SAP ABAP Message Class 61 Message Number 770 (Inconsistencies when creating/modifying the procurement elements)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class | 61 | ||
Short Description | Error Messages for MRP | ||
Message Number | 770 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Inconsistencies when creating/modifying the procurement elements
Help Document
Diagnosis
The system was not able to recommit the committed quantities in the control screen of the availability check when adjusting the procurement elements to your selection.
A possible reason for this is the selection of another BOM for the changed procurement elements due to another lot size or another date from the lot size and date in the original availability check.
System Response
Procedure
Carry out the availability check for the order item and check the result.
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |