SAP ABAP Message Class 61 Message Number 810 (The indicator "Create capacity requirements" was set)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class | 61 | ||
Short Description | Error Messages for MRP | ||
Message Number | 810 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
The indicator "Create capacity requirements" was set
Help Document
Diagnosis
Scheduling only makes sense if capacity requirements are created.
System Response
The system automatically set the indicator for creating capacity requirements as you set the scheduling indicator.
Procedure
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |