Data Element list used by SAP ABAP Table PPEGI_FCAT (iPPE Workbench Field Catalog)
SAP ABAP Table
PPEGI_FCAT (iPPE Workbench Field Catalog) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AS4FLAG | Flag (X or Blank) | ||
| 2 | AUFNR | Order Number | ||
| 3 | BESKZ | Procurement Type | ||
| 4 | CC_AEFUN | Change number function | ||
| 5 | CC_CCDAT | Valid-From Date | ||
| 6 | CC_RLKEY | Release Key for Change Master Record | ||
| 7 | CHAR4 | Not More Closely Defined Area, Possibly Used for Patchlevels | ||
| 8 | CHAR4 | Not More Closely Defined Area, Possibly Used for Patchlevels | ||
| 9 | CHAR4 | Not More Closely Defined Area, Possibly Used for Patchlevels | ||
| 10 | CHAR40 | Character field of length 40 | ||
| 11 | CO_PRZNR | Business Process | ||
| 12 | DATUM | Date | ||
| 13 | DATUM | Date | ||
| 14 | EKORG | Purchasing organization | ||
| 15 | ESOKZ | Purchasing info record category | ||
| 16 | INFNR | Number of purchasing info record | ||
| 17 | KOSTL | Cost Center | ||
| 18 | KSTAR | Cost Element | ||
| 19 | LOGSYS | Logical system | ||
| 20 | LSTAR | Activity Type | ||
| 21 | LTXA1 | Operation short text | ||
| 22 | PPE_ACTTYPE | iPPE Activity Type | ||
| 23 | PPE_ACTTYPE_DESC | Description of Activity Type | ||
| 24 | PPE_AETIME | Time of Last Change | ||
| 25 | PPE_APPLOBJ_TYPE | iPPE Application Object Type | ||
| 26 | PPE_ARC_MODE | Archiving Status | ||
| 27 | PPE_BALANCED | Activity Included in the Line Balance | ||
| 28 | PPE_BASEUNIT | Base Unit of Measure (Material) | ||
| 29 | PPE_BUFTIME_MAX | Maximum Retention Period in a Buffer | ||
| 30 | PPE_BUFTIME_MIN | Minimum Retention Period in a Buffer | ||
| 31 | PPE_CAPACITY | Capacity Requirements | ||
| 32 | PPE_CAPAPLNG_ICON | Capacity Planning Allowed - Icon Symbol | ||
| 33 | PPE_CAPUNIT | Unit of Capacity Requirements | ||
| 34 | PPE_CLASS | Class Number | ||
| 35 | PPE_CODATA_ICON | Controlling Data Exists - Icon Symbol | ||
| 36 | PPE_CYCLE_BALANCE | Takt Offset | ||
| 37 | PPE_DEPENDENCY | Object Dependencies in Customer Syntax | ||
| 38 | PPE_DOKAR | Document Type | ||
| 39 | PPE_DOKNR | Document Number | ||
| 40 | PPE_DOKST | Document Status | ||
| 41 | PPE_DOKTL_D | Document Part | ||
| 42 | PPE_DOKVR | Document Version | ||
| 43 | PPE_DURATION | Duration | ||
| 44 | PPE_DURATION_FIX | Fixed Duration | ||
| 45 | PPE_DWNAM | Person Responsible | ||
| 46 | PPE_HDR_DATE_HIGH | Valid To Date (PV) | ||
| 47 | PPE_HDR_DELFLG | Delete Production Version | ||
| 48 | PPE_HDR_QUANT_HI | Maximum Lot Size (PV) | ||
| 49 | PPE_HDR_QUANT_LO | Minimum Lot Size (PV) | ||
| 50 | PPE_HDR_QUNIT | Unit of Measure (PV) | ||
| 51 | PPE_KLASSENART | Class Type | ||
| 52 | PPE_LBWDUR | Line Balance: Weighted, Average Duration of an Activity | ||
| 53 | PPE_LOCID_EXTERNAL | External Description of the Plant in iPPE | ||
| 54 | PPE_MATERIAL_LONG | Long External Material Number | ||
| 55 | PPE_MAX_BREAK_TUNIT | Unit for Short Break | ||
| 56 | PPE_MAX_BREAK_USE | Use Maximum Possible Break | ||
| 57 | PPE_MAX_SHORT_BREAK | Maximum Duration of a Short Break | ||
| 58 | PPE_MMP_ALLOWED_ICON | Model Mix Planning Allowed | ||
| 59 | PPE_MODEPRIORITY | Priority for Mode Selection | ||
| 60 | PPE_OPR_SCRAP | Activity Scrap (%) | ||
| 61 | PPE_OTYPE_DESC | iPPE Object Type (Description) | ||
| 62 | PPE_PREPAREGRP | Setup Group | ||
| 63 | PPE_PRESTYPE_ICON | Operating Faclity Type - Icon Symbol | ||
| 64 | PPE_REL_AENNR | Change Number for iPPE Relationship | ||
| 65 | PPE_REL_DELFLG | Deletion Indicator for iPPE Relationship | ||
| 66 | PPE_RESNAME | External Key for Resource (Resource Name) | ||
| 67 | PPE_RESOURCE_TYPE | Resource Type of the Planning Resource | ||
| 68 | PPE_RESQUANT | Number of Production Resources | ||
| 69 | PPE_RESQUNIT | Unit of Measure for Production Resource | ||
| 70 | PPE_SCSID | Status | ||
| 71 | PPE_SCSVAL | Status Value | ||
| 72 | PPE_SICONGI | Icon for iPPE Status, Navigation Area | ||
| 73 | PPE_SPECIAL_PROC_TYPE | Special Procurement Type in iPPE | ||
| 74 | PPE_SRESPONSIBLE | Person Responsible for iPPE Status Object | ||
| 75 | PPE_STARGETDATE | Target Date of iPPE Status | ||
| 76 | PPE_STDALT | Standard Mode | ||
| 77 | PPE_STD_ACT | iPPE Standard Activity | ||
| 78 | PPE_TADUR_B | Gross Time of the Time Analysis in 1/100 Second | ||
| 79 | PPE_TADUR_CODE | Code for the Time Analysis | ||
| 80 | PPE_TADUR_N | Net Time of the Time Analysis in 1/100 Sec. | ||
| 81 | PPE_TEXT60 | Description for Object | ||
| 82 | PPE_TIMEUNIT | Time Unit | ||
| 83 | PPE_TIME_OFFER | Resource Capacity of a Line Object in Seconds | ||
| 84 | PPE_TUNIT | Time Unit | ||
| 85 | PPE_TUNIT | Time Unit | ||
| 86 | PPE_VWEA | Standard Value Determination Type | ||
| 87 | PPE_WORKLOAD | Percentage Utilization of a Line Object | ||
| 88 | PPE_WORKLOAD_ICON | Percentage Utilization of a Line Object - Icon Symbol | ||
| 89 | PS_AKSTL | Requesting cost center | ||
| 90 | PS_POSNR | WBS Element | ||
| 91 | PS_PSPID | Project definition | ||
| 92 | PVS_ADDSETS | iPPE Sets: Additional Undocumented Sets Exist | ||
| 93 | PVS_AEDAT | Date of Last Change | ||
| 94 | PVS_AENAM | Name of Person Who Changed Object | ||
| 95 | PVS_AENNR | Change Number in iPPE | ||
| 96 | PVS_ALTGRP | Alternative Item Group | ||
| 97 | PVS_ALTNUM | Alternative of an iPPE Node | ||
| 98 | PVS_ANDAT | Date of Application | ||
| 99 | PVS_ANNAM | User who created record | ||
| 100 | PVS_COL_CODE | Color Supplement Key | ||
| 101 | PVS_DELFLG | Deletion Indicator | ||
| 102 | PVS_DOK_IN_CAX_ICON | Icon DOK_IN_CAX | ||
| 103 | PVS_IN_CAX_ICON | IN_CAX Icon | ||
| 104 | PVS_KNOBJ_PRIO | Priority of Object Dependencies | ||
| 105 | PVS_LATEST_VERSION | Last Document Version | ||
| 106 | PVS_LOCKED_ICON | Icon for the Lock Indicator | ||
| 107 | PVS_MARK_DMU | DMU Selection Column | ||
| 108 | PVS_OTYPE | iPPE Object Type | ||
| 109 | PVS_PLNG_SGMT | Planning Segment for Repetitive Manufacturing | ||
| 110 | PVS_PNODE | iPPE Node Description | ||
| 111 | PVS_PRIO | Evaluation of Priority at Variants | ||
| 112 | PVS_PRVBE | Production Supply Area | ||
| 113 | PVS_QUANT | Quantity (in Component Variant) | ||
| 114 | PVS_QUNIT | Unit of Measure | ||
| 115 | PVS_RFORM | Formula Key | ||
| 116 | PVS_ROKME | Unit of Measure for Variable-Size Component | ||
| 117 | PVS_ROMEN | Quantity of Variable-Size Item | ||
| 118 | PVS_ROMS1 | Size 1 | ||
| 119 | PVS_ROMS2 | Size 2 | ||
| 120 | PVS_ROMS3 | Size 3 | ||
| 121 | PVS_RPNAME | Action Point | ||
| 122 | PVS_RPNAME | Action Point | ||
| 123 | PVS_RPNAME | Action Point | ||
| 124 | PVS_RPTYPE | Type of Reporting Point | ||
| 125 | PVS_SLFREE | Assembly Item Allowed Without Assignment to a Node | ||
| 126 | PVS_SLMAND | Required Component | ||
| 127 | PVS_SLMULT | Multiple Selection Allowed | ||
| 128 | PVS_STDVAR | Indicator for Standard Variant | ||
| 129 | PVS_TAKTS | Number of Takts on a Line/Line Segment | ||
| 130 | PVS_VSI_PRCNT | Percentage Rate for Rounding Size Up or Down | ||
| 131 | PVS_VSI_PRCNT | Percentage Rate for Rounding Size Up or Down | ||
| 132 | PVS_VSI_PRCNT | Percentage Rate for Rounding Size Up or Down | ||
| 133 | RLMFW_TARGET | Release Target | ||
| 134 | ROMEI | Unit of measure for sizes 1 to 3 | ||
| 135 | TEXT60 | Text Field of Length 60 | ||
| 136 | VORNR | Operation/Activity Number | ||
| 137 | XFELD | Checkbox | ||
| 138 | XFELD | Checkbox | ||
| 139 | XFELD | Checkbox | ||
| 140 | XFELD | Checkbox | ||
| 141 | XFELD | Checkbox | ||
| 142 | XFELD | Checkbox |