SAP ABAP Message Class 61 Message Number 142 (Finish date of a procurement proposal outside the factory calendar)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-MRP-BD (Application Component) Master Data
⤷
MD0C (Package) Customizing R/3 Material Requirements Planning

⤷

⤷

Attribute
Message class | ![]() |
61 | |
Short Description | ![]() |
Error Messages for MRP | |
Message Number | ![]() |
142 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20100310 |
Message Text
Finish date of a procurement proposal outside the factory calendar
Help Document
Diagnosis
When creating an order proposal, the finish date cannot be determined.
The finish date would lie outwith the factory calendar.
System Response
The planning of the material would be terminated.
Procedure
Check the factory calendar and the in-house production time or the planned delivery time of the material.