 | DIIHSG | Permits | ||||
| 307 | DIINET | Object link | ||||
| 308 | DIKBED | PM Capacity Requirements | ||||
| 309 | DIQMELX | PM Notification | ||||
| 310 | DIQMSMX | Tasks for notification item | ||||
| 311 | DIRESB | PM Materials | ||||
| 312 | DITEXT | Long text | ||||
| 313 | DJEST | Individual Status per Object: Key Date Based Management | ||||
| 314 | EAMS_S_BO_TL_PRT_ASS | Business Object Task List - PRTs assigned | ||||
| 315 | EAMS_S_SP_WCM_WCD | WCM Work Clearance Document (&template) | ||||
| 316 | EAM_D_IHPA_TIME | Validity for Partner Assignment in Plant Maintenance | ||||
| 317 | ELEM01 | Subprocess for LDB-01 | ||||
| 318 | ELEM02 | Subprocess for LDB-02 | ||||
| 319 | ELEM03 | Subprocess for LDB-03 | ||||
| 320 | EVBS | Premise | ||||
| 321 | EVFG | CNE5: Percentage of completion | ||||
| 322 | EVOF | CNE5: Object parameter PS earned value analysis | ||||
| 323 | EVOFL | Objects, fields (PS earned value analysis) | ||||
| 324 | EVOP | Object parameters | ||||
| 325 | EVOPD | Object parameters (dialog) | ||||
| 326 | EVOP_VS | Object parameters (Project version) | ||||
| 327 | EVPVL | Period values for percentage of completion (PS EV) | ||||
| 328 | EWAROUTE_MAIN | Fields for Route | ||||
| 329 | EWMINSPDETAIL | Inspection List Detail | ||||
| 330 | EWMOBJINSP | Inspection date for equipment or functional location | ||||
| 331 | EWUCOO | EMU: Controlling object currencies | ||||
| 332 | FCABP | FI-CA: Document Item | ||||
| 333 | FCOMS_ACTTYPE_CTRL_DATA_KEY | BI-IP Control Data for Activiity Types: Key | ||||
| 334 | FERC_C5 | Specific clearing cost object assignments | ||||
| 335 | FERC_C6 | Regulatory indicators of CO objects | ||||
| 336 | FERC_D1 | Paths per account, sender and receiver | ||||
| 337 | FERC_D1_EXTRACT | Extract data for sender and receiver | ||||
| 338 | FERC_D2 | Documents per sender and account | ||||
| 339 | FERC_D2_EXTRACT | Extract data for sender documents | ||||
| 340 | FERC_D3 | Totals per sender and natural account | ||||
| 341 | FERC_D5 | Totals per reg. account and final object | ||||
| 342 | FERC_D6 | Totals per clearing cost element | ||||
| 343 | FERC_F1 | Detailed audit trace file | ||||
| 344 | FERC_F2 | Compact audit trace file | ||||
| 345 | FERC_F3 | Totals per source object, transaction type, and CO element | ||||
| 346 | FERC_F4 | Variances on CO objects | ||||
| 347 | FERC_F5 | Total actual costs on regulatory objects | ||||
| 348 | FERC_F6 | Organizational assignments of CO objects | ||||
| 349 | FERC_SDF3 | Totals per object and transaction type | ||||
| 350 | FINT_BSP_SRU_SRULE | Settlement Rules | ||||
| 351 | FLEET | Fleet Attributes | ||||
| 352 | FMACTPOS | FIFM: List of Internal Item Numbers | ||||
| 353 | FMAPSTAT | FIFM: System Status for FIFM Acct Asst Objects | ||||
| 354 | FMBE | FI-FM Cash Levels | ||||
| 355 | FMDY | FIFM: Screen Fields | ||||
| 356 | FMEP | FI-FM Line Items | ||||
| 357 | FMFCPO | FIFM: Commitment Summarization Item | ||||
| 358 | FMFCTR | Funds Center Master Record | ||||
| 359 | FMFCTRBP | Budget Object Group Definitions | ||||
| 360 | FMFCTR_CD | Transfer structure for funds centers change documents | ||||
| 361 | FMFPO | FIFM: Commitment Item | ||||
| 362 | FMFREEPOS | FIFM: Free List of Internal Item Numbers | ||||
| 363 | FMHICTR | FIFB: DB Table for Hierarchy Relations in a Center | ||||
| 364 | FMHIPOS | FIFM: DB Table for Hierarchy Relations for an Item | ||||
| 365 | FMIDATA | Common Data for Funds Management Actual Data | ||||
| 366 | FMIFIIT | FI Line Item Table in Funds Management | ||||
| 367 | FMII1 | Allocation of CO Acct Asst to FM Acct Asst | ||||
| 368 | FMIOI | Commitment Documents Funds Management | ||||
| 369 | FMKOBP | Local Authority Funds Management Additional Data | ||||
| 370 | FMREF | Active availability ctrl: Cross commitments reference table | ||||
| 371 | FMSP | Copy FMSU table order to project | ||||
| 372 | FMSU | FI-FM Totals Records | ||||
| 373 | FMSU1 | FI-FM Financial Data Totals Records | ||||
| 374 | FMZUOB | Allocation of CO Object to FM Account Assignment | ||||
| 375 | FRMLS_API_XST | RMS-FRM: Scope of Application for Formula | ||||
| 376 | GBGMK | Work table master warranty header | ||||
| 377 | GVIAK11 | Update structure for VIAK11 (D-tape records) | ||||
| 378 | GVIMI38 | Change structure for allocation table VIMI38 | ||||
| 379 | HIKO | Order master data history | ||||
| 380 | HIVG | PM order history - operations | ||||
| 381 | HIVGB | Document table structure f. order history operations | ||||
| 382 | HUSSTAT | Individual Status for Each Handling Unit | ||||
| 383 | HUSTOBJ | Information about HU Status Object | ||||
| 384 | I9AMVMK | IS-B: RM Model/Include DBTab Variable Characteristics | ||||
| 385 | IBAPI_ORDER_PRT | PRT Administrative Structure ALM Order BAPIs (Internal) | ||||
| 386 | IFLOT | Functional Location (Table) | ||||
| 387 | IFLOT_INC | Data part functional location | ||||
| 388 | IFMAPSTAT | FIFM: User Status | ||||
| 389 | IFMFGRCN_FIELDS_BP | Reconciliation: List of fields supported by BCS data providr | ||||
| 390 | IFMFGRCN_FIELDS_CO | Reconciliation fields available from CO Actuals provider | ||||
| 391 | IFMKAFIP | FIFM: Master Data Reporting on Cost Element Commitment Item | ||||
| 392 | IFMRHICTR | Funds Center Hierarchy | ||||
| 393 | IFMRHIPOS | Commitment Item Hierarchy | ||||
| 394 | IHPA | Plant Maintenance: Partners | ||||
| 395 | IHSG | Object-Related Permits in Plant Maintenance | ||||
| 396 | IMAK | Appropriation requests - general data | ||||
| 397 | IMAK_INC | Structure of table IMAK w/o key fields | ||||
| 398 | IMAV | Appropriation request variant | ||||
| 399 | IMPR | Investment Program Positions | ||||
| 400 | IMPTT | Measuring Point (Table) | ||||
| 401 | IMRG | Measurement Document | ||||
| 402 | IMZO | Assignment Table: CO Object - Capital Investment Prog.Pos. | ||||
| 403 | IMZR | Assignment Table: CO Object - Cap.Inv.Prog.Pos. (Reports) | ||||
| 404 | INET | Object networking | ||||
| 405 | IODISP | Database structure for dispatching | ||||
| 406 | IOITEM | Database structure for order items | ||||
| 407 | IOOPCAP | Database structure for capacities - order operations | ||||
| 408 | IOOPSCAP | Database structure individual capacities - order operations | ||||
| 409 | IOSEQUEN | Database structure for order sequences | ||||
| 410 | IOSOCAP | Database structure for capacities - order sub-operations | ||||
| 411 | IOSOPER | Database structure for order sub-operations | ||||
| 412 | IOSOSCAP | Database structure for ind. capacities order sub-operations | ||||
| 413 | IRLOT | Reference Functional Location (Table) | ||||
| 414 | ISMP | SDB: Problem Table | ||||
| 415 | ISOL | SDB: Solution table | ||||
| 416 | ISSR_IF_VSDATA | ISSR: Vorsystemsinformationen | ||||
| 417 | JBAFOKOPO | Condition Items | ||||
| 418 | JBALMDLLOC | ALM: Higher-Level Data of Detailed Log | ||||
| 419 | JBCFKOPF | Cash Flow Transaction: Header Data | ||||
| 420 | JBCFZSTRKOPF | Cash Flow Transaction: Header Data for Cash Flow | ||||
| 421 | JBDEURO | Indicator Table for EURO Conversion (CC) | ||||
| 422 | JBDOBJ1 | Object Table for Financial Transactions, General Part | ||||
| 423 | JBDST6 | Bank PA - Internal Lock Object | ||||
| 424 | JBDVTMD | Variable transaction - master data | ||||
| 425 | JBD_STR_JBDVTMD_RT | Structure f.Reading/Checking Residence Time Object VTMD_ARCH | ||||
| 426 | JBD_STR_JBRDBKO_RT | Structure f.Reading/Checking Residence Time f.Obj.GETR_ARCH | ||||
| 427 | JBD_STR_JBRHKO_RT | Structure f.Reading/Checking Residence Time f. Obj.GTVS_ARCH | ||||
| 428 | JBNIPL | ALM Non Interest Profit and Loss | ||||
| 429 | JBRACCOUNT | RM BP Update Administration for Account Balances | ||||
| 430 | JBRBPCFVN | RM: BP Update Management for Cash Flows | ||||
| 431 | JBRIORDE | RM: Reduced VWORDE Structure for Forw. Securities Selection | ||||
| 432 | JBROBJCHAR | RM: Flat Structure of Characteristics for a Financial Object | ||||
| 433 | JBROBJDERI | RM: Structure of Financial Object for Derivation | ||||
| 434 | JBRSVABEST | RM: Header Table SDTFT (Additional Info.) for Saved Datasets | ||||
| 435 | JBRSVBEWEG | RM: Flow Table for Cat. of Prim. Trans. for Saved Datasets | ||||
| 436 | JBRSVFML | RM: CF Formula Table for Cat. Prim.Trans. for Saved Datasets | ||||
| 437 | JBRSVHIER | RM: Hierarchy Structure Table of xDTFT for Saved Datasets | ||||
| 438 | JBRSVKO | RM: Header Table of SDTFT for Saved Datasets | ||||
| 439 | JBRSVKOET | RM: Header Table of Cat. of Prim. Trans for Saved Datasets | ||||
| 440 | JBRSVMSEG | RM: Val. Parameters of Cat.of Prim. Trans.for Saved Datasets | ||||
| 441 | JBRSVOPTI | RM: Option Data Table of Cat. Prim. Trans for Saved Datasets | ||||
| 442 | JBRTBSTD01 | RM: INCLUDE for Position of Generic Transactions | ||||
| 443 | JBRTKO02 | RM: INCLUDE for Header Information xSDTFT/SDTFT | ||||
| 444 | JBSSAMOB | Regulatory Reporting - Grouping Objects | ||||
| 445 | JEST | Individual Object Status | ||||
| 446 | JEST1 | Individual Object Status | ||||
| 447 | JEST2 | Individual Status per Object | ||||
| 448 | JEST3 | Individual Status per Object | ||||
| 449 | JEST4 | Individual Status per Object | ||||
| 450 | JEST_UPD | Individual Status per Object - Interface Structure | ||||
| 451 | JOSTD | Dialog structure for status object | ||||
| 452 | JSTO | Status object information | ||||
| 453 | JSTO1 | Status object information | ||||
| 454 | JSTO2 | Status Object Information | ||||
| 455 | JSTO3 | Status Object Information | ||||
| 456 | JSTO4 | Status Object Information | ||||
| 457 | JSTO_UPD | Status Object Information - Interface Structure | ||||
| 458 | J_3RTSE | Secondary index table for VAT | ||||
| 459 | KAEP_BPEJ_X | Item Field Data: Annual Values for Budget Line Items | ||||
| 460 | KAEP_COFP_PLN_X | Item field list for plan financial line item report | ||||
| 461 | KAEP_COFP_X | Item field list for the actual finance line item report | ||||
| 462 | KBED | Capacity Requirements Records | ||||
| 463 | KBED01 | Capacity Requirement Records (for LDB) - 01 | ||||
| 464 | KBED01_UPDATE_RELEVANT | Fields relevant to the update from KBED/Z (sim. vers.) | ||||
| 465 | KBED04 | Capacity Requirement Records for Planned Orders (LDB) | ||||
| 466 | KBED1A | Capacity Requirements Records for Elements (LDB) -01 | ||||
| 467 | KBED2A | Capacity Requirements Records for Elements (LDB) - 02 | ||||
| 468 | KBED3A | Capacity Requirements Records for Elements (LDB) - 03 | ||||
| 469 | KBEDI | KBED Include structure (cap. reqmnts records) | ||||
| 470 | KBEDP | Data for printing individual capacity commitments | ||||
| 471 | KBKO | Header Record for Capacity Requirements | ||||
| 472 | KBKOI | KBKO Include Structure (Capacity Requirements Header) | ||||
| 473 | KKP_CH | Interface Structure for Cost Object Hierarchy | ||||
| 474 | KLFAZ | Credit Limit: Header Structure for Facilities | ||||
| 475 | KLOBJDERI | Financial Object Structure for Derivation (Limit) | ||||
| 476 | KLREP | Risk Line Items | ||||
| 477 | KMA1L | Dynpro fields list processing SAPMKMA1 | ||||
| 478 | KOST1 | csks + cskt | ||||
| 479 | KPU2_OBJNR | Activate integrated planning: Object number table | ||||
| 480 | KREPCKPH | Structure for cost object report | ||||
| 481 | KV011 | Variances: Output Quantities | ||||
| 482 | KV011V | Variances: Output Quantities for Target Cost Versions | ||||
| 483 | KV012 | Variances: Costs | ||||
| 484 | KV013 | Variances: Values | ||||
| 485 | KV020 | Variances: Cost Table | ||||
| 486 | LFINFX | Assignment delivery information to Project System objects | ||||
| 487 | MAM_20_NOTIF_HEADER | Notification Header | ||||
| 488 | MAM_25_NOTIF_HEADER | Notification Header | ||||
| 489 | MAM_30_NOTIF_HEADER | Notification Header | ||||
| 490 | MASSCONTHEAD_S | Header Data Customer Contract | ||||
| 491 | MASSQUOTHEAD_S | Header Data Customer Quotation | ||||
| 492 | MASSSDHEAD_S | Sales order header data | ||||
| 493 | MCAFKO | Order header data PP orders | ||||
| 494 | MCAFVG | Order Operation | ||||
| 495 | MCIPMIS | PMIS: Master data characteristics for PMIS before image | ||||
| 496 | MCPLOS | Communication R/2 - R/3 link for inspection lot | ||||
| 497 | MCVBAK | Sales Document: Header Data | ||||
| 498 | MCVBAKB | Reference Structure from MCVBAK for Function Module | ||||
| 499 | MCVBAP | Sales Document: Item Data | ||||
| 500 | MCVBAPB | Reference Structure from MCVBAP for Function Module |