SAP ABAP Message Class 61 Message Number 470 (Validity period start lies brfore version validity date &)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
Attribute
Message class | 61 | ||
Short Description | Error Messages for MRP | ||
Message Number | 470 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Validity period start lies brfore version validity date &
Help Document
Diagnosis
The run-time start cannot lie before the beginning of the validity period of the production version. It is possible that you have not entered a date.
System Response
Procedure
Select a run-time start that lies within the period that the production version is valid.
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |