SAP ABAP Message Class 61 Message Number 223 (Do not maintain time interpretation and scheduling together)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class | 61 | ||
Short Description | Error Messages for MRP | ||
Message Number | 223 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Do not maintain time interpretation and scheduling together
Help Document
Diagnosis
The function "Interpretation of points of time in the calendar" cannot be combined with sceduling.
System Response
You can use scheduling to determine that the beginning of the period or the end of the period are interpreted as availability dates for period lot-sizes - as opposed to the default that the first requirement within the period is interpreted as the availability date.
As this involves the scheduling of the availability date, this indicator cannot be combined with the indicator for the "Time interpretation for calendar as delivery dates".
Procedure
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |