SAP ABAP Message Class 61 Message Number 250 (Error calculating the period of adjustment for demand management)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class 61  
Short Description Error Messages for MRP    
Message Number 250  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Error calculating the period of adjustment for demand management
Help Document

Diagnosis

In Customizing, a period of adjustment of workdays is specified for the MRP group of this material. The system adds this number to the current date to determine the end of the period of adjustment. An error occurred during this calculation: the end of the period of adjustment not within the validity of the factory calendar.

System Response

The system terminated the planning of the material.

Procedure

Maintain the factory calendar far enough in the past and/or in the future or reduce the period of adjustment of the material.

History
Last changed on/by 20131127  SAP 
SAP Release Created in