SAP ABAP Data Element CC_AEFUN (Change number function)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
Basic Data
Data Element | CC_AEFUN |
Short Description | Change number function |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CC_AEFUN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Function |
Medium | 15 | Function |
Long | 20 | Function |
Heading | 3 | Fct |
Documentation
Definition
Determination of the task that copies the change master record to the change process.
Use
The change master record function determines, for example,
- which data is processed
- whether change objects (for example, BOMs, task lists) can be processed with reference to the change master record
Procedure
Examples
The following functions are supported:
- Change number release indicator (Blank)
Change master record that is automatically released for later application areas (no release procedure)
- Change number with release indicator (Value: 1)
Change master record that you release for later application areas, using a release procedure
- Change package (Value: 2)
- Change master record that controls the individual object changes in the change process
- Determines how and which change objects should be processed
- Allocation ti a change package is essential
- Leading change master record (Value: 3)
- Change master record that groups together several change packages in the change process
- Determines when the change should take effect (Date Valid- from)
- You cannot process the change objects
- You cannot create an ECR or an ECO with the Leading change master record function.
Dependencies
History
Last changed by/on | SAP | 20020827 |
SAP Release Created in |