SAP ABAP Message Class 61 Message Number 593 (No scheduling allowed)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-MRP-BD (Application Component) Master Data
⤷
MD0C (Package) Customizing R/3 Material Requirements Planning
⤷
⤷
Attribute
| Message class | 61 | ||
| Short Description | Error Messages for MRP | ||
| Message Number | |
593 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On |
Message Text
No scheduling allowed
Help Document
Diagnosis
According to the scheduling levels in Customizing, no scheduling is allowed for this order/these orders.
System Response
Procedure
The scheduling levels (detailed, prod.rate, rough-cut) are maintained in Customizing in the MRP menu.
They depend on:
- the order group (here: "planned order"),
- the order type of the planned order as well as,
- the production scheduler, that must be allocated in the material master.
The indicator for scheduling must also be selected for the chosen scheduling level.
History
| Last changed on/by | 20131127 | SAP | |
| SAP Release Created in |