SAP ABAP Message Class 61 Message Number 123 (Error determining planning periods for calendar &)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class 61  
Short Description Error Messages for MRP    
Message Number 123  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Error determining planning periods for calendar &
Help Document

Diagnosis

The system could not determine sufficient planning periods by the planning calendar to group requirements by planning calendar periods for all the requirements planned in the future.

System Response

When a material is planned by using the periodical lot size by planning calendar, sufficient periods must be calculated to group requirements by the planning calendar for all requirements.

Procedure

Rework the planning calendar with which the material was planned, which means calculate new planning calendar periods.

To do this, go to Customizing for MRP, under the activity Change PPC periods.

History
Last changed on/by 20131127  SAP 
SAP Release Created in