SAP ABAP Message Class 61 Message Number 484 (Assignment not possible. No active version exists for the planning date)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class 61  
Short Description Error Messages for MRP    
Message Number 484  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Assignment not possible. No active version exists for the planning date
Help Document

Diagnosis

You wanted to assign run schedule quantities to production versions.

System Response

As no active production version exists for the selected planning date, the system cannot carry out the allocation.

Procedure

  1. Check which production version is to be active for the planning date.
  2. Check whether the run schedule header has been unlocked for this production version.

History
Last changed on/by 20131127  SAP 
SAP Release Created in