SAP ABAP Table IOSOCAP (Database structure for capacities - order sub-operations)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-SFC (Application Component) Production Orders
⤷ COIS (Package) Order Information System
⤷ PP-SFC (Application Component) Production Orders
⤷ COIS (Package) Order Information System
Basic Data
Table Category | INTTAB | Structure |
Structure | IOSOCAP | Table Relationship Diagram |
Short Description | Database structure for capacities - order sub-operations |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | .INCLUDE | 0 | 0 | Capacity requirements: dialog table for KBED | |||||
2 | .INCLUDE | 0 | 0 | Capacity Requirements Records | |||||
3 | MANDT | MANDT | MANDT | CLNT | 3 | 0 | Client | T000 | |
4 | BEDID | BEDID | BEDID | NUMC | 12 | 0 | ID of the capacity requirements record | KBKO | |
5 | BEDZL | CIM_COUNT | CIM_COUNT | NUMC | 8 | 0 | Internal counter | ||
6 | CANUM | CY_COUNT | CY_COUNT | NUMC | 4 | 0 | Counters for cap. rqmts. records (various caps. + indiv.caps | * | |
7 | .INCLUDE | 0 | 0 | KBED Include structure (cap. reqmnts records) | |||||
8 | ARBID | ARBPLATZ | NUM08 | NUMC | 8 | 0 | Work center ID | ||
9 | TYPKZ | TYPKZ | TYPKZ | CHAR | 1 | 0 | Type of object causing the load (order category) | ||
10 | OBJKZ | OBJKZ | OBJKZ | CHAR | 1 | 0 | Indicator: Remaining split record | ||
11 | KAPID | KAPID | KAPID | NUMC | 8 | 0 | Capacity ID | KAKO | |
12 | BEDKZ | BEDKZ | X | CHAR | 1 | 0 | Indicator: Remaining split record | ||
13 | KRUESOLL | CY_KRUESOL | KAPBED | FLTP | 16 | 16 | Scheduled cap. requirements for the op. segment "setup" | ||
14 | KRUEREST | CY_KRUERES | KAPBED | FLTP | 16 | 16 | Remaining capacity rqmts. for operation segment "Setup" | ||
15 | KBEASOLL | CY_KBEASOL | KAPBED | FLTP | 16 | 16 | Process target capacity requirements for operation segment | ||
16 | KBEAREST | CY_KBEARES | KAPBED | FLTP | 16 | 16 | Remaining capacity rqmts.for operation segment "Processing" | ||
17 | KABRSOLL | CY_KABRSOL | KAPBED | FLTP | 16 | 16 | Scheduled cap. requirements for the op. segment teardown | ||
18 | KABRREST | CY_KABRRES | KAPBED | FLTP | 16 | 16 | Remaining capacity requirements for op. segment "tear down" | ||
19 | KEINH | CY_KEINH | MEINS | UNIT | 3 | 0 | Unit of of measure for displaying capacity requirements | T006 | |
20 | FSTAD | FSTAD | DATUM | DATS | 8 | 0 | Earliest start / date | ||
21 | FSTAU | FSTAU | T | TIMS | 6 | 0 | Earliest start / time | ||
22 | FENDD | FENDD | DATUM | DATS | 8 | 0 | Earliest finish /date | ||
23 | FENDU | FENDU | T | TIMS | 6 | 0 | Earliest finish /time | ||
24 | SSTAD | SSTAD | DATUM | DATS | 8 | 0 | Latest start / date | ||
25 | SSTAU | SSTAU | T | TIMS | 6 | 0 | Latest start / time | ||
26 | SENDD | SENDD | DATUM | DATS | 8 | 0 | Latest finish / date | ||
27 | SENDU | SENDU | T | TIMS | 6 | 0 | Latest finish / time | ||
28 | ISTAD | ISTAD | DATUM | DATS | 8 | 0 | Actual start / date | ||
29 | ISTAU | ISTAU | T | TIMS | 6 | 0 | Actual start / time | ||
30 | IENDD | IENDD | DATUM | DATS | 8 | 0 | Actual finish / date | ||
31 | IENDU | IENDU | T | TIMS | 6 | 0 | Actual finish / time | ||
32 | PENDD | PENDD | DATUM | DATS | 8 | 0 | Forecast finish / date | ||
33 | PENDU | PENDU | T | TIMS | 6 | 0 | Forecast finish / time | ||
34 | ISPLI | ISPLI | SPLITTANZ | DEC | 3 | 0 | Actual number of splits | ||
35 | KPVER | CR_VERTL | CR_VERTL | CHAR | 8 | 0 | Distribution of capacity requirements (Planned/prod.order) | TC29 | |
36 | OBSTA | OBSTA | J_OBJNR | CHAR | 22 | 0 | Object status (order status) | ONR00 | |
37 | AUFPL | CO_AUFPL | AUFPL | NUMC | 10 | 0 | Routing number of operations in the order | ||
38 | APLZL | CO_APLZL | CO_APLZL | NUMC | 8 | 0 | General counter for order | AFVC | |
39 | PLNUM | PLNUM | PLNUM | CHAR | 10 | 0 | Planned order number | PLAF | |
40 | PLNTY | PLNTY | PLNTY | CHAR | 1 | 0 | Task List Type | TCA01 | |
41 | PLNNR | PLNNR | PLNNR | CHAR | 8 | 0 | Key for Task List Group | ||
42 | PLNAL | PLNAL | ALTNR | CHAR | 2 | 0 | Group Counter | ||
43 | ZAEHL | CIM_COUNT | CIM_COUNT | NUMC | 8 | 0 | Internal counter | ||
44 | PLNFL | PLNFOLGE | PLNFOLGE | CHAR | 6 | 0 | Sequence | ||
45 | ZAEHF | CIM_COUNT | CIM_COUNT | NUMC | 8 | 0 | Internal counter | ||
46 | PLNKN | PLNKN | KNTNR | NUMC | 8 | 0 | Number of the task list node | ||
47 | ZAEHP | CIM_COUNT | CIM_COUNT | NUMC | 8 | 0 | Internal counter | ||
48 | SPLKN | SPLNKN | KNTNR | NUMC | 8 | 0 | Number of the task list node of the sub-operation | ||
49 | SZAEHL | CIM_COUNT | CIM_COUNT | NUMC | 8 | 0 | Internal counter | ||
50 | SAFNR | SAFNR | SAFNR | CHAR | 10 | 0 | SOP order number | ||
51 | VORNR | VORNR | VORNR | CHAR | 4 | 0 | Operation/Activity Number | ||
52 | OTYPE | OTYPE | OTYPE | CHAR | 2 | 0 | Object Type | T778O | |
53 | PERNR | PERNR_D | PERNR | NUMC | 8 | 0 | Personnel Number | ||
54 | CANUMF | CANUMF | NUM4 | NUMC | 4 | 0 | Counter for the main capacity requirements record | ||
55 | SPLIT | CY_SPLIT | INT1 | INT1 | 3 | 0 | Split number | ||
56 | KBSTA | CY_KBSTA | J_OBJNR | CHAR | 22 | 0 | Status of a capacity requirements (object number) | ONR00 | |
57 | FSSBD | FSSBD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Processing (date) | ||
58 | FSSBZ | FSSBZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Processing (time) | ||
59 | FSSAD | FSSAD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Teardown (date) | ||
60 | FSSAZ | FSSAZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Teardown (time) | ||
61 | SSSBD | SSSBD | DATUM | DATS | 8 | 0 | Latest scheduled start: Processing (date) | ||
62 | SSSBZ | SSSBZ | ATIME | TIMS | 6 | 0 | Latest scheduled start: Processing (time) | ||
63 | SSSAD | SSSAD | DATUM | DATS | 8 | 0 | Latest scheduled start: Teardown (date) | ||
64 | SSSAZ | SSSAZ | ATIME | TIMS | 6 | 0 | Latest scheduled start: Teardown (time) | ||
65 | MGVRG | MGVRG | MENG13 | QUAN | 13 | 3 | Operation Quantity | ||
66 | MEINH | VORME | MEINS | UNIT | 3 | 0 | Unit of measure for activity | T006 | |
67 | RSTUF | RSTUF | REDST | NUMC | 1 | 0 | Reduction level which reduces operation lead time | ||
68 | PLSCN | PLSCN | PLSCN | NUMC | 3 | 0 | Planning Scenario of Long-Term Planning | PLSC | |
69 | BSTKZ | CY_BSTKZ | CY_BSTKZ | CHAR | 1 | 0 | Indicator rqmts.record is confirmed (cap.availability check) | ||
70 | BEDZLF | BEDZLF | CIM_COUNT | NUMC | 8 | 0 | BEDZL of Main Operation (for Phases and Their Main Ops) | ||
71 | PHASE_KZ | PHASE_KZ | PHASE_KZ | CHAR | 1 | 0 | Indicator: Phase | ||
72 | MAXBD_KZ | MAXBD_KZ | XFELD | CHAR | 1 | 0 | Indicator: Capacity fully committed | ||
73 | ANZMA | ANZMS | ANZMA | DEC | 5 | 2 | Number of employees | ||
74 | .INCLUDE | 0 | 0 | Include structure KBEZ (additional data for KBED) | |||||
75 | VGW01 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
76 | VGE01 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
77 | VGW02 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
78 | VGE02 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
79 | VGW03 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
80 | VGE03 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
81 | VGW04 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
82 | VGE04 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
83 | VGW05 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
84 | VGE05 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
85 | VGW06 | VGWRT | VGWRT | QUAN | 9 | 3 | Standard Value | ||
86 | VGE06 | VGWRTEH | MEINS | UNIT | 3 | 0 | Unit of measure for the standard value | T006 | |
87 | USR04 | USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
88 | USE04 | USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
89 | USR05 | USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
90 | USE05 | USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
91 | LEK01 | CO_LEIKZ | XFELD | CHAR | 1 | 0 | Indicator: No remaining activity expected | ||
92 | LEK02 | CO_LEIKZ | XFELD | CHAR | 1 | 0 | Indicator: No remaining activity expected | ||
93 | LEK03 | CO_LEIKZ | XFELD | CHAR | 1 | 0 | Indicator: No remaining activity expected | ||
94 | LEK04 | CO_LEIKZ | XFELD | CHAR | 1 | 0 | Indicator: No remaining activity expected | ||
95 | LEK05 | CO_LEIKZ | XFELD | CHAR | 1 | 0 | Indicator: No remaining activity expected | ||
96 | LEK06 | CO_LEIKZ | XFELD | CHAR | 1 | 0 | Indicator: No remaining activity expected | ||
97 | RSTZE | RSTZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for setup time | ||
98 | BEAZE | BEAZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for processing time | ||
99 | ARUZE | ARUZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for teardown | ||
100 | ARBEI | ARBEIT | ARBEIT | QUAN | 7 | 1 | Work involved in the activity | ||
101 | ARBEH | ARBEITE | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
102 | LEKNW | CO_LEIKZ | XFELD | CHAR | 1 | 0 | Indicator: No remaining activity expected | ||
103 | ASVRG | ASVRG | MENG13 | QUAN | 13 | 3 | Operation scrap | ||
104 | UMREN | CP_UMREN | UMBSN | DEC | 5 | 0 | Denominator for converting rtg and op units of measure | ||
105 | UMREZ | CP_UMREZ | UMBSZ | DEC | 5 | 0 | Numerator for converting task list and oper. un. of measure | ||
106 | BMSCH | BMSCH | BMSCH | QUAN | 13 | 3 | Base Quantity | ||
107 | LMNGA | LMNGA | MENG13 | QUAN | 13 | 3 | Total Yield Confirmed | ||
108 | XMNGA | XMNGA | MENG13 | QUAN | 13 | 3 | Total scrap quantity confirmed | ||
109 | ISMNW | CO_ISMNW | MENG13 | QUAN | 13 | 3 | Actual work | ||
110 | ISM01 | CO_RUMNG | MENGV13 | QUAN | 13 | 3 | Previously confirmed activity | ||
111 | ISM02 | CO_RUMNG | MENGV13 | QUAN | 13 | 3 | Previously confirmed activity | ||
112 | ISM03 | CO_RUMNG | MENGV13 | QUAN | 13 | 3 | Previously confirmed activity | ||
113 | ISM04 | CO_RUMNG | MENGV13 | QUAN | 13 | 3 | Previously confirmed activity | ||
114 | ISM05 | CO_RUMNG | MENGV13 | QUAN | 13 | 3 | Previously confirmed activity | ||
115 | ISM06 | CO_RUMNG | MENGV13 | QUAN | 13 | 3 | Previously confirmed activity | ||
116 | ISERH | ISERH | VGWRT | QUAN | 9 | 3 | Confirmed break time | ||
117 | ZEIER | DZEIER | MEINS | UNIT | 3 | 0 | Unit for the break time | T006 | |
118 | ISDD | ISDD | DATUM | DATS | 8 | 0 | Actual start: Execution (date) | ||
119 | ISDZ | ISDZ | ATIME | TIMS | 6 | 0 | Actual start: Execution/setup (time) | ||
120 | IERD | IERD | DATUM | DATS | 8 | 0 | Actual finish: Setup (date) | ||
121 | IERZ | IERZ | ATIME | TIMS | 6 | 0 | Actual finish: Setup (time) | ||
122 | ISBD | ISBD | DATUM | DATS | 8 | 0 | Actual start: Processing (date) | ||
123 | ISBZ | ISBZ | ATIME | TIMS | 6 | 0 | Actual start: Processing (time) | ||
124 | IEBD | IEBD | DATUM | DATS | 8 | 0 | Actual finish: Processing (date) | ||
125 | IEBZ | IEBZ | ATIME | TIMS | 6 | 0 | Actual processing finish (time) | ||
126 | ISAD | ISAD | DATUM | DATS | 8 | 0 | Actual start: Teardown (date) | ||
127 | ISAZ | ISAZ | ATIME | TIMS | 6 | 0 | Actual start: Teardown (time) | ||
128 | IEDD | IEDD | DATUM | DATS | 8 | 0 | Actual finish: Execution (date) | ||
129 | IEDZ | IEDZ | ATIME | TIMS | 6 | 0 | Actual finish: Execution (time) | ||
130 | PEDD | CO_PEDD | DATUM | DATS | 8 | 0 | Forecast finish date of operation from confirmation | ||
131 | PEDZ | CO_PEDZ | ATIME | TIMS | 6 | 0 | Forecast finish time of operation from confirmation | ||
132 | OFM01 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
133 | OFM02 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
134 | OFM03 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
135 | OFM04 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
136 | OFM05 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
137 | OFM06 | CO_SCHAETZ | VGWRT | QUAN | 9 | 3 | Forecast value used to update the standard value | ||
138 | OFMNW | OFMNW | ARBEIT | QUAN | 7 | 1 | Forecasted work (actual + remaining) | ||
139 | PDAU | PDAU | DAUER_4_1 | QUAN | 5 | 1 | Forecasted duration of activity from confirmation | ||
140 | PDAE | PDAE | MEINS | UNIT | 3 | 0 | Unit of the forecasted duration from the confirmation | T006 | |
141 | DAUNO | DAUNOR | DAUER_4_1 | QUAN | 5 | 1 | Normal duration of the activity | ||
142 | DAUNE | DAUNORE | MEINS | UNIT | 3 | 0 | Normal duration/unit | T006 | |
143 | RMNGA | RMNGA | MENGV13 | QUAN | 13 | 3 | Total confirmed rework quantity | ||
144 | ILE01 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | T006 | |
145 | ILE02 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | T006 | |
146 | ILE03 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | T006 | |
147 | ILE04 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | T006 | |
148 | ILE05 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | T006 | |
149 | ILE06 | CO_ISMNGEH | MEINS | UNIT | 3 | 0 | Unit of measure for the activity to be confirmed | T006 | |
150 | PER_EX | CY_PEREX | KREUZ | CHAR | 1 | 0 | Entry in KPER exists for this split | ||
151 | DELTA_ST | CY_DELTAST | MENGV13 | QUAN | 13 | 3 | Time Difference Between Start Capacity and Individ. Capacity | ||
152 | DELTA_EN | CY_DELTAEN | MENGV13 | QUAN | 13 | 3 | Time Difference Between Fin. Capacity and Individ. Capacity | ||
153 | .INCLUDE | 0 | 0 | Capacity requirements: Additional dialog fields for KBED | |||||
154 | AUFNR | AUFNR | AUFNR | CHAR | 12 | 0 | Order Number | * | |
155 | UVORN | UVORN | VORNR | CHAR | 4 | 0 | Suboperation | ||
156 | ARBPL | ARBPL | ARBPL | CHAR | 8 | 0 | Work center | ||
157 | LTXA1 | LTXA1 | TEXT40 | CHAR | 40 | 0 | Operation short text | ||
158 | LTXA2 | LTXA2 | TEXT40 | CHAR | 40 | 0 | Second line of the description | ||
159 | KAPAR | KAPART | KAPART | CHAR | 3 | 0 | Capacity category | * | |
160 | BEDSOLL | CY_KBEDSOL | CY_KBED_P | QUAN | 7 | 2 | Capacity requirements scheduled for the operation/activity | ||
161 | KEHSOLL | CY_KEINH | MEINS | UNIT | 3 | 0 | Unit of of measure for displaying capacity requirements | * | |
162 | UELSOLL | CY_UEBERL | XFELD | CHAR | 1 | 0 | Capacity requirements greater (field overflow) | ||
163 | BEDREST | CY_KBEDRES | CY_KBED_P | QUAN | 7 | 2 | Remaining capacity requirements scheduled for operation | ||
164 | KEHREST | CY_KEINH | MEINS | UNIT | 3 | 0 | Unit of of measure for displaying capacity requirements | * | |
165 | UELREST | CY_UEBERL | XFELD | CHAR | 1 | 0 | Capacity requirements greater (field overflow) | ||
166 | BREAKS | BREAKS | XFELD | CHAR | 1 | 0 | Indicator: Scheduling allowing for breaks | ||
167 | ERR_MASK | ERR_MASK | ERR_MASK | CHAR | 5 | 0 | Error mask | ||
168 | FLG_SEL | SELKZ | SELKZ | CHAR | 1 | 0 | Selection flag | ||
169 | INDBT | TABIX_D | TABIX | INT4 | 10 | 0 | Field defined as in SY-TABIX | ||
170 | .INCLUDE | 0 | 0 | Version: PS version, version-related key fields | |||||
171 | VSNMR | VSNMR | VSNMR | CHAR | 12 | 0 | Number or description of a version | ||
172 | .INCLUDE | 0 | 0 | Include for KBED (versions) | |||||
173 | BEDIDORG | BEDID | BEDID | NUMC | 12 | 0 | ID of the capacity requirements record | * | |
174 | BEDZLORG | CIM_COUNT | CIM_COUNT | NUMC | 8 | 0 | Internal counter | ||
175 | CANUMORG | CY_COUNT | CY_COUNT | NUMC | 4 | 0 | Counters for cap. rqmts. records (various caps. + indiv.caps | * | |
176 | WERKS | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
177 | KTEXT | KAPTEXT | TEXT40 | CHAR | 40 | 0 | Capacity short text | ||
178 | KZ_MARK | CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
179 | INDEX_NODE | TABIX_D | TABIX | INT4 | 10 | 0 | Field defined as in SY-TABIX | ||
180 | .INCLUDE | 0 | 0 |
Foreign Keys
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |