SAP ABAP Message Class 61 Message Number 027 (No material components were determined)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class | 61 | ||
Short Description | Error Messages for MRP | ||
Message Number | 027 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
No material components were determined
Help Document
Diagnosis
Until now, no BOM explosion has been carried out or no BOM has been created for this material yet.
System Response
Procedure
- Either explode the bill of material for this material, or
- create the components manually by processing the planned order in change mode.
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |