SAP ABAP Message Class 61 Message Number 593 (No scheduling allowed)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class 61  
Short Description Error Messages for MRP    
Message Number 593  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
No scheduling allowed
Help Document

Diagnosis

According to the scheduling levels in Customizing, no scheduling is allowed for this order/these orders.

System Response

Procedure

The scheduling levels (detailed, prod.rate, rough-cut) are maintained in Customizing in the MRP menu.

They depend on:

  • the order group (here: "planned order"),
  • the order type of the planned order as well as,
  • the production scheduler, that must be allocated in the material master.

The indicator for scheduling must also be selected for the chosen scheduling level.