SAP ABAP Message Class 61 Message Number 141 (Material cannot be processed with this transaction)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class | 61 | ||
Short Description | Error Messages for MRP | ||
Message Number | 141 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Material cannot be processed with this transaction
Help Document
Diagnosis
The material you would like to plan using the MRP run has been defined as a master schedule item. You can only plan master schedule items using the planning run for master schedule items.
System Response
Procedure
If you would like to plan the material, choose Logistics -> Production -> Production Planning -> MPS -> MPS and then choose a type of planning run.
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |