SAP ABAP Message Class 61 Message Number 258 (Configured BOM could not be exploded)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class | 61 | ||
Short Description | Error Messages for MRP | ||
Message Number | 258 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Configured BOM could not be exploded
Help Document
Diagnosis
The system could not determine any configuration data for the requirement for this configurable BOM.
System Response
Procedure
Please check the configuration data of the requirement. If this data is correct, then this problem is due to a system error.
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |