SAP ABAP Message Class 61 Message Number 593 (No scheduling allowed)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-MRP-BD (Application Component) Master Data
⤷
MD0C (Package) Customizing R/3 Material Requirements Planning

⤷

⤷

Attribute
Message class | ![]() |
61 | |
Short Description | ![]() |
Error Messages for MRP | |
Message Number | ![]() |
593 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
Message Text
No scheduling allowed
Help Document
Diagnosis
According to the scheduling levels in Customizing, no scheduling is allowed for this order/these orders.
System Response
Procedure
The scheduling levels (detailed, prod.rate, rough-cut) are maintained in Customizing in the MRP menu.
They depend on:
- the order group (here: "planned order"),
- the order type of the planned order as well as,
- the production scheduler, that must be allocated in the material master.
The indicator for scheduling must also be selected for the chosen scheduling level.
History
Last changed on/by | ![]() |
20131127 | SAP |
SAP Release Created in |