SAP ABAP Message Class 61 Message Number 223 (Do not maintain time interpretation and scheduling together)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class 61  
Short Description Error Messages for MRP    
Message Number 223  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Do not maintain time interpretation and scheduling together
Help Document

Diagnosis

The function "Interpretation of points of time in the calendar" cannot be combined with sceduling.

System Response

You can use scheduling to determine that the beginning of the period or the end of the period are interpreted as availability dates for period lot-sizes - as opposed to the default that the first requirement within the period is interpreted as the availability date.

As this involves the scheduling of the availability date, this indicator cannot be combined with the indicator for the "Time interpretation for calendar as delivery dates".

Procedure

History
Last changed on/by 20131127  SAP 
SAP Release Created in