SAP ABAP Message Class 61 (Error Messages for MRP)
Basic Data
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
Attributes
Message class 61
Short Description Error Messages for MRP  
Changed On 20131127 
Last Changed At 174350 
Messages
# Message Message Short Text Documentation status Authorization check
1 00 Archive function error  
2 000 General program error. Please notify SAP development  
3 001 Argument & not in Table &  
4 002 Planned order & already exists  
5 003 Planned order & does not exist  
6 004 Material & does not exist in plant &  
7 005 The scrap quantity must be smaller than the order quantity  
8 006 Please enter completion date and/or start date  
9 007 The processing of customer data is not allowed here  
10 008 Material &1 &2 &3 is not planned automatically Space: object requires documentation
11 009 Please specify the order deadlines in ascending order  
12 01 Kernel function error  
13 010 Planned order & will be created  
14 011 Planned order & will be changed  
15 012 Planned order & will be deleted  
16 013 Sales order data was cancelled  
17 014 Sales order data does not exist  
18 015 Dates incorrect (start date > finish date)  
19 016 You have made no changes  
20 017 Please check the firming indicator The short text describes the object sufficiently
21 018 Invalid procurement type  
22 019 Special procurement type & is not allowed with procurement type &  
23 02 Error in communication table  
24 020 No scheduling information exists  
25 021 A requirement quantity of zero is not allowed  
26 022 The requirements date lies after the planned finish date on time axis  
27 023 A calculation of the number of partial lots is not possible  
28 024 A calculation of the total quantity is not possible  
29 025 Please enter partial lot quantity or number of partial lots  
30 026 Please create the components  
31 027 No material components were determined  
32 028 Entry of material components is not allowed for this order type  
33 029 Function code & not allowed  
34 03 No entry in TCLO for object &  
35 030 Planned order not defined for external procurement  
36 031 Material data of component & & not maintained  
37 032 Please enter release date or scheduled delivery date  
38 033 Planned order & cannot be converted  
39 034 Purchase requisition & & already exists  
40 035 Please enter the delivering plant  
41 036 The delivering plant is the same as the ordering plant. Please correct  
42 037 Supplying plant & does not exist  
43 038 Delivering plant was cancelled  
44 039 Planned order & converted to purchase requisiton & &  
45 04 Maintain abbreviation and description in menu option for document status  
46 040 MRP controller &2 does not exist in plant &1  
47 041 No planned orders exist for selected criterion  
48 042 Planned order already converted  
49 043 Please select a planned order  
50 044 & Planned orders converted into purchase requisitions Space: object requires documentation
51 045 No planned orders were selected  
52 046 Planned orders were converted  
53 047 Change to a directly produced planned order - please note long text Space: object requires documentation
54 048 No search help available. Use collective display for planned orders. Space: object requires documentation
55 049 Planned order was converted - no reset is possible  
56 05 Texts exist for status & -> you cannot delete  
57 050 Invalid planning run type  
58 051 Processing key & invalid for single-item planning  
59 052 Please check input parameters  
60 053 To start the planning run, press enter  
61 054 MRP carried out for & & & Space: object requires documentation
62 055 Error in the number assignment (Number range: Module &: &)  
63 056 Planned order only partially converted  
64 057 Planned order deleted  
65 058 Error reading forecast parameters for material & in plant & & Space: object requires documentation
66 059 Please carry out forecast for material & in plant &  
67 06 Error uploading &  
68 060 The date & is not convertible (please correct)  
69 061 & date lies before start of factory calendar. (Please correct)  
70 062 & date comes after end of valid factory calendar. (Please correct)  
71 063 Invalid factory calendar or error in the factory calendar &  
72 064 & is not a workday and was changed to &  
73 065 Exception message text maintained  
74 066 %NEM=&: & & &  
75 067 & field does not exist  
76 068 Specify field names  
77 069 Specify table name  
78 07 File & cannot be opened  
79 070 Please enter table names and field names  
80 071 Object & not contained in Table T440A  
81 072 Generation carried out  
82 073 Period split & does not exist  
83 074 Language & does not exist  
84 075 Table is new. Place cursor on the message and press F1  
85 076 No messages exist  
86 077 The MRP type & is invalid  
87 078 The material & has been marked for the MRP run  
88 079 Invalid input combination  
89 08 Data transferred from archive  
90 080 Material &1 &2. Status &3 does not allow long-term planning Space: object requires documentation
91 081 No additional information exists  
92 082 Parameter ID not maintained in PARA table  
93 083 Please enter the field name as well  
94 084 Please maintain table &  
95 085 No elements exist for the selection  
96 086 The planning run was terminated by the user  
97 087 The MRP list for material & & & was deleted Space: object requires documentation
98 088 No MRP list exists  
99 089 No more MRP lists were selected  
100 09 Archive storage not supported for document type &  
101 090 Select end of block  
102 091 No planned orders were selected  
103 092 Please specify at least one restriction  
104 093 Enter an object  
105 094 No changes were carried out  
106 095 Enter an object  
107 096 The object must be at least 4 characters long  
108 097 Invalid item category  
109 098 Maximum no. of order proposals per deadline exceeded  
110 099 -&- materials processed  
111 10 Make entry in field  
112 100 From-date is later than to-date  
113 101 Please choose a material  
114 102 Please select a material  
115 103 List is being printed  
116 104 MRP controller & does not exist for plant &  
117 105 Please maintain a text in the logon language  
118 106 & material(s) was/were selected  
119 107 & materials were selected  
120 108 Material not maintained by accounting department  
121 109 Please select clearly  
122 11 No allocations found  
123 110 Selection is contradictory  
124 111 Selected function cannot be used for the element  
125 112 Please select a valid line  
126 113 The previous workday is the &  
127 114 No exception message(s) exists for this element  
128 115 Select the end of the block  
129 116 The forecast period could not be determined  
130 117 The selected element cannot be changed Space: object requires documentation
131 118 Please maintain version in Table T009  
132 119 Maintain periods in Table T009B  
133 12 No screen source maintained for object &  
134 120 Planned order & is blocked by user &2 Space: object requires documentation
135 121 Enter either a material or an MRP controller  
136 122 Planned order has already been deleted or converted  
137 123 Error determining planning periods for calendar &  
138 124 In-house production time calculated &1 is too long  
139 125 Material & & is to be procured externally Space: object requires documentation
140 126 Material & & cannot be produced in-house  
141 127 The material & is defined for in-house production Space: object requires documentation
142 128 Material & & cannot be procured externally  
143 129 Please enter a date in the future  
144 13 Previous status not found  
145 130 Material &1 &2. Status &3 does not allow the planning run  
146 131 Please check the selection parameters  
147 132 Material &1 &2 is blocked for single-item planning by user &3 Space: object requires documentation
148 133 Purchase requisition & & is blocked  
149 134 The planning run for plant & has already been started  
150 135 Please select an issue or a receipt field with the cursor  
151 136 No blocking entry exists for plant &  
152 137 The blocking entry for plant & was deleted  
153 138 Plant & has not been maintained  
154 139 Requirements planning is not active in plant &  
155 14 Invalid entry  
156 140 No planning file entry exists for this selection  
157 141 Material cannot be processed with this transaction  
158 142 Finish date of a procurement proposal outside the factory calendar Space: object requires documentation
159 143 Account assignment category & invalid  
160 144 Purchase requisition has not yet been released  
161 145 An account assignment is not allowed  
162 146 Quota arrangement has been changed  
163 147 Explosion data has changed, please re-explode Space: object requires documentation
164 148 Scheduling error: &  
165 149 No requirements type found  
166 15 Enter value for version number increment (VersNumIncr.)  
167 150 Sales order/item does not exist  
168 151 Document is not a sales order  
169 152 Sales order was rejected  
170 153 Sales order has already been delivered  
171 154 Invalid entry  
172 155 Sales order does not allow make-to-order production  
173 156 Incorrect inventory management in the sales order (&1)  
174 157 Incorrect settlement in the sales order (&1)  
175 158 Project number was deleted  
176 159 Print order was created  
177 16 No entries found for status log  
178 160 No list found. Please use alternative selection parameters  
179 161 Please select only one output type  
180 162 Please enter a valid period indicator  
181 163 Please enter a fiscal year variant for period indicator &  
182 164 Please enter a period split for period indicator &  
183 165 Please enter a PP planning calendar for period indicator &  
184 166 Fiscal year variant & does not exist  
185 167 Period split & does not exist  
186 168 Fiscal year variant only makes sence for period totals with period &  
187 169 Planning calendar only makes sence for period totals with period &  
188 17 New version created  
189 170 Period split only makes sence for period totals with period &  
190 171 Graphic profile & & & is not correctly maintained  
191 172 Invalid date  
192 173 Selection of planned orders was interrupted after & hits  
193 174 Period indicator only makes sense for period totals display Space: object requires documentation
194 175 Conversion of unit of measure &1 to unit of measure &2 not possible  
195 176 Date lies outwith the period of examination  
196 177 No deleted components exist  
197 178 Distribution function & does not exist in plant &  
198 179 Enter a material  
199 18 Original cannot be displayed on this terminal (& type &)  
200 180 You have not selected any material components  
201 181 Material component is a planned receipt  
202 182 The material is only available from & for materials planning  
203 183 Material requires configured sales order  
204 184 Sales order is different from planned sales order (& &)  
205 185 Account assignment type copied from the sales order  
206 186 Please enter a date that does not lie in the past  
207 187 Rounding profile does not exist  
208 188 The purchase requisition has been completely ordered  
209 189 Reservation has more than 9999 items  
210 19 Data for application & cannot be put in archive &  
211 190 The line item & not found in internal Table &  
212 191 Invalid line in internal Table &  
213 192 Material & in plant & is available for the requirement date  
214 193 On the &, only & & available  
215 194 Material is never available  
216 195 Entered value not allowed  
217 196 No planned orders exist for the selection criteria  
218 197 Error & does not exist  
219 198 Special procurement & for plant & is not valid  
220 199 Week is invalid  
221 20 Document has SAP objects assigned  
222 200 SQL error: Error in READ (Table: & )  
223 201 SQL error: Error in the UPDATE (Table: & )  
224 202 SQL error: Error in the DELETE (Table: & )  
225 203 SQL error: Error in the SELECT (Table: & )  
226 204 SQL error: error during INSERT (table: &)  
227 205 MRP calculation only until the end of the short-term horizon  
228 206 No. of periods for the end of the short-term horizon set to 1 Space: object requires documentation
229 207 The validity of the short-term horizon ws not limited  
230 208 Short and long-term lot-size indicator not compatible  
231 209 Long-term planning is not active in plant &  
232 21 Start authorization for application & not set  
233 210 Planning calendar is blocked. Display only  
234 211 Sales order &1 &2 is blocked for single-item planning  
235 212 An order quantity of 0 is not allowed  
236 213 Material &1 &2 is blocked from planning with scenario &3  
237 214 Planning run for scenario &1 is plant &2 has already started  
238 215 Contract uses storage location &  
239 216 Stge loc. does not correspond to the stge loc. of the scheduling agmt  
240 217 No documents exist  
241 218 Materials to be discont.in parallel and follow-up mat.are deactivated  
242 219 Inserting is not possible in the discontinue/follow-up procedure  
243 22 Documents exist (indicator cannot be set)  
244 220 The sum of the usage probabilitites is &  
245 221 Material's assembly scrap is &  
246 222 Time interpr.only poss.when using period lot size with planning calendar  
247 223 Do not maintain time interpretation and scheduling together  
248 224 Multi-level discontinuation not supported Space: object requires documentation
249 225 Conversion between units of measure &1 / &2 for material &3 not possible  
250 226 Quantity overflow for component & in BOM explosion  
251 227 Error: non-stock component &1 with in-house production is recursive  
252 228 Please specify an account assignment type with consumption posting 'U'  
253 229 Material &1 &2. Status &3 allows no purchase order  
254 23 Entry with "*" not allowed  
255 230 Long-term lot size has not yet been completely maintained  
256 231 Material &1 in plant &2 is blocked for Purchasing Space: object requires documentation
257 232 Quantity overflow of material & in net requirements calculation Space: object requires documentation
258 233 Error during compression of internal table & Space: object requires documentation
259 234 Error during expanding of internal table & Space: object requires documentation
260 235 Internal table &1 is not in memory Space: object requires documentation
261 236 Transfer end &2 is before transfer start &1. Space: object requires documentation
262 237 Planning run executed: &1 materials, &2 with exceptions Space: object requires documentation
263 238 Order is not part of the BOM you are currently processing Space: object requires documentation
264 239 Purchase requisition can only be deleted by deleting the order. Space: object requires documentation
265 24 Not a valid SAP object  
266 240 Order quantity &1 &3 increased by &2 &3 scrap Space: object requires documentation
267 241 The scrap quantity was adjusted proportionally Space: object requires documentation
268 242 The order quantity may not be less than the GR quantity. Space: object requires documentation
269 243 Partially confirmed planned order &1 cannot be deleted Space: object requires documentation
270 244 Account assignment data is incomplete Space: object requires documentation
271 245 Invalid date &1 for element &2 &3 &4 Space: object requires documentation
272 246 Material is locked for purchasing Space: object requires documentation
273 247 No vendor (creditor) found for MRP element Space: object requires documentation
274 248 No customer (debitor) found for MRP element Space: object requires documentation
275 249 Material & does not exist in plant &, MRP area & Space: object requires documentation
276 25 Special characters & and & not allowed  
277 250 Error calculating the period of adjustment for demand management  
278 251 Purchase requisition &1 has not delivery date Space: object requires documentation
279 252 Deletion of & is only allowed in single-level BOM/structure representn Space: object requires documentation
280 253 You change only change & in single-level BOM/structure representation Space: object requires documentation
281 254 Storage location '&' for material '&' in MRP area '&' planned separately Space: object requires documentation
282 255 Error reading the BOM & &  
283 256 Invalid unit of measure for components & &  
284 257 Up to &, only & can be confirmed. Requested &  
285 258 Configured BOM could not be exploded  
286 259 Material requires configuration  
287 26 Indicator cannot be set/deleted not possible (documents exist)  
288 260 Project and/or WBS element not complete  
289 261 Project does not allow individual project production  
290 262 Project and/or WBS element does not exist  
291 263 Missing configuration in planned order &1 Space: object requires documentation
292 264 Missing configuration in sales requirement &1 Space: object requires documentation
293 265 You can maintain the components by exploding the BOM Space: object requires documentation
294 266 Total requirement & does not exist Space: object requires documentation
295 267 Project &1 is not an account assignment element Space: object requires documentation
296 268 Please check the selection parameters Space: object requires documentation
297 269 Column with rescheduling date shown Space: object requires documentation
298 27 New version copied from & & & &  
299 270 ***** COMMENT: Messages for missing table entries  
300 271 MRP controller '&1' for material '&2' does not exist  
301 272 Plant '&1' does not exist  
302 273 MRP parameters for plant '&1' have not been maintained  
303 274 No entry exists for plant &, material type & in V134M Space: object requires documentation
304 275 Material & does not exist Space: object requires documentation
305 276 Material status &1 does not exist for material &2  
306 277 Release indicator &1 not allowed for purchase requisition &2  
307 278 MRP type &1 not allowed for material &2  
308 279 Lot-sizing procedure &1 not allowed for material &2  
309 28 Error uploading &  
310 280 Range of coverage profile &1 does not exist  
311 281 No entries in Table &1 found  
312 282 &1 / &2 / &3 is an invalid combination or action code not allowed  
313 283 Unknown action code &1  
314 284 No entry for &1, &2, &3 in the list profiles  
315 285 No action code(s) copied  
316 286 No print data exists  
317 287 Splitting indicator &1 does not exist  
318 288 Exception message &1 or exception message text does not exist  
319 289 Special procurement key &1 not defined in plant &2  
320 29 Data transferred by SAP  
321 290 Text for MRP element &1 not maintained in language &2  
322 291 Action &2 executed for planned order &1  
323 292 Please enter action code  
324 293 Storage location &2 in plant &1 does not exist  
325 294 No entry exists for plant &1 in plant Table  
326 295 No entry exists for unit &1 in Table of units  
327 296 "Firm" and "Delete firm ind." set at the same time  
328 297 Combination "detete" and "print" not allowed  
329 298 Action &1 cannot be executed together with another action Space: object requires documentation
330 299 Action &1 requires the update within the module Space: object requires documentation
331 30 Error downloading &  
332 300 Components were deleted  
333 301 No components were deleted  
334 302 Storage location & does not exist  
335 303 & batch does not exist  
336 304 Storage location &1 not maintained for material &2 in plant &3  
337 305 The withdrawn quantity (partially) exceeds the requirement quantity  
338 306 No customer requirements exist for materials selected Space: object requires documentation
339 307 Unit of measure conversion for material &1 of &2 terminated in &3 Space: object requires documentation
340 308 Scope of planning '&1' does not exist. Space: object requires documentation
341 309 Planning run for scope of planning is only possible in parallel mode Space: object requires documentation
342 31 Document is marked for deletion  
343 310 The order was already checked according to ATP logic  
344 311 No planned independent requirements maintained for material  
345 312 Plant / MRP area does not exist in scope of planning Space: object requires documentation
346 313 Capacity has already been planned for the order  
347 314 Planning run with scope of planning. Delete scope of plng for plant plng Space: object requires documentation
348 315 Planning file (DBVM) is empty Space: object requires documentation
349 316 Selected scope of planning &1 is empty Space: object requires documentation
350 317 Selected scope of planning &1 is empty. Please fill or delete Space: object requires documentation
351 318 Component &1 cannot be deleted Space: object requires documentation
352 319 Two quantity columns inserted in unit of measure & Space: object requires documentation
353 32 No search criteria were entered: timeout !  
354 320 Plg calendar n.maintained far enough into future or per.of entry too smll  
355 321 Period profile &1 is not allowed to be used for plant &2 Space: object requires documentation
356 322 Planned order &1 may not be changed Space: object requires documentation
357 323 Schedule records are being deleted Space: object requires documentation
358 324 Columns with vendor data shown Space: object requires documentation
359 325 Columns with customer data inserted Space: object requires documentation
360 326 Pegged order & does not exist Space: object requires documentation
361 327 Navigation profile & does not exist Space: object requires documentation
362 328 Please maintain the account assignment data Space: object requires documentation
363 329 Date &1 for element &2 &3 &4 is not within the factory calendar Space: object requires documentation
364 33 Function & is not active  
365 330 Manual firming date &1 set Space: object requires documentation
366 331 Manual firming date &1 deleted Space: object requires documentation
367 332 Action &1 is not possible for simulative planned orders Space: object requires documentation
368 333 Quantity overflow when saving schedule lines for material & Space: object requires documentation
369 334 Quantity overflow when importing MRP elements for material & Space: object requires documentation
370 335 BOM is not valid: &1, &2, &3, &4 Space: object requires documentation
371 336 Several main parts in discontinuation group &1 Space: object requires documentation
372 337 Sales order planning/project planning not possible for material &1 &2 Space: object requires documentation
373 338 Single item planning in simultation mode not possible for material &1 &2 Space: object requires documentation
374 339 Time stamp problem: Changes to planned order '&1' terminated Space: object requires documentation
375 34 Revision levels already exist for & / & / &  
376 340 ******* COMMENT: 340- BOM explosion number checks  
377 341 BOM explosion number & is not active  
378 342 BOM explosion number & is only valid in plant &  
379 343 BOM explosion number & is only valid for material & in plant &  
380 347 ****COMMENT: 348-379 Messages for BOM explosion number maintenance  
381 348 You do not have the nec.authorization for maintaining BOM explosion nos.  
382 349 You do not have the necessary authorization for displaying BOM expl.nos.  
383 35 There is no access path from your front end to data carrier &  
384 350 Please select at least one BOM explosion number  
385 351 No BOM explosion numbers exist in the selected area  
386 352 BOM explosion number & is blocked by another user  
387 353 Error blocking BOM explosion number &  
388 354 Error unblocking BOM explosion number &  
389 355 Error deleting BOM explosion number &  
390 356 BOM explosion number & has been deleted by another user  
391 357 BOM explosion number & has been changed by another user  
392 358 Error reading BOM explosion number &  
393 359 Error saving BOM explosion number &  
394 36 File & could not be accessed  
395 360 BOM explosion number & already exists  
396 361 Please enter a BOM explosion number  
397 362 & BOM explosion number(s) was(were) saved  
398 363 Please enter a fixed key date  
399 364 Fixed key date in the past  
400 365 No BOM explosion numbers were changed  
401 366 Error deleting BOM explosion number &  
402 367 BOM explosion number & has been flagged for deletion Space: object requires documentation
403 368 & BOM explosion numbers were retrieved  
404 369 BOM explosion number & cannot be recovered  
405 37 Document was created from scratch  
406 370 & BOM explosion number(s) was(were) recovered  
407 371 Please select only one item  
408 372 Error saving new key assignment & -> &  
409 373 & new key assignment(s) was(were) saved  
410 374 Error unblocking new key assignment & -> &  
411 375 BOM explosion number & is not active  
412 376 New key assignment is blocked by another user  
413 377 Error blocking new key assignment  
414 378 & new key assignment(s) was(were) deleted  
415 379 New key assignment for BOM explosion number & blocked. Display only  
416 38 Object & & is already locked  
417 380 ****** COMMENT: 380-382 messages for order profile - F4  
418 381 Please maintain Table T460B  
419 382 Please maintain the order profile  
420 383 BOM selection not maintained  
421 39 Document & exists -> link status 1 changed to 2  
422 390 ****COMMENT: further messages for BOM explosion number maintenance  
423 391 Select a line  
424 392 A new key assignment exists for this entry already  
425 40 No vault available  
426 400 No authorization for & in plant & and MRP controller &  
427 401 No authorization for & in plant &  
428 402 No authorization for &  
429 403 Material & in plant & has been marked for deletion  
430 404 The MRP element no longer exists  
431 405 No authorization for & and planning scenario & in plant &  
432 406 No authorization for &1 and planning scenario &2  
433 41 File archived in vault &  
434 410 Incomplete transfer of parameters in index maintenance RSDB  
435 411 RSDB record already exists  
436 412 No RSDB record exists  
437 413 Field exceeded in RSDB index counter table Space: object requires documentation
438 415 Run schedule header cannot be calculated Space: object requires documentation
439 416 Error during creation of a run schedule header Space: object requires documentation
440 417 ****** COMMENT: 417-433 Allocate projects  
441 418 & allocation(s) was/were saved  
442 419 & allocation(s) was/were deleted  
443 42 Document not archived: audit function not possible  
444 420 An allocation already exists for this entry  
445 421 Error saving the new allocation for plant & and material &  
446 422 Error unblocking the sales order item & &  
447 423 Error reading the WBS element &  
448 424 Sales order item & & is blocked  
449 425 Error blocking the sales order item & &  
450 426 No entries have been selected  
451 427 Please enter a WBS element  
452 428 No posting to projects is allowed for item & &  
453 429 Material & allows no make-to-order stock  
454 43 No audit original could be displayed for this log entry  
455 430 Item & & allows no make-to-order stock  
456 431 No items exist for the sales order &  
457 432 Specify an item  
458 433 Please enter a sales order first  
459 434 Daily split carried out  
460 435 Production line does not exist  
461 436 Please place the cursor on a line with run schedule data  
462 437 No planned order was selected for assignment  
463 438 Invalid cursor position for executing selected function  
464 439 Selected material does not appear in any product group  
465 44 Document & inserted  
466 440 Error changing the cost collector  
467 441 Error creating cost collector  
468 442 Order type not in Table &  
469 443 Error creating cost collector  
470 444 Run schedule & with cost collector & will be created  
471 445 Data may not be up-to-date -> renew  
472 446 Reducing the quantity during assignment is not permitted  
473 447 Distribution function & is incorrect in plant &  
474 448 Planning ID & was not entered  
475 449 Enter MRP controller Space: object requires documentation
476 45 SAP archiving for document type & maximum & bytes: file has & bytes  
477 450 Enter either the material or the run schedule number  
478 451 Dummy message & for & in plant & and MRP controller &  
479 452 Not possible to branch into details  
480 453 Enter plant  
481 454 Run schedule header & will be created  
482 455 Run schedule header & does not exist  
483 456 Run schedule header & exists already  
484 457 Run schedule header & will be changed  
485 458 Run schedule header & will be deleted  
486 459 Please select planning object  
487 46 Environment variable 'HOSTNAME' not maintained for your PC  
488 460 Entered line or column greater than maximum value  
489 461 No run schedule header exists for material & &  
490 462 No run schedule header exists for material & & version &  
491 463 Select field  
492 464 In period & the total quantity is short of &  
493 465 In period & the total quantity is exceeded by &  
494 466 Repetitive mfg not allowed for material & &  
495 467 Version for material either does not exist or is blocked  
496 468 Validity period end is smaller than validity period start  
497 469 Validity period end lies after version validity date &  
498 47 Programm & cannot be accessed  
499 470 Validity period start lies brfore version validity date &  
500 471 Enter version  
501 472 RS header & already exists in the schedule run time  
502 473 No run schedule header exists for this selection  
503 474 Not possible to convert to production order Space: object requires documentation
504 475 Incorrect run schedule header & in planned/production order &  
505 476 Entry & & & missing in T437Z  
506 477 No version entered, sel. ind will be deleted  
507 478 No valid run schedule header exists in this time  
508 479 No assignment possible  
509 48 Please select only one  
510 480 & planned orders cannot be specifically assigned  
511 481 Please enter plnning calendar for freely definable plnng period selection  
512 482 Please select planning period  
513 483 Entry & missing in Table &  
514 484 Assignment not possible. No active version exists for the planning date  
515 485 No element in column & can be confirmed  
516 486 No planned data exists for material &, plant &  
517 487 No planning calendar can be selected  
518 488 Please select only one period split  
519 489 Please select at least one output object  
520 49 Document & does not exist  
521 490 No valid calendar ID was entered  
522 491 No element in column & can be assigned  
523 492 Final delivery has already been made for partial order &  
524 493 No released production order was selected  
525 494 No open reservations exist for production order &  
526 495 Production order & has already been finally confirmed  
527 496 Conversion factor to unit of measure & for material & not maintained  
528 497 Run schedule header & is blocked  
529 498 Run sched. hdr &1 cannot be deleted because run sched. qty still exists Space: object requires documentation
530 499 Entered version does not appear in the planning table  
531 50 Maintain document type & as data carrier  
532 500 Object & does not exist  
533 501 Number range & for object & does not exist  
534 502 Entered version already exists  
535 503 Enter a version  
536 504 Enter a run schedule header with partial orders  
537 505 No capactiy planning active  
538 506 Assignments were saved  
539 507 Changes were made to master plan  
540 508 Delete not possible: RH header's cost collector has no deletion indicator  
541 509 Please enter a material  
542 51 Status in engineering change mgmt cannot be set as "finished"  
543 510 Invalid object type  
544 511 Number range & for object & not planned for internal allocation  
545 512 Number range not planned for external allocation  
546 513 Number range &1 for object &2 nearly exhausted  
547 514 Number range & for object &2 exhausted  
548 515 Number & does not lie within the provided interval  
549 516 No documentation exists  
550 517 Please maintain repetitive mfg profile in the material master record  
551 518 Entered product group does not exist  
552 519 No costing data exists  
553 52 Document is used &  
554 520 Deletion ind. cannot be set; validity per. of RS header extends in future Space: object requires documentation
555 521 Deletion indicator will be set; it cannot be reset Space: object requires documentation
556 522 Please check your entries  
557 523 Please enter valid hierarchy  
558 524 & RS created, & RS changed, & create version, & change version terminated  
559 525 RS header for material &, version & not created. Reason:  
560 526 Not possible to go to line set as you did not access via line set  
561 527 No pegged requirements exist  
562 528 Please enter either RS header or material, version and selection date  
563 529 Runtime of RS header cannot be shortened as much  
564 53 Copy of archive link could not be produced in &  
565 530 Procurement type/special procurement type only available as from 2.0  
566 531 Please enter either the production or the stock transfer plant  
567 532 The production/stock transfer plant corresponds to the ordering plant  
568 533 Special procurement type & not defined  
569 534 Lot-size indicator for lot-sizing procedure & invalid  
570 535 Invalid entry  
571 536 Plant entry unnecessary for procurement type "&", special proc. "&"  
572 537 Please enter the period length (number of days)  
573 538 Period length was cancelled  
574 539 Please complete table entry  
575 54 Data carrier & already exists  
576 540 Please maintain the range of coverage period  
577 541 Backflush not possible as not a milestone operation  
578 542 No capacity data can be displayed  
579 543 The dates are displayed in ascending order  
580 544 Production line not available in the planning table  
581 545 Production line and version are not compatible  
582 546 Requirements quantity cannot be split  
583 547 Please maintain the distribution function  
584 548 The latest reqmts date must lie between the reqmts date and the plnnd end  
585 549 Distribution does not exist  
586 55 Maintain document type & as frontend  
587 550 Dependent components will be deleted  
588 551 Unit of measure & in & cannot be converted  
589 552 No long text exists for component &  
590 553 No text exists for item &  
591 554 Please check the material components  
592 555 BOM alternative & is not allowed for application &  
593 556 Planning calendar & does not exist  
594 557 Please remove error first  
595 558 Attention recursiveness. Material & is the same as the order material  
596 559 Planning calendar & exists already  
597 56 Revision level maintenance not active in system  
598 560 Planning calendar & does not exist. You can create it if you want  
599 561 Planning calendar & will be saved  
600 562 Please select a phantom assembly  
601 563 Withdrawal quantity greater than the requirements quantity  
602 564 Availability check only possible for item kept in stock  
603 565 Selection parameters were saved  
604 566 Selection parameters were deleted  
605 567 Version & does not exist for material & in plant &  
606 568 Version & invalid for material & in plant &  
607 569 No run schedule could be determined for version &  
608 57 Valid-from date is after valid-to date  
609 570 Select a procurement proposal Space: object requires documentation
610 571 BOM explosion number & does not exist  
611 572 BOM explosion number & is not allowed for material & in plant &  
612 573 Procurement proposal was copied Space: object requires documentation
613 574 The procurement proposal was not changed Space: object requires documentation
614 575 Components repeat is switched on  
615 576 Components repeat is switched off  
616 577 Direct procurement has not yet been initiated  
617 578 No purchase orders exist as yet  
618 579 %N&  
619 58 Additional file cannot be accessed &  
620 580 The planned order has not yet been scheduled. Please reschedule  
621 581 No scheduling log exists  
622 582 Outline agreement & & does not exist  
623 583 Outline agreement & & is not allowed  
624 584 Outline agreement & & was deleted  
625 585 Please enter order/purchase requisition key  
626 586 Please select a variable-sized item  
627 587 The unit of entry is set equal to the unit of issue  
628 588 Check the settings for checking group & and checking rule &  
629 589 Planned orders selected were firmed  
630 590 No number range has been entered for sim. dep.reqmts for plant &  
631 591 Partial order cannot be released  
632 592 Lot size area for version: from & to &  
633 593 No scheduling allowed  
634 594 Capacitites checked. No overload found.  
635 595 Assembly orders, changes are transferred to sales order  
636 596 Availability check without storage location was activated  
637 597 Avail.check w/o storage locations can lead to inconsistencies  
638 598 The selected planned orders were changed  
639 599 The selected planned orders will be "unfirmed"  
640 5A0 *****************************************************  
641 5A1 * error messages in table maintenance *  
642 5A2 *****************************************************  
643 600 *** COMMENT: Messages for SAPMM61C / Transaction OPPQ  
644 601 Plant & does not exist  
645 602 No plant parameters are maintained for plant &  
646 603 Plant parameters for plant & were deleted  
647 604 Parameters from plant & were copied to plant &  
648 605 Plant parameters for plant & can now be maintained  
649 606 Error reading the parameters for plant &  
650 607 Error during modification of Table &  
651 608 Error blocking table &  
652 609 Plant parameters are blocked by another user  
653 610 Parameters already exist for plant &  
654 611 Create parameters for plant & first  
655 612 You do not have required authorization to maintain parameters in Tab. &  
656 613 Parameters for plant & were partially copied to plant &  
657 614 Parameters for plant & were partially delete  
658 615 Specify a plant  
659 616 Parameters for plant & were entered in correction &  
660 617 Entry is not allowed  
661 618 Calculation rule not maintained correctly  
662 619 Please specity valid vendor  
663 620 *** COMMENT: Messages for SAPMM61C / Transaction OPPR  
664 621 MRP group & & does not exist  
665 622 MRP group & & was deleted  
666 623 MRP group & & was copied to & &  
667 624 MRP group & & can now be maintained  
668 625 Error reading MRP group & &  
669 626 Error modifying MRP group & &  
670 627 Error blocking MRP group (Table T438M)  
671 628 MRP groups are blocked by another user  
672 629 MRP group & & already exists  
673 630 Please create an MRP group first  
674 631 You do not have the necessary authorization to maintain MRP groups  
675 632 MRP group & & was entered in correction &  
676 633 Please enter an MRP group  
677 634 MRP group text was not changed  
678 635 MRP group text was saved  
679 636 Creation of outline agreement requisitions in MRP not allowed Space: object requires documentation
680 637 List for the detailed search does not exist Space: object requires documentation
681 638 No elements exist for search  
682 639 No further elements were selected for search  
683 640 The order type does not exist  
684 641 The ord.type refers to internal or external no.ranges. Check ord.no.entry  
685 642 There are still quantities on the line for order &1 Space: object requires documentation
686 643 The variance key does not exist  
687 644 The controlling area does not exist  
688 645 The cost element does not exist  
689 646 The order type has not been allocated a number range  
690 647 Error in number management (please notify the responsible person)  
691 648 Production version &1 for material &2 in plant &3 is locked Space: object requires documentation
692 649 Overhead key could not be determined (check costin variant)  
693 650 No data exists Space: object requires documentation
694 651 Only enter proportion unit Space: object requires documentation
695 652 Only enter product unit Space: object requires documentation
696 653 No receiver defined in Customizing for MRP controller Space: object requires documentation
697 654 Splitting quota not allowed  
698 655 Processing indicator was set Space: object requires documentation
699 656 Processing indicator reset Space: object requires documentation
700 657 Error in reading consumption values Space: object requires documentation
701 658 & is not a proportion unit Space: object requires documentation
702 659 & is not a product unit Space: object requires documentation
703 660 No order type can be determined automatically  
704 661 Purchase requisition no longer exists  
705 662 Enter a unit of measure Space: object requires documentation
706 663 Enter plant or MRP area Space: object requires documentation
707 664 Enter a plant Space: object requires documentation
708 665 Enter an MRP area Space: object requires documentation
709 666 At the most, today's date allowed. The & lies in the future.  
710 667 Enter today's or a future date Space: object requires documentation
711 668 Settings for user & saved Space: object requires documentation
712 669 The settings for user & have been reset to the default settings Space: object requires documentation
713 670 No exception messages are contained in the list  
714 671 The MRP list was already processed on the &  
715 672 When searching using exceptions, select at least one exception  
716 673 When searching using MRP element, select at least one MRP element  
717 674 Please select at least one material Space: object requires documentation
718 675 No message exists for material & in plant &  
719 676 Document type not created Space: object requires documentation
720 677 Please enter an MRP controller  
721 678 Enter MRP controller, product group, line or planning ID Space: object requires documentation
722 680 & & is a product group Space: object requires documentation
723 681 & & is not a product group  
724 682 Enter product group Space: object requires documentation
725 683 Selection by material: enter a material Space: object requires documentation
726 684 Conversion of planning file entries: test (T), processing (X) Space: object requires documentation
727 685 Conversion of planning file entries has already been carried out Space: object requires documentation
728 686 Planning file entries for MRP areas are not converted Space: object requires documentation
729 687 Control parameters for MRP areas do not exist Space: object requires documentation
730 688 MRP areas are active. It is not possible to delete planning file entries Space: object requires documentation
731 689 MRP areas are not defined for SAP Retail systems Space: object requires documentation
732 690 Class & does not exist for class type &  
733 691 Class type & not allowed  
734 692 Please enter class and class type  
735 693 Please enter valid production line  
736 694 If necessary, limit the selection further  
737 695 Please enter the selection criteria  
738 696 No authorization for activation of MRP areas Space: object requires documentation
739 700 ***** COMMENT: Pegged orders PlOrd: No direct calls -> LTP Space: object requires documentation
740 701 There is no pegged requirement for planned order &1 Space: object requires documentation
741 702 Pegged requirement for planned order &1 does not contain an order number Space: object requires documentation
742 703 Pegged requirement for planned order &1 does not contain an order number Space: object requires documentation
743 704 Pegged planned order for requirements &1 / &2 does not exist Space: object requires documentation
744 710 Planned order &1 cannot be deleted. Goods receipt quantity greater than 0 Space: object requires documentation
745 711 Order tree for the first procurement element &1 &2 is displayed Space: object requires documentation
746 712 Order report will be displayed Space: object requires documentation
747 713 The order report will be displayed with a maximum of &1 hierarchies Space: object requires documentation
748 720 ***** COMMENT: distribution function: messages  
749 721 Distribution key - initial  
750 722 Distribution key not maintained in Table &  
751 729 Issuing storage location only possible for stock transfer Space: object requires documentation
752 730 ***** COMMENT: Tree Control: Message Space: object requires documentation
753 731 Error in function module &1 Space: object requires documentation
754 732 Grouping without priority is not allowed for &1 Space: object requires documentation
755 733 Grouping for &1 reset Space: object requires documentation
756 734 The requested hierarchy levels are already being displayed The short text describes the object sufficiently
757 735 No additional hierarchy levels can be displayed for the element The short text describes the object sufficiently
758 736 Threshold values not maintained correctly Space: object requires documentation
759 737 'Multilevel Delay' indicator not set in profile &1 The short text describes the object sufficiently
760 738 Multilevel delay will be calculated for all sales orders in system The short text describes the object sufficiently
761 739 Sales order item &1 &2 is not MRP-relevant The short text describes the object sufficiently
762 740 Firmed components of the planned order are copied Space: object requires documentation
763 741 Multilevel delay calculated for &1 sales orders The short text describes the object sufficiently
764 742 &1 entries deleted from database table &2 The short text describes the object sufficiently
765 750 * Comment; messages for availability check  
766 751 The committment is only possible for the amount of the ATP qty &  
767 752 Changes were copied  
768 753 No changes were made  
769 754 The total committed quantity is greater than the order quantity  
770 755 Please select a line that can be changed  
771 756 Data on updating backorders was saved  
772 757 Please check the controlling of updating backorders  
773 758 You have no authorization for updating backorders in plant &  
774 759 You have no authorization for making changes in plant &  
775 760 Material & is already being processed in plant &  
776 761 Reqmts switched from collective to individual reqmts  
777 762 Reqmts switched from individual to collective reqmts  
778 763 No coverage by the master plan for this date  
779 764 Order date lies after the confirmation date  
780 765 Receipts in the past were included  
781 766 Receipts in the past were not included  
782 767 There are no components for the availability check in order & Space: object requires documentation
783 768 The system could not determine a storage location  
784 769 Order & was not deleted. Confirm with ENTER first Space: object requires documentation
785 770 Inconsistencies when creating/modifying the procurement elements  
786 771 Receipt quantity greater than requirement quantity  
787 772 Configuration change not copied to all production orders  
788 773 Document with credit limit block!  
789 774 Document with reqmt-specific delivery block! No changes possible  
790 775 Document with reqmt-specific credit limit block! No changes possible  
791 776 Order &1:Configuration change not completely executed Space: object requires documentation
792 780 *** Messages for printing the component list (SAPLM61L)  
793 781 Error determining the material components  
794 790 Internal configuration error  
795 791 Only &2 decimal places are defined for unit of measure &1 Space: object requires documentation
796 792 Object dependency too complicated. BOM: &1-Valid from: &2-Item: &3 Space: object requires documentation
797 800 **** COMMENT: Messages from check modules in customizing  
798 801 Please enter a period split  
799 802 Please enter a planning calendar  
800 803 Target range of coverage is smaller that the minimum range of coverage  
801 804 Target range of coverate is greater than the minimum range of coverage  
802 805 Order type & is not provided for the order group &  
803 806 Entry & & does not exist  
804 807 Make entries in all required entry fields ('*' allowed)  
805 808 Selection ID & does not exist  
806 809 For production rate planning, a simplified routing should be used  
807 810 The indicator "Create capacity requirements" was set  
808 811 Do not set the rounding value smaller than the threshold value  
809 812 Please set threshhold value increasing monotonically  
810 813 Please set the rounding value increasing monotonically  
811 814 Please enter an item number  
812 815 Destination &1 not active Space: object requires documentation
813 816 Maintain selection ID in the scheduling parameters Space: object requires documentation
814 817 Enter at least the target or the maximum range of coverage  
815 818 Enter withdrawal plant Space: object requires documentation
816 819 Withdrawal plant and production plant must be different Space: object requires documentation
817 820 Plant input only necessary for withdrawal from alternative plant Space: object requires documentation
818 821 Direct production is only possible with in in-house production Space: object requires documentation
819 822 Combination not possible Space: object requires documentation
820 823 Plants &1 and &2 are assigned to different company codes Space: object requires documentation
821 824 Plants &1 and &2 are assigned to different controlling areas Space: object requires documentation
822 827 This item has already been entered Space: object requires documentation
823 828 Counter number is zero or incorrect sequence Space: object requires documentation
824 829 Entry or a plant which belongs to an MRP area already exists Space: object requires documentation
825 832 No total reqs exist for material &1, plant &2, production version &3 Space: object requires documentation
826 833 Select at least one material for the comparison Space: object requires documentation
827 834 No additional individual requirements exist for total requirement &1 Space: object requires documentation
828 835 No total requirements exist for material &1, plant &2 Space: object requires documentation
829 836 "To-date" must not precede the "From-date" Space: object requires documentation
830 837 Overlapping of periods is not permitted: Periods from &1 to &2 Space: object requires documentation
831 838 Date-from and date-to must be entered Space: object requires documentation
832 839 No firming type for reorder point or time-phased material planning Space: object requires documentation
833 840 There is no icon called &1 Space: object requires documentation
834 842 Error occurred in method &1 The short text describes the object sufficiently
835 843 Special procurement type &1 not allowed in multilevel subcontracting The short text describes the object sufficiently
836 850 COMMENT*****: Messages for comparison of the MRP lists  
837 851 No MRP lists exist  
838 853 *** Comment; Messages for repetitive planning table III Space: object requires documentation
839 854 'Adjust scheduling' level incorrect: &1 / &2 / &3 Space: object requires documentation
840 860 Data is incomplete; check your entries The short text describes the object sufficiently
841 870 Table RESB contains no fields with 'NOT ZERO' but without default  
842 871 Field definitions for table RESB were changed  
843 872 Table RESB is inconsistent  
844 873 DB definition and SAP DDIC definition are not the same  
845 874 No NAMETAB exists for table RESB in the SAP DDIC  
846 880 ****COMMENT: Messages for calendar - F4 (SAPLDATD, FuBau F4 DATE)  
847 881 No capacity requirements exist  
848 882 The month &/& lies outwith the factor calendar  
849 883 Error reading the factira calendar  
850 884 Date lies outwith the factory calendar  
851 885 The format of the date in invalid  
852 886 Factory calendar & was not found  
853 887 Date & lies in the past  
854 888 General error. Please inform SAP  
855 890 ****COMMENT: Messages for BAPI and CIF (planned order) Space: object requires documentation
856 891 Planned order & version & does not exist Space: object requires documentation
857 892 Planned order & version & is not valid on finish date & Space: object requires documentation
858 895 No errors were found The short text describes the object sufficiently
859 896 Error occurred in method &1 The short text describes the object sufficiently
860 897 Warning! This function is only available as from Release 2.0  
861 898 System locking error  
862 899 %N& &  
863 900 ****COMMENT: Messages for Business Object BUS2004 (planned order) Space: object requires documentation
864 901 Reading planned order &1 Space: object requires documentation
865 902 Error occurred when maintaining planned orders  
866 903 Internal error when accessing CY01_PLANNED_ORDERS_INTERFACE The short text describes the object sufficiently
867 904 No load exists for the entered work center  
868 905 No work centers were found with capacity requirements  
869 906 Capacity planning was terminated  
870 907 Error in internal table: planned order & does not exist  
871 908 Error in internal table: production order & does not exist  
872 909 Program error: internal table & is inconsistent  
873 910 Error in internal table: work center & does not exist  
874 911 Error in internal table: capacity & does not exist  
875 912 Error in internal table: capacity requirement & does not exist  
876 913 No planned order has been selected  
877 914 Error in internal table: SOP order with index & does not exist  
878 915 Please place cursor on valid column  
879 916 The scrap quantity was adjusted proportionally  
880 917 Order start date and opening date were adjusted  
881 918 No scheduling log exists  
882 919 Scheduling data can only be displayed for planned orders  
883 920 Please place the cursor on a planned order number  
884 921 Please select a valid field  
885 950 No errors were found The short text describes the object sufficiently
886 990 *****COMMENT: Messages for XPRA'S  
887 991 Table KBKO successfully created from & PLAF records  
888 992 Run time: & ms  
889 9A0 *****************************************************  
890 9A1 * Error messages in the number range processing *  
891 9A2 *****************************************************  
History
Last changed on/by 20131127  SAP 
SAP Release Created in