SAP ABAP Message Class 61 (Error Messages for MRP)
Basic Data
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-MRP-BD (Application Component) Master Data
⤷
MD0C (Package) Customizing R/3 Material Requirements Planning
⤷
⤷
Attributes
| Message class | 61 | |
| Short Description | Error Messages for MRP | |
| Changed On | 20131127 | |
| Last Changed At | 174350 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | Archive function error | |||
| 2 | General program error. Please notify SAP development | |||
| 3 | Argument & not in Table & | |||
| 4 | Planned order & already exists | |||
| 5 | Planned order & does not exist | |||
| 6 | Material & does not exist in plant & | |||
| 7 | The scrap quantity must be smaller than the order quantity | |||
| 8 | Please enter completion date and/or start date | |||
| 9 | The processing of customer data is not allowed here | |||
| 10 | Material &1 &2 &3 is not planned automatically | Space: object requires documentation | ||
| 11 | Please specify the order deadlines in ascending order | |||
| 12 | Kernel function error | |||
| 13 | Planned order & will be created | |||
| 14 | Planned order & will be changed | |||
| 15 | Planned order & will be deleted | |||
| 16 | Sales order data was cancelled | |||
| 17 | Sales order data does not exist | |||
| 18 | Dates incorrect (start date > finish date) | |||
| 19 | You have made no changes | |||
| 20 | Please check the firming indicator | The short text describes the object sufficiently | ||
| 21 | Invalid procurement type | |||
| 22 | Special procurement type & is not allowed with procurement type & | |||
| 23 | Error in communication table | |||
| 24 | No scheduling information exists | |||
| 25 | A requirement quantity of zero is not allowed | |||
| 26 | The requirements date lies after the planned finish date on time axis | |||
| 27 | A calculation of the number of partial lots is not possible | |||
| 28 | A calculation of the total quantity is not possible | |||
| 29 | Please enter partial lot quantity or number of partial lots | |||
| 30 | Please create the components | |||
| 31 | No material components were determined | |||
| 32 | Entry of material components is not allowed for this order type | |||
| 33 | Function code & not allowed | |||
| 34 | No entry in TCLO for object & | |||
| 35 | Planned order not defined for external procurement | |||
| 36 | Material data of component & & not maintained | |||
| 37 | Please enter release date or scheduled delivery date | |||
| 38 | Planned order & cannot be converted | |||
| 39 | Purchase requisition & & already exists | |||
| 40 | Please enter the delivering plant | |||
| 41 | The delivering plant is the same as the ordering plant. Please correct | |||
| 42 | Supplying plant & does not exist | |||
| 43 | Delivering plant was cancelled | |||
| 44 | Planned order & converted to purchase requisiton & & | |||
| 45 | Maintain abbreviation and description in menu option for document status | |||
| 46 | MRP controller &2 does not exist in plant &1 | |||
| 47 | No planned orders exist for selected criterion | |||
| 48 | Planned order already converted | |||
| 49 | Please select a planned order | |||
| 50 | & Planned orders converted into purchase requisitions | Space: object requires documentation | ||
| 51 | No planned orders were selected | |||
| 52 | Planned orders were converted | |||
| 53 | Change to a directly produced planned order - please note long text | Space: object requires documentation | ||
| 54 | No search help available. Use collective display for planned orders. | Space: object requires documentation | ||
| 55 | Planned order was converted - no reset is possible | |||
| 56 | Texts exist for status & -> you cannot delete | |||
| 57 | Invalid planning run type | |||
| 58 | Processing key & invalid for single-item planning | |||
| 59 | Please check input parameters | |||
| 60 | To start the planning run, press enter | |||
| 61 | MRP carried out for & & & | Space: object requires documentation | ||
| 62 | Error in the number assignment (Number range: Module &: &) | |||
| 63 | Planned order only partially converted | |||
| 64 | Planned order deleted | |||
| 65 | Error reading forecast parameters for material & in plant & & | Space: object requires documentation | ||
| 66 | Please carry out forecast for material & in plant & | |||
| 67 | Error uploading & | |||
| 68 | The date & is not convertible (please correct) | |||
| 69 | & date lies before start of factory calendar. (Please correct) | |||
| 70 | & date comes after end of valid factory calendar. (Please correct) | |||
| 71 | Invalid factory calendar or error in the factory calendar & | |||
| 72 | & is not a workday and was changed to & | |||
| 73 | Exception message text maintained | |||
| 74 | %NEM=&: & & & | |||
| 75 | & field does not exist | |||
| 76 | Specify field names | |||
| 77 | Specify table name | |||
| 78 | File & cannot be opened | |||
| 79 | Please enter table names and field names | |||
| 80 | Object & not contained in Table T440A | |||
| 81 | Generation carried out | |||
| 82 | Period split & does not exist | |||
| 83 | Language & does not exist | |||
| 84 | Table is new. Place cursor on the message and press F1 | |||
| 85 | No messages exist | |||
| 86 | The MRP type & is invalid | |||
| 87 | The material & has been marked for the MRP run | |||
| 88 | Invalid input combination | |||
| 89 | Data transferred from archive | |||
| 90 | Material &1 &2. Status &3 does not allow long-term planning | Space: object requires documentation | ||
| 91 | No additional information exists | |||
| 92 | Parameter ID not maintained in PARA table | |||
| 93 | Please enter the field name as well | |||
| 94 | Please maintain table & | |||
| 95 | No elements exist for the selection | |||
| 96 | The planning run was terminated by the user | |||
| 97 | The MRP list for material & & & was deleted | Space: object requires documentation | ||
| 98 | No MRP list exists | |||
| 99 | No more MRP lists were selected | |||
| 100 | Archive storage not supported for document type & | |||
| 101 | Select end of block | |||
| 102 | No planned orders were selected | |||
| 103 | Please specify at least one restriction | |||
| 104 | Enter an object | |||
| 105 | No changes were carried out | |||
| 106 | Enter an object | |||
| 107 | The object must be at least 4 characters long | |||
| 108 | Invalid item category | |||
| 109 | Maximum no. of order proposals per deadline exceeded | |||
| 110 | -&- materials processed | |||
| 111 | Make entry in field | |||
| 112 | From-date is later than to-date | |||
| 113 | Please choose a material | |||
| 114 | Please select a material | |||
| 115 | List is being printed | |||
| 116 | MRP controller & does not exist for plant & | |||
| 117 | Please maintain a text in the logon language | |||
| 118 | & material(s) was/were selected | |||
| 119 | & materials were selected | |||
| 120 | Material not maintained by accounting department | |||
| 121 | Please select clearly | |||
| 122 | No allocations found | |||
| 123 | Selection is contradictory | |||
| 124 | Selected function cannot be used for the element | |||
| 125 | Please select a valid line | |||
| 126 | The previous workday is the & | |||
| 127 | No exception message(s) exists for this element | |||
| 128 | Select the end of the block | |||
| 129 | The forecast period could not be determined | |||
| 130 | The selected element cannot be changed | Space: object requires documentation | ||
| 131 | Please maintain version in Table T009 | |||
| 132 | Maintain periods in Table T009B | |||
| 133 | No screen source maintained for object & | |||
| 134 | Planned order & is blocked by user &2 | Space: object requires documentation | ||
| 135 | Enter either a material or an MRP controller | |||
| 136 | Planned order has already been deleted or converted | |||
| 137 | Error determining planning periods for calendar & | |||
| 138 | In-house production time calculated &1 is too long | |||
| 139 | Material & & is to be procured externally | Space: object requires documentation | ||
| 140 | Material & & cannot be produced in-house | |||
| 141 | The material & is defined for in-house production | Space: object requires documentation | ||
| 142 | Material & & cannot be procured externally | |||
| 143 | Please enter a date in the future | |||
| 144 | Previous status not found | |||
| 145 | Material &1 &2. Status &3 does not allow the planning run | |||
| 146 | Please check the selection parameters | |||
| 147 | Material &1 &2 is blocked for single-item planning by user &3 | Space: object requires documentation | ||
| 148 | Purchase requisition & & is blocked | |||
| 149 | The planning run for plant & has already been started | |||
| 150 | Please select an issue or a receipt field with the cursor | |||
| 151 | No blocking entry exists for plant & | |||
| 152 | The blocking entry for plant & was deleted | |||
| 153 | Plant & has not been maintained | |||
| 154 | Requirements planning is not active in plant & | |||
| 155 | Invalid entry | |||
| 156 | No planning file entry exists for this selection | |||
| 157 | Material cannot be processed with this transaction | |||
| 158 | Finish date of a procurement proposal outside the factory calendar | Space: object requires documentation | ||
| 159 | Account assignment category & invalid | |||
| 160 | Purchase requisition has not yet been released | |||
| 161 | An account assignment is not allowed | |||
| 162 | Quota arrangement has been changed | |||
| 163 | Explosion data has changed, please re-explode | Space: object requires documentation | ||
| 164 | Scheduling error: & | |||
| 165 | No requirements type found | |||
| 166 | Enter value for version number increment (VersNumIncr.) | |||
| 167 | Sales order/item does not exist | |||
| 168 | Document is not a sales order | |||
| 169 | Sales order was rejected | |||
| 170 | Sales order has already been delivered | |||
| 171 | Invalid entry | |||
| 172 | Sales order does not allow make-to-order production | |||
| 173 | Incorrect inventory management in the sales order (&1) | |||
| 174 | Incorrect settlement in the sales order (&1) | |||
| 175 | Project number was deleted | |||
| 176 | Print order was created | |||
| 177 | No entries found for status log | |||
| 178 | No list found. Please use alternative selection parameters | |||
| 179 | Please select only one output type | |||
| 180 | Please enter a valid period indicator | |||
| 181 | Please enter a fiscal year variant for period indicator & | |||
| 182 | Please enter a period split for period indicator & | |||
| 183 | Please enter a PP planning calendar for period indicator & | |||
| 184 | Fiscal year variant & does not exist | |||
| 185 | Period split & does not exist | |||
| 186 | Fiscal year variant only makes sence for period totals with period & | |||
| 187 | Planning calendar only makes sence for period totals with period & | |||
| 188 | New version created | |||
| 189 | Period split only makes sence for period totals with period & | |||
| 190 | Graphic profile & & & is not correctly maintained | |||
| 191 | Invalid date | |||
| 192 | Selection of planned orders was interrupted after & hits | |||
| 193 | Period indicator only makes sense for period totals display | Space: object requires documentation | ||
| 194 | Conversion of unit of measure &1 to unit of measure &2 not possible | |||
| 195 | Date lies outwith the period of examination | |||
| 196 | No deleted components exist | |||
| 197 | Distribution function & does not exist in plant & | |||
| 198 | Enter a material | |||
| 199 | Original cannot be displayed on this terminal (& type &) | |||
| 200 | You have not selected any material components | |||
| 201 | Material component is a planned receipt | |||
| 202 | The material is only available from & for materials planning | |||
| 203 | Material requires configured sales order | |||
| 204 | Sales order is different from planned sales order (& &) | |||
| 205 | Account assignment type copied from the sales order | |||
| 206 | Please enter a date that does not lie in the past | |||
| 207 | Rounding profile does not exist | |||
| 208 | The purchase requisition has been completely ordered | |||
| 209 | Reservation has more than 9999 items | |||
| 210 | Data for application & cannot be put in archive & | |||
| 211 | The line item & not found in internal Table & | |||
| 212 | Invalid line in internal Table & | |||
| 213 | Material & in plant & is available for the requirement date | |||
| 214 | On the &, only & & available | |||
| 215 | Material is never available | |||
| 216 | Entered value not allowed | |||
| 217 | No planned orders exist for the selection criteria | |||
| 218 | Error & does not exist | |||
| 219 | Special procurement & for plant & is not valid | |||
| 220 | Week is invalid | |||
| 221 | Document has SAP objects assigned | |||
| 222 | SQL error: Error in READ (Table: & ) | |||
| 223 | SQL error: Error in the UPDATE (Table: & ) | |||
| 224 | SQL error: Error in the DELETE (Table: & ) | |||
| 225 | SQL error: Error in the SELECT (Table: & ) | |||
| 226 | SQL error: error during INSERT (table: &) | |||
| 227 | MRP calculation only until the end of the short-term horizon | |||
| 228 | No. of periods for the end of the short-term horizon set to 1 | Space: object requires documentation | ||
| 229 | The validity of the short-term horizon ws not limited | |||
| 230 | Short and long-term lot-size indicator not compatible | |||
| 231 | Long-term planning is not active in plant & | |||
| 232 | Start authorization for application & not set | |||
| 233 | Planning calendar is blocked. Display only | |||
| 234 | Sales order &1 &2 is blocked for single-item planning | |||
| 235 | An order quantity of 0 is not allowed | |||
| 236 | Material &1 &2 is blocked from planning with scenario &3 | |||
| 237 | Planning run for scenario &1 is plant &2 has already started | |||
| 238 | Contract uses storage location & | |||
| 239 | Stge loc. does not correspond to the stge loc. of the scheduling agmt | |||
| 240 | No documents exist | |||
| 241 | Materials to be discont.in parallel and follow-up mat.are deactivated | |||
| 242 | Inserting is not possible in the discontinue/follow-up procedure | |||
| 243 | Documents exist (indicator cannot be set) | |||
| 244 | The sum of the usage probabilitites is & | |||
| 245 | Material's assembly scrap is & | |||
| 246 | Time interpr.only poss.when using period lot size with planning calendar | |||
| 247 | Do not maintain time interpretation and scheduling together | |||
| 248 | Multi-level discontinuation not supported | Space: object requires documentation | ||
| 249 | Conversion between units of measure &1 / &2 for material &3 not possible | |||
| 250 | Quantity overflow for component & in BOM explosion | |||
| 251 | Error: non-stock component &1 with in-house production is recursive | |||
| 252 | Please specify an account assignment type with consumption posting 'U' | |||
| 253 | Material &1 &2. Status &3 allows no purchase order | |||
| 254 | Entry with "*" not allowed | |||
| 255 | Long-term lot size has not yet been completely maintained | |||
| 256 | Material &1 in plant &2 is blocked for Purchasing | Space: object requires documentation | ||
| 257 | Quantity overflow of material & in net requirements calculation | Space: object requires documentation | ||
| 258 | Error during compression of internal table & | Space: object requires documentation | ||
| 259 | Error during expanding of internal table & | Space: object requires documentation | ||
| 260 | Internal table &1 is not in memory | Space: object requires documentation | ||
| 261 | Transfer end &2 is before transfer start &1. | Space: object requires documentation | ||
| 262 | Planning run executed: &1 materials, &2 with exceptions | Space: object requires documentation | ||
| 263 | Order is not part of the BOM you are currently processing | Space: object requires documentation | ||
| 264 | Purchase requisition can only be deleted by deleting the order. | Space: object requires documentation | ||
| 265 | Not a valid SAP object | |||
| 266 | Order quantity &1 &3 increased by &2 &3 scrap | Space: object requires documentation | ||
| 267 | The scrap quantity was adjusted proportionally | Space: object requires documentation | ||
| 268 | The order quantity may not be less than the GR quantity. | Space: object requires documentation | ||
| 269 | Partially confirmed planned order &1 cannot be deleted | Space: object requires documentation | ||
| 270 | Account assignment data is incomplete | Space: object requires documentation | ||
| 271 | Invalid date &1 for element &2 &3 &4 | Space: object requires documentation | ||
| 272 | Material is locked for purchasing | Space: object requires documentation | ||
| 273 | No vendor (creditor) found for MRP element | Space: object requires documentation | ||
| 274 | No customer (debitor) found for MRP element | Space: object requires documentation | ||
| 275 | Material & does not exist in plant &, MRP area & | Space: object requires documentation | ||
| 276 | Special characters & and & not allowed | |||
| 277 | Error calculating the period of adjustment for demand management | |||
| 278 | Purchase requisition &1 has not delivery date | Space: object requires documentation | ||
| 279 | Deletion of & is only allowed in single-level BOM/structure representn | Space: object requires documentation | ||
| 280 | You change only change & in single-level BOM/structure representation | Space: object requires documentation | ||
| 281 | Storage location '&' for material '&' in MRP area '&' planned separately | Space: object requires documentation | ||
| 282 | Error reading the BOM & & | |||
| 283 | Invalid unit of measure for components & & | |||
| 284 | Up to &, only & can be confirmed. Requested & | |||
| 285 | Configured BOM could not be exploded | |||
| 286 | Material requires configuration | |||
| 287 | Indicator cannot be set/deleted not possible (documents exist) | |||
| 288 | Project and/or WBS element not complete | |||
| 289 | Project does not allow individual project production | |||
| 290 | Project and/or WBS element does not exist | |||
| 291 | Missing configuration in planned order &1 | Space: object requires documentation | ||
| 292 | Missing configuration in sales requirement &1 | Space: object requires documentation | ||
| 293 | You can maintain the components by exploding the BOM | Space: object requires documentation | ||
| 294 | Total requirement & does not exist | Space: object requires documentation | ||
| 295 | Project &1 is not an account assignment element | Space: object requires documentation | ||
| 296 | Please check the selection parameters | Space: object requires documentation | ||
| 297 | Column with rescheduling date shown | Space: object requires documentation | ||
| 298 | New version copied from & & & & | |||
| 299 | ***** COMMENT: Messages for missing table entries | |||
| 300 | MRP controller '&1' for material '&2' does not exist | |||
| 301 | Plant '&1' does not exist | |||
| 302 | MRP parameters for plant '&1' have not been maintained | |||
| 303 | No entry exists for plant &, material type & in V134M | Space: object requires documentation | ||
| 304 | Material & does not exist | Space: object requires documentation | ||
| 305 | Material status &1 does not exist for material &2 | |||
| 306 | Release indicator &1 not allowed for purchase requisition &2 | |||
| 307 | MRP type &1 not allowed for material &2 | |||
| 308 | Lot-sizing procedure &1 not allowed for material &2 | |||
| 309 | Error uploading & | |||
| 310 | Range of coverage profile &1 does not exist | |||
| 311 | No entries in Table &1 found | |||
| 312 | &1 / &2 / &3 is an invalid combination or action code not allowed | |||
| 313 | Unknown action code &1 | |||
| 314 | No entry for &1, &2, &3 in the list profiles | |||
| 315 | No action code(s) copied | |||
| 316 | No print data exists | |||
| 317 | Splitting indicator &1 does not exist | |||
| 318 | Exception message &1 or exception message text does not exist | |||
| 319 | Special procurement key &1 not defined in plant &2 | |||
| 320 | Data transferred by SAP | |||
| 321 | Text for MRP element &1 not maintained in language &2 | |||
| 322 | Action &2 executed for planned order &1 | |||
| 323 | Please enter action code | |||
| 324 | Storage location &2 in plant &1 does not exist | |||
| 325 | No entry exists for plant &1 in plant Table | |||
| 326 | No entry exists for unit &1 in Table of units | |||
| 327 | "Firm" and "Delete firm ind." set at the same time | |||
| 328 | Combination "detete" and "print" not allowed | |||
| 329 | Action &1 cannot be executed together with another action | Space: object requires documentation | ||
| 330 | Action &1 requires the update within the module | Space: object requires documentation | ||
| 331 | Error downloading & | |||
| 332 | Components were deleted | |||
| 333 | No components were deleted | |||
| 334 | Storage location & does not exist | |||
| 335 | & batch does not exist | |||
| 336 | Storage location &1 not maintained for material &2 in plant &3 | |||
| 337 | The withdrawn quantity (partially) exceeds the requirement quantity | |||
| 338 | No customer requirements exist for materials selected | Space: object requires documentation | ||
| 339 | Unit of measure conversion for material &1 of &2 terminated in &3 | Space: object requires documentation | ||
| 340 | Scope of planning '&1' does not exist. | Space: object requires documentation | ||
| 341 | Planning run for scope of planning is only possible in parallel mode | Space: object requires documentation | ||
| 342 | Document is marked for deletion | |||
| 343 | The order was already checked according to ATP logic | |||
| 344 | No planned independent requirements maintained for material | |||
| 345 | Plant / MRP area does not exist in scope of planning | Space: object requires documentation | ||
| 346 | Capacity has already been planned for the order | |||
| 347 | Planning run with scope of planning. Delete scope of plng for plant plng | Space: object requires documentation | ||
| 348 | Planning file (DBVM) is empty | Space: object requires documentation | ||
| 349 | Selected scope of planning &1 is empty | Space: object requires documentation | ||
| 350 | Selected scope of planning &1 is empty. Please fill or delete | Space: object requires documentation | ||
| 351 | Component &1 cannot be deleted | Space: object requires documentation | ||
| 352 | Two quantity columns inserted in unit of measure & | Space: object requires documentation | ||
| 353 | No search criteria were entered: timeout ! | |||
| 354 | Plg calendar n.maintained far enough into future or per.of entry too smll | |||
| 355 | Period profile &1 is not allowed to be used for plant &2 | Space: object requires documentation | ||
| 356 | Planned order &1 may not be changed | Space: object requires documentation | ||
| 357 | Schedule records are being deleted | Space: object requires documentation | ||
| 358 | Columns with vendor data shown | Space: object requires documentation | ||
| 359 | Columns with customer data inserted | Space: object requires documentation | ||
| 360 | Pegged order & does not exist | Space: object requires documentation | ||
| 361 | Navigation profile & does not exist | Space: object requires documentation | ||
| 362 | Please maintain the account assignment data | Space: object requires documentation | ||
| 363 | Date &1 for element &2 &3 &4 is not within the factory calendar | Space: object requires documentation | ||
| 364 | Function & is not active | |||
| 365 | Manual firming date &1 set | Space: object requires documentation | ||
| 366 | Manual firming date &1 deleted | Space: object requires documentation | ||
| 367 | Action &1 is not possible for simulative planned orders | Space: object requires documentation | ||
| 368 | Quantity overflow when saving schedule lines for material & | Space: object requires documentation | ||
| 369 | Quantity overflow when importing MRP elements for material & | Space: object requires documentation | ||
| 370 | BOM is not valid: &1, &2, &3, &4 | Space: object requires documentation | ||
| 371 | Several main parts in discontinuation group &1 | Space: object requires documentation | ||
| 372 | Sales order planning/project planning not possible for material &1 &2 | Space: object requires documentation | ||
| 373 | Single item planning in simultation mode not possible for material &1 &2 | Space: object requires documentation | ||
| 374 | Time stamp problem: Changes to planned order '&1' terminated | Space: object requires documentation | ||
| 375 | Revision levels already exist for & / & / & | |||
| 376 | ******* COMMENT: 340- BOM explosion number checks | |||
| 377 | BOM explosion number & is not active | |||
| 378 | BOM explosion number & is only valid in plant & | |||
| 379 | BOM explosion number & is only valid for material & in plant & | |||
| 380 | ****COMMENT: 348-379 Messages for BOM explosion number maintenance | |||
| 381 | You do not have the nec.authorization for maintaining BOM explosion nos. | |||
| 382 | You do not have the necessary authorization for displaying BOM expl.nos. | |||
| 383 | There is no access path from your front end to data carrier & | |||
| 384 | Please select at least one BOM explosion number | |||
| 385 | No BOM explosion numbers exist in the selected area | |||
| 386 | BOM explosion number & is blocked by another user | |||
| 387 | Error blocking BOM explosion number & | |||
| 388 | Error unblocking BOM explosion number & | |||
| 389 | Error deleting BOM explosion number & | |||
| 390 | BOM explosion number & has been deleted by another user | |||
| 391 | BOM explosion number & has been changed by another user | |||
| 392 | Error reading BOM explosion number & | |||
| 393 | Error saving BOM explosion number & | |||
| 394 | File & could not be accessed | |||
| 395 | BOM explosion number & already exists | |||
| 396 | Please enter a BOM explosion number | |||
| 397 | & BOM explosion number(s) was(were) saved | |||
| 398 | Please enter a fixed key date | |||
| 399 | Fixed key date in the past | |||
| 400 | No BOM explosion numbers were changed | |||
| 401 | Error deleting BOM explosion number & | |||
| 402 | BOM explosion number & has been flagged for deletion | Space: object requires documentation | ||
| 403 | & BOM explosion numbers were retrieved | |||
| 404 | BOM explosion number & cannot be recovered | |||
| 405 | Document was created from scratch | |||
| 406 | & BOM explosion number(s) was(were) recovered | |||
| 407 | Please select only one item | |||
| 408 | Error saving new key assignment & -> & | |||
| 409 | & new key assignment(s) was(were) saved | |||
| 410 | Error unblocking new key assignment & -> & | |||
| 411 | BOM explosion number & is not active | |||
| 412 | New key assignment is blocked by another user | |||
| 413 | Error blocking new key assignment | |||
| 414 | & new key assignment(s) was(were) deleted | |||
| 415 | New key assignment for BOM explosion number & blocked. Display only | |||
| 416 | Object & & is already locked | |||
| 417 | ****** COMMENT: 380-382 messages for order profile - F4 | |||
| 418 | Please maintain Table T460B | |||
| 419 | Please maintain the order profile | |||
| 420 | BOM selection not maintained | |||
| 421 | Document & exists -> link status 1 changed to 2 | |||
| 422 | ****COMMENT: further messages for BOM explosion number maintenance | |||
| 423 | Select a line | |||
| 424 | A new key assignment exists for this entry already | |||
| 425 | No vault available | |||
| 426 | No authorization for & in plant & and MRP controller & | |||
| 427 | No authorization for & in plant & | |||
| 428 | No authorization for & | |||
| 429 | Material & in plant & has been marked for deletion | |||
| 430 | The MRP element no longer exists | |||
| 431 | No authorization for & and planning scenario & in plant & | |||
| 432 | No authorization for &1 and planning scenario &2 | |||
| 433 | File archived in vault & | |||
| 434 | Incomplete transfer of parameters in index maintenance RSDB | |||
| 435 | RSDB record already exists | |||
| 436 | No RSDB record exists | |||
| 437 | Field exceeded in RSDB index counter table | Space: object requires documentation | ||
| 438 | Run schedule header cannot be calculated | Space: object requires documentation | ||
| 439 | Error during creation of a run schedule header | Space: object requires documentation | ||
| 440 | ****** COMMENT: 417-433 Allocate projects | |||
| 441 | & allocation(s) was/were saved | |||
| 442 | & allocation(s) was/were deleted | |||
| 443 | Document not archived: audit function not possible | |||
| 444 | An allocation already exists for this entry | |||
| 445 | Error saving the new allocation for plant & and material & | |||
| 446 | Error unblocking the sales order item & & | |||
| 447 | Error reading the WBS element & | |||
| 448 | Sales order item & & is blocked | |||
| 449 | Error blocking the sales order item & & | |||
| 450 | No entries have been selected | |||
| 451 | Please enter a WBS element | |||
| 452 | No posting to projects is allowed for item & & | |||
| 453 | Material & allows no make-to-order stock | |||
| 454 | No audit original could be displayed for this log entry | |||
| 455 | Item & & allows no make-to-order stock | |||
| 456 | No items exist for the sales order & | |||
| 457 | Specify an item | |||
| 458 | Please enter a sales order first | |||
| 459 | Daily split carried out | |||
| 460 | Production line does not exist | |||
| 461 | Please place the cursor on a line with run schedule data | |||
| 462 | No planned order was selected for assignment | |||
| 463 | Invalid cursor position for executing selected function | |||
| 464 | Selected material does not appear in any product group | |||
| 465 | Document & inserted | |||
| 466 | Error changing the cost collector | |||
| 467 | Error creating cost collector | |||
| 468 | Order type not in Table & | |||
| 469 | Error creating cost collector | |||
| 470 | Run schedule & with cost collector & will be created | |||
| 471 | Data may not be up-to-date -> renew | |||
| 472 | Reducing the quantity during assignment is not permitted | |||
| 473 | Distribution function & is incorrect in plant & | |||
| 474 | Planning ID & was not entered | |||
| 475 | Enter MRP controller | Space: object requires documentation | ||
| 476 | SAP archiving for document type & maximum & bytes: file has & bytes | |||
| 477 | Enter either the material or the run schedule number | |||
| 478 | Dummy message & for & in plant & and MRP controller & | |||
| 479 | Not possible to branch into details | |||
| 480 | Enter plant | |||
| 481 | Run schedule header & will be created | |||
| 482 | Run schedule header & does not exist | |||
| 483 | Run schedule header & exists already | |||
| 484 | Run schedule header & will be changed | |||
| 485 | Run schedule header & will be deleted | |||
| 486 | Please select planning object | |||
| 487 | Environment variable 'HOSTNAME' not maintained for your PC | |||
| 488 | Entered line or column greater than maximum value | |||
| 489 | No run schedule header exists for material & & | |||
| 490 | No run schedule header exists for material & & version & | |||
| 491 | Select field | |||
| 492 | In period & the total quantity is short of & | |||
| 493 | In period & the total quantity is exceeded by & | |||
| 494 | Repetitive mfg not allowed for material & & | |||
| 495 | Version for material either does not exist or is blocked | |||
| 496 | Validity period end is smaller than validity period start | |||
| 497 | Validity period end lies after version validity date & | |||
| 498 | Programm & cannot be accessed | |||
| 499 | Validity period start lies brfore version validity date & | |||
| 500 | Enter version | |||
| 501 | RS header & already exists in the schedule run time | |||
| 502 | No run schedule header exists for this selection | |||
| 503 | Not possible to convert to production order | Space: object requires documentation | ||
| 504 | Incorrect run schedule header & in planned/production order & | |||
| 505 | Entry & & & missing in T437Z | |||
| 506 | No version entered, sel. ind will be deleted | |||
| 507 | No valid run schedule header exists in this time | |||
| 508 | No assignment possible | |||
| 509 | Please select only one | |||
| 510 | & planned orders cannot be specifically assigned | |||
| 511 | Please enter plnning calendar for freely definable plnng period selection | |||
| 512 | Please select planning period | |||
| 513 | Entry & missing in Table & | |||
| 514 | Assignment not possible. No active version exists for the planning date | |||
| 515 | No element in column & can be confirmed | |||
| 516 | No planned data exists for material &, plant & | |||
| 517 | No planning calendar can be selected | |||
| 518 | Please select only one period split | |||
| 519 | Please select at least one output object | |||
| 520 | Document & does not exist | |||
| 521 | No valid calendar ID was entered | |||
| 522 | No element in column & can be assigned | |||
| 523 | Final delivery has already been made for partial order & | |||
| 524 | No released production order was selected | |||
| 525 | No open reservations exist for production order & | |||
| 526 | Production order & has already been finally confirmed | |||
| 527 | Conversion factor to unit of measure & for material & not maintained | |||
| 528 | Run schedule header & is blocked | |||
| 529 | Run sched. hdr &1 cannot be deleted because run sched. qty still exists | Space: object requires documentation | ||
| 530 | Entered version does not appear in the planning table | |||
| 531 | Maintain document type & as data carrier | |||
| 532 | Object & does not exist | |||
| 533 | Number range & for object & does not exist | |||
| 534 | Entered version already exists | |||
| 535 | Enter a version | |||
| 536 | Enter a run schedule header with partial orders | |||
| 537 | No capactiy planning active | |||
| 538 | Assignments were saved | |||
| 539 | Changes were made to master plan | |||
| 540 | Delete not possible: RH header's cost collector has no deletion indicator | |||
| 541 | Please enter a material | |||
| 542 | Status in engineering change mgmt cannot be set as "finished" | |||
| 543 | Invalid object type | |||
| 544 | Number range & for object & not planned for internal allocation | |||
| 545 | Number range not planned for external allocation | |||
| 546 | Number range &1 for object &2 nearly exhausted | |||
| 547 | Number range & for object &2 exhausted | |||
| 548 | Number & does not lie within the provided interval | |||
| 549 | No documentation exists | |||
| 550 | Please maintain repetitive mfg profile in the material master record | |||
| 551 | Entered product group does not exist | |||
| 552 | No costing data exists | |||
| 553 | Document is used & | |||
| 554 | Deletion ind. cannot be set; validity per. of RS header extends in future | Space: object requires documentation | ||
| 555 | Deletion indicator will be set; it cannot be reset | Space: object requires documentation | ||
| 556 | Please check your entries | |||
| 557 | Please enter valid hierarchy | |||
| 558 | & RS created, & RS changed, & create version, & change version terminated | |||
| 559 | RS header for material &, version & not created. Reason: | |||
| 560 | Not possible to go to line set as you did not access via line set | |||
| 561 | No pegged requirements exist | |||
| 562 | Please enter either RS header or material, version and selection date | |||
| 563 | Runtime of RS header cannot be shortened as much | |||
| 564 | Copy of archive link could not be produced in & | |||
| 565 | Procurement type/special procurement type only available as from 2.0 | |||
| 566 | Please enter either the production or the stock transfer plant | |||
| 567 | The production/stock transfer plant corresponds to the ordering plant | |||
| 568 | Special procurement type & not defined | |||
| 569 | Lot-size indicator for lot-sizing procedure & invalid | |||
| 570 | Invalid entry | |||
| 571 | Plant entry unnecessary for procurement type "&", special proc. "&" | |||
| 572 | Please enter the period length (number of days) | |||
| 573 | Period length was cancelled | |||
| 574 | Please complete table entry | |||
| 575 | Data carrier & already exists | |||
| 576 | Please maintain the range of coverage period | |||
| 577 | Backflush not possible as not a milestone operation | |||
| 578 | No capacity data can be displayed | |||
| 579 | The dates are displayed in ascending order | |||
| 580 | Production line not available in the planning table | |||
| 581 | Production line and version are not compatible | |||
| 582 | Requirements quantity cannot be split | |||
| 583 | Please maintain the distribution function | |||
| 584 | The latest reqmts date must lie between the reqmts date and the plnnd end | |||
| 585 | Distribution does not exist | |||
| 586 | Maintain document type & as frontend | |||
| 587 | Dependent components will be deleted | |||
| 588 | Unit of measure & in & cannot be converted | |||
| 589 | No long text exists for component & | |||
| 590 | No text exists for item & | |||
| 591 | Please check the material components | |||
| 592 | BOM alternative & is not allowed for application & | |||
| 593 | Planning calendar & does not exist | |||
| 594 | Please remove error first | |||
| 595 | Attention recursiveness. Material & is the same as the order material | |||
| 596 | Planning calendar & exists already | |||
| 597 | Revision level maintenance not active in system | |||
| 598 | Planning calendar & does not exist. You can create it if you want | |||
| 599 | Planning calendar & will be saved | |||
| 600 | Please select a phantom assembly | |||
| 601 | Withdrawal quantity greater than the requirements quantity | |||
| 602 | Availability check only possible for item kept in stock | |||
| 603 | Selection parameters were saved | |||
| 604 | Selection parameters were deleted | |||
| 605 | Version & does not exist for material & in plant & | |||
| 606 | Version & invalid for material & in plant & | |||
| 607 | No run schedule could be determined for version & | |||
| 608 | Valid-from date is after valid-to date | |||
| 609 | Select a procurement proposal | Space: object requires documentation | ||
| 610 | BOM explosion number & does not exist | |||
| 611 | BOM explosion number & is not allowed for material & in plant & | |||
| 612 | Procurement proposal was copied | Space: object requires documentation | ||
| 613 | The procurement proposal was not changed | Space: object requires documentation | ||
| 614 | Components repeat is switched on | |||
| 615 | Components repeat is switched off | |||
| 616 | Direct procurement has not yet been initiated | |||
| 617 | No purchase orders exist as yet | |||
| 618 | %N& | |||
| 619 | Additional file cannot be accessed & | |||
| 620 | The planned order has not yet been scheduled. Please reschedule | |||
| 621 | No scheduling log exists | |||
| 622 | Outline agreement & & does not exist | |||
| 623 | Outline agreement & & is not allowed | |||
| 624 | Outline agreement & & was deleted | |||
| 625 | Please enter order/purchase requisition key | |||
| 626 | Please select a variable-sized item | |||
| 627 | The unit of entry is set equal to the unit of issue | |||
| 628 | Check the settings for checking group & and checking rule & | |||
| 629 | Planned orders selected were firmed | |||
| 630 | No number range has been entered for sim. dep.reqmts for plant & | |||
| 631 | Partial order cannot be released | |||
| 632 | Lot size area for version: from & to & | |||
| 633 | No scheduling allowed | |||
| 634 | Capacitites checked. No overload found. | |||
| 635 | Assembly orders, changes are transferred to sales order | |||
| 636 | Availability check without storage location was activated | |||
| 637 | Avail.check w/o storage locations can lead to inconsistencies | |||
| 638 | The selected planned orders were changed | |||
| 639 | The selected planned orders will be "unfirmed" | |||
| 640 | ***************************************************** | |||
| 641 | * error messages in table maintenance * | |||
| 642 | ***************************************************** | |||
| 643 | *** COMMENT: Messages for SAPMM61C / Transaction OPPQ | |||
| 644 | Plant & does not exist | |||
| 645 | No plant parameters are maintained for plant & | |||
| 646 | Plant parameters for plant & were deleted | |||
| 647 | Parameters from plant & were copied to plant & | |||
| 648 | Plant parameters for plant & can now be maintained | |||
| 649 | Error reading the parameters for plant & | |||
| 650 | Error during modification of Table & | |||
| 651 | Error blocking table & | |||
| 652 | Plant parameters are blocked by another user | |||
| 653 | Parameters already exist for plant & | |||
| 654 | Create parameters for plant & first | |||
| 655 | You do not have required authorization to maintain parameters in Tab. & | |||
| 656 | Parameters for plant & were partially copied to plant & | |||
| 657 | Parameters for plant & were partially delete | |||
| 658 | Specify a plant | |||
| 659 | Parameters for plant & were entered in correction & | |||
| 660 | Entry is not allowed | |||
| 661 | Calculation rule not maintained correctly | |||
| 662 | Please specity valid vendor | |||
| 663 | *** COMMENT: Messages for SAPMM61C / Transaction OPPR | |||
| 664 | MRP group & & does not exist | |||
| 665 | MRP group & & was deleted | |||
| 666 | MRP group & & was copied to & & | |||
| 667 | MRP group & & can now be maintained | |||
| 668 | Error reading MRP group & & | |||
| 669 | Error modifying MRP group & & | |||
| 670 | Error blocking MRP group (Table T438M) | |||
| 671 | MRP groups are blocked by another user | |||
| 672 | MRP group & & already exists | |||
| 673 | Please create an MRP group first | |||
| 674 | You do not have the necessary authorization to maintain MRP groups | |||
| 675 | MRP group & & was entered in correction & | |||
| 676 | Please enter an MRP group | |||
| 677 | MRP group text was not changed | |||
| 678 | MRP group text was saved | |||
| 679 | Creation of outline agreement requisitions in MRP not allowed | Space: object requires documentation | ||
| 680 | List for the detailed search does not exist | Space: object requires documentation | ||
| 681 | No elements exist for search | |||
| 682 | No further elements were selected for search | |||
| 683 | The order type does not exist | |||
| 684 | The ord.type refers to internal or external no.ranges. Check ord.no.entry | |||
| 685 | There are still quantities on the line for order &1 | Space: object requires documentation | ||
| 686 | The variance key does not exist | |||
| 687 | The controlling area does not exist | |||
| 688 | The cost element does not exist | |||
| 689 | The order type has not been allocated a number range | |||
| 690 | Error in number management (please notify the responsible person) | |||
| 691 | Production version &1 for material &2 in plant &3 is locked | Space: object requires documentation | ||
| 692 | Overhead key could not be determined (check costin variant) | |||
| 693 | No data exists | Space: object requires documentation | ||
| 694 | Only enter proportion unit | Space: object requires documentation | ||
| 695 | Only enter product unit | Space: object requires documentation | ||
| 696 | No receiver defined in Customizing for MRP controller | Space: object requires documentation | ||
| 697 | Splitting quota not allowed | |||
| 698 | Processing indicator was set | Space: object requires documentation | ||
| 699 | Processing indicator reset | Space: object requires documentation | ||
| 700 | Error in reading consumption values | Space: object requires documentation | ||
| 701 | & is not a proportion unit | Space: object requires documentation | ||
| 702 | & is not a product unit | Space: object requires documentation | ||
| 703 | No order type can be determined automatically | |||
| 704 | Purchase requisition no longer exists | |||
| 705 | Enter a unit of measure | Space: object requires documentation | ||
| 706 | Enter plant or MRP area | Space: object requires documentation | ||
| 707 | Enter a plant | Space: object requires documentation | ||
| 708 | Enter an MRP area | Space: object requires documentation | ||
| 709 | At the most, today's date allowed. The & lies in the future. | |||
| 710 | Enter today's or a future date | Space: object requires documentation | ||
| 711 | Settings for user & saved | Space: object requires documentation | ||
| 712 | The settings for user & have been reset to the default settings | Space: object requires documentation | ||
| 713 | No exception messages are contained in the list | |||
| 714 | The MRP list was already processed on the & | |||
| 715 | When searching using exceptions, select at least one exception | |||
| 716 | When searching using MRP element, select at least one MRP element | |||
| 717 | Please select at least one material | Space: object requires documentation | ||
| 718 | No message exists for material & in plant & | |||
| 719 | Document type not created | Space: object requires documentation | ||
| 720 | Please enter an MRP controller | |||
| 721 | Enter MRP controller, product group, line or planning ID | Space: object requires documentation | ||
| 722 | & & is a product group | Space: object requires documentation | ||
| 723 | & & is not a product group | |||
| 724 | Enter product group | Space: object requires documentation | ||
| 725 | Selection by material: enter a material | Space: object requires documentation | ||
| 726 | Conversion of planning file entries: test (T), processing (X) | Space: object requires documentation | ||
| 727 | Conversion of planning file entries has already been carried out | Space: object requires documentation | ||
| 728 | Planning file entries for MRP areas are not converted | Space: object requires documentation | ||
| 729 | Control parameters for MRP areas do not exist | Space: object requires documentation | ||
| 730 | MRP areas are active. It is not possible to delete planning file entries | Space: object requires documentation | ||
| 731 | MRP areas are not defined for SAP Retail systems | Space: object requires documentation | ||
| 732 | Class & does not exist for class type & | |||
| 733 | Class type & not allowed | |||
| 734 | Please enter class and class type | |||
| 735 | Please enter valid production line | |||
| 736 | If necessary, limit the selection further | |||
| 737 | Please enter the selection criteria | |||
| 738 | No authorization for activation of MRP areas | Space: object requires documentation | ||
| 739 | ***** COMMENT: Pegged orders PlOrd: No direct calls -> LTP | Space: object requires documentation | ||
| 740 | There is no pegged requirement for planned order &1 | Space: object requires documentation | ||
| 741 | Pegged requirement for planned order &1 does not contain an order number | Space: object requires documentation | ||
| 742 | Pegged requirement for planned order &1 does not contain an order number | Space: object requires documentation | ||
| 743 | Pegged planned order for requirements &1 / &2 does not exist | Space: object requires documentation | ||
| 744 | Planned order &1 cannot be deleted. Goods receipt quantity greater than 0 | Space: object requires documentation | ||
| 745 | Order tree for the first procurement element &1 &2 is displayed | Space: object requires documentation | ||
| 746 | Order report will be displayed | Space: object requires documentation | ||
| 747 | The order report will be displayed with a maximum of &1 hierarchies | Space: object requires documentation | ||
| 748 | ***** COMMENT: distribution function: messages | |||
| 749 | Distribution key - initial | |||
| 750 | Distribution key not maintained in Table & | |||
| 751 | Issuing storage location only possible for stock transfer | Space: object requires documentation | ||
| 752 | ***** COMMENT: Tree Control: Message | Space: object requires documentation | ||
| 753 | Error in function module &1 | Space: object requires documentation | ||
| 754 | Grouping without priority is not allowed for &1 | Space: object requires documentation | ||
| 755 | Grouping for &1 reset | Space: object requires documentation | ||
| 756 | The requested hierarchy levels are already being displayed | The short text describes the object sufficiently | ||
| 757 | No additional hierarchy levels can be displayed for the element | The short text describes the object sufficiently | ||
| 758 | Threshold values not maintained correctly | Space: object requires documentation | ||
| 759 | 'Multilevel Delay' indicator not set in profile &1 | The short text describes the object sufficiently | ||
| 760 | Multilevel delay will be calculated for all sales orders in system | The short text describes the object sufficiently | ||
| 761 | Sales order item &1 &2 is not MRP-relevant | The short text describes the object sufficiently | ||
| 762 | Firmed components of the planned order are copied | Space: object requires documentation | ||
| 763 | Multilevel delay calculated for &1 sales orders | The short text describes the object sufficiently | ||
| 764 | &1 entries deleted from database table &2 | The short text describes the object sufficiently | ||
| 765 | * Comment; messages for availability check | |||
| 766 | The committment is only possible for the amount of the ATP qty & | |||
| 767 | Changes were copied | |||
| 768 | No changes were made | |||
| 769 | The total committed quantity is greater than the order quantity | |||
| 770 | Please select a line that can be changed | |||
| 771 | Data on updating backorders was saved | |||
| 772 | Please check the controlling of updating backorders | |||
| 773 | You have no authorization for updating backorders in plant & | |||
| 774 | You have no authorization for making changes in plant & | |||
| 775 | Material & is already being processed in plant & | |||
| 776 | Reqmts switched from collective to individual reqmts | |||
| 777 | Reqmts switched from individual to collective reqmts | |||
| 778 | No coverage by the master plan for this date | |||
| 779 | Order date lies after the confirmation date | |||
| 780 | Receipts in the past were included | |||
| 781 | Receipts in the past were not included | |||
| 782 | There are no components for the availability check in order & | Space: object requires documentation | ||
| 783 | The system could not determine a storage location | |||
| 784 | Order & was not deleted. Confirm with ENTER first | Space: object requires documentation | ||
| 785 | Inconsistencies when creating/modifying the procurement elements | |||
| 786 | Receipt quantity greater than requirement quantity | |||
| 787 | Configuration change not copied to all production orders | |||
| 788 | Document with credit limit block! | |||
| 789 | Document with reqmt-specific delivery block! No changes possible | |||
| 790 | Document with reqmt-specific credit limit block! No changes possible | |||
| 791 | Order &1:Configuration change not completely executed | Space: object requires documentation | ||
| 792 | *** Messages for printing the component list (SAPLM61L) | |||
| 793 | Error determining the material components | |||
| 794 | Internal configuration error | |||
| 795 | Only &2 decimal places are defined for unit of measure &1 | Space: object requires documentation | ||
| 796 | Object dependency too complicated. BOM: &1-Valid from: &2-Item: &3 | Space: object requires documentation | ||
| 797 | **** COMMENT: Messages from check modules in customizing | |||
| 798 | Please enter a period split | |||
| 799 | Please enter a planning calendar | |||
| 800 | Target range of coverage is smaller that the minimum range of coverage | |||
| 801 | Target range of coverate is greater than the minimum range of coverage | |||
| 802 | Order type & is not provided for the order group & | |||
| 803 | Entry & & does not exist | |||
| 804 | Make entries in all required entry fields ('*' allowed) | |||
| 805 | Selection ID & does not exist | |||
| 806 | For production rate planning, a simplified routing should be used | |||
| 807 | The indicator "Create capacity requirements" was set | |||
| 808 | Do not set the rounding value smaller than the threshold value | |||
| 809 | Please set threshhold value increasing monotonically | |||
| 810 | Please set the rounding value increasing monotonically | |||
| 811 | Please enter an item number | |||
| 812 | Destination &1 not active | Space: object requires documentation | ||
| 813 | Maintain selection ID in the scheduling parameters | Space: object requires documentation | ||
| 814 | Enter at least the target or the maximum range of coverage | |||
| 815 | Enter withdrawal plant | Space: object requires documentation | ||
| 816 | Withdrawal plant and production plant must be different | Space: object requires documentation | ||
| 817 | Plant input only necessary for withdrawal from alternative plant | Space: object requires documentation | ||
| 818 | Direct production is only possible with in in-house production | Space: object requires documentation | ||
| 819 | Combination not possible | Space: object requires documentation | ||
| 820 | Plants &1 and &2 are assigned to different company codes | Space: object requires documentation | ||
| 821 | Plants &1 and &2 are assigned to different controlling areas | Space: object requires documentation | ||
| 822 | This item has already been entered | Space: object requires documentation | ||
| 823 | Counter number is zero or incorrect sequence | Space: object requires documentation | ||
| 824 | Entry or a plant which belongs to an MRP area already exists | Space: object requires documentation | ||
| 825 | No total reqs exist for material &1, plant &2, production version &3 | Space: object requires documentation | ||
| 826 | Select at least one material for the comparison | Space: object requires documentation | ||
| 827 | No additional individual requirements exist for total requirement &1 | Space: object requires documentation | ||
| 828 | No total requirements exist for material &1, plant &2 | Space: object requires documentation | ||
| 829 | "To-date" must not precede the "From-date" | Space: object requires documentation | ||
| 830 | Overlapping of periods is not permitted: Periods from &1 to &2 | Space: object requires documentation | ||
| 831 | Date-from and date-to must be entered | Space: object requires documentation | ||
| 832 | No firming type for reorder point or time-phased material planning | Space: object requires documentation | ||
| 833 | There is no icon called &1 | Space: object requires documentation | ||
| 834 | Error occurred in method &1 | The short text describes the object sufficiently | ||
| 835 | Special procurement type &1 not allowed in multilevel subcontracting | The short text describes the object sufficiently | ||
| 836 | COMMENT*****: Messages for comparison of the MRP lists | |||
| 837 | No MRP lists exist | |||
| 838 | *** Comment; Messages for repetitive planning table III | Space: object requires documentation | ||
| 839 | 'Adjust scheduling' level incorrect: &1 / &2 / &3 | Space: object requires documentation | ||
| 840 | Data is incomplete; check your entries | The short text describes the object sufficiently | ||
| 841 | Table RESB contains no fields with 'NOT ZERO' but without default | |||
| 842 | Field definitions for table RESB were changed | |||
| 843 | Table RESB is inconsistent | |||
| 844 | DB definition and SAP DDIC definition are not the same | |||
| 845 | No NAMETAB exists for table RESB in the SAP DDIC | |||
| 846 | ****COMMENT: Messages for calendar - F4 (SAPLDATD, FuBau F4 DATE) | |||
| 847 | No capacity requirements exist | |||
| 848 | The month &/& lies outwith the factor calendar | |||
| 849 | Error reading the factira calendar | |||
| 850 | Date lies outwith the factory calendar | |||
| 851 | The format of the date in invalid | |||
| 852 | Factory calendar & was not found | |||
| 853 | Date & lies in the past | |||
| 854 | General error. Please inform SAP | |||
| 855 | ****COMMENT: Messages for BAPI and CIF (planned order) | Space: object requires documentation | ||
| 856 | Planned order & version & does not exist | Space: object requires documentation | ||
| 857 | Planned order & version & is not valid on finish date & | Space: object requires documentation | ||
| 858 | No errors were found | The short text describes the object sufficiently | ||
| 859 | Error occurred in method &1 | The short text describes the object sufficiently | ||
| 860 | Warning! This function is only available as from Release 2.0 | |||
| 861 | System locking error | |||
| 862 | %N& & | |||
| 863 | ****COMMENT: Messages for Business Object BUS2004 (planned order) | Space: object requires documentation | ||
| 864 | Reading planned order &1 | Space: object requires documentation | ||
| 865 | Error occurred when maintaining planned orders | |||
| 866 | Internal error when accessing CY01_PLANNED_ORDERS_INTERFACE | The short text describes the object sufficiently | ||
| 867 | No load exists for the entered work center | |||
| 868 | No work centers were found with capacity requirements | |||
| 869 | Capacity planning was terminated | |||
| 870 | Error in internal table: planned order & does not exist | |||
| 871 | Error in internal table: production order & does not exist | |||
| 872 | Program error: internal table & is inconsistent | |||
| 873 | Error in internal table: work center & does not exist | |||
| 874 | Error in internal table: capacity & does not exist | |||
| 875 | Error in internal table: capacity requirement & does not exist | |||
| 876 | No planned order has been selected | |||
| 877 | Error in internal table: SOP order with index & does not exist | |||
| 878 | Please place cursor on valid column | |||
| 879 | The scrap quantity was adjusted proportionally | |||
| 880 | Order start date and opening date were adjusted | |||
| 881 | No scheduling log exists | |||
| 882 | Scheduling data can only be displayed for planned orders | |||
| 883 | Please place the cursor on a planned order number | |||
| 884 | Please select a valid field | |||
| 885 | No errors were found | The short text describes the object sufficiently | ||
| 886 | *****COMMENT: Messages for XPRA'S | |||
| 887 | Table KBKO successfully created from & PLAF records | |||
| 888 | Run time: & ms | |||
| 889 | ***************************************************** | |||
| 890 | * Error messages in the number range processing * | |||
| 891 | ***************************************************** |
History
| Last changed on/by | 20131127 | SAP | |
| SAP Release Created in |