Data Element list used by SAP ABAP Table CIFRESTMPMORDER (PM order structure including base equipment)
SAP ABAP Table CIFRESTMPMORDER (PM order structure including base equipment) is using
# Object Type Object Name Object Description Note
     
1 Data Element  /CUM/AUEST CU: Automatic Copy of Estimated Costs
2 Data Element  /CUM/CMNUM CU: Construction Measure Number
3 Data Element  /CUM/DESGUID CU: GUID of Design Document
4 Data Element  /CUM/DESNUM CU: Design Number
5 Data Element  /CUM/INDCU CU: Order is Used for Compatible Units
6 Data Element  /CUM/INTCUNR CU: Internal CU Number in a Work Order
7 Data Element  /ISDFPS/MEQUI Master Equipment
8 Data Element  ABCKZ ABC Indicator for Technical Object
9 Data Element  ABGR_SCHL Results Analysis Key
10 Data Element  ABNUM Maintenance Plan Call Number
11 Data Element  ADDAT PM Order: Reference Date
12 Data Element  ADDCOMPARE_CORE Reference Element PM/PS
13 Data Element  ADUHR Time of Reference Date
14 Data Element  AD_ADDRNUM Address number
15 Data Element  AEKNZ Change indicator
16 Data Element  AEKNZ Change indicator
17 Data Element  AEKNZ Change indicator
18 Data Element  AEKNZ Change indicator
19 Data Element  AENNR Change Number
20 Data Element  AENNR Change Number
21 Data Element  AENNR Change Number
22 Data Element  AKKNZ Order Category Indicator Plant Maintenance
23 Data Element  AM_UMWKZ Reason for environmental investment
24 Data Element  ANING Name of Person Reponsible for System
25 Data Element  ANLBD Date until which the system is available
26 Data Element  ANLBZ Time until which the system is available
27 Data Element  ANLN1 Main Asset Number
28 Data Element  ANLN2 Asset Subnumber
29 Data Element  ANLVD Date from which the system is available
30 Data Element  ANLVZ Time from Which System is Available
31 Data Element  ANLZU Syst.Condition
32 Data Element  AP_KTEXT Short text for the work center
33 Data Element  ARTPR Priority Type
34 Data Element  ATRKZ Request ID
35 Data Element  AUFABKRS Processing group
36 Data Element  AUFAEDAT Change date for Order Master
37 Data Element  AUFAENAM Last changed by
38 Data Element  AUFART Order Type
39 Data Element  AUFERFDAT Created on
40 Data Element  AUFERFNAM Entered by
41 Data Element  AUFIDAT2 Technical completion date
42 Data Element  AUFKALSM Costing Sheet
43 Data Element  AUFKOSTV Responsible cost center
44 Data Element  AUFKSTAR Settlement cost element
45 Data Element  AUFLOEKZ Deletion flag
46 Data Element  AUFLTEXT Long Text Exists
47 Data Element  AUFNR Order Number
48 Data Element  AUFNR Order Number
49 Data Element  AUFREFNR Reference order number
50 Data Element  AUFSOWRK Location plant
51 Data Element  AUFSTKZ Identifier for statistical order
52 Data Element  AUFTEXT Description
53 Data Element  AUFTYP Order category
54 Data Element  AUFUSER4 Estimated total costs of order
55 Data Element  AUFWAERS Order Currency
56 Data Element  AUFZSCHL Overhead key
57 Data Element  AUF_PLKNZ Maintenance order planning indicator
58 Data Element  AWSLS Variance Key
59 Data Element  BASMN Base quantity
60 Data Element  BAUTL Assembly
61 Data Element  BEBER Organizational Area
62 Data Element  BEDID ID of the capacity requirements record
63 Data Element  BEDID ID of the capacity requirements record
64 Data Element  BEDID ID of the capacity requirements record
65 Data Element  BEMOT Accounting Indicator
66 Data Element  BREAKS Indicator: Scheduling allowing for breaks
67 Data Element  BUKRS Company Code
68 Data Element  BUKRS Company Code
69 Data Element  CADNR Addresses: Address Number
70 Data Element  CCKEY Cost collector key
71 Data Element  CCOBJID Object ID
72 Data Element  CC_CONF_KEY Identical object
73 Data Element  CFB_ADTDAYS Additional Days
74 Data Element  CFB_BBD_PPPI Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED)
75 Data Element  CFB_DATOFM Date of Manufacture
76 Data Element  CIFMETHOD Method to be Executed During the Transfer of an Object
77 Data Element  CIM_COUNT Internal counter
78 Data Element  CIM_COUNT Internal counter
79 Data Element  CIM_COUNT Internal counter
80 Data Element  CKML_F_PROCNR Production Process
81 Data Element  CKML_PROZESS_TYP Process Category (Procurement/Consumption)
82 Data Element  CN_COSTUPD Costs are updated
83 Data Element  COMP_CALC Indicator: Components will not be costed
84 Data Element  CO_ABARB Confirmation: Degree of processing
85 Data Element  CO_APLZL General counter for order
86 Data Element  CO_APRIO Order priority
87 Data Element  CO_AUFLD Date of BOM Explosion/Routing Transfer
88 Data Element  CO_AUFPL Routing number of operations in the order
89 Data Element  CO_AUFPL Routing number of operations in the order
90 Data Element  CO_AUFPL Routing number of operations in the order
91 Data Element  CO_CHG_TIME Changed at
92 Data Element  CO_COLORDPRC Collective order with/without automatic goods movement
93 Data Element  CO_DISPO MRP controller for the order
94 Data Element  CO_FTRMI Actual release date
95 Data Element  CO_FTRMP Planned release date
96 Data Element  CO_FTRMS Scheduled release date
97 Data Element  CO_FTRPS Scheduled release date (forecast)
98 Data Element  CO_GETRI Confirmed Order Finish Date
99 Data Element  CO_GEUZI Confirmed order finish (time)
100 Data Element  CO_GLTPP Finish date (forecast)
101 Data Element  CO_GLTPS Scheduled forecast finish
102 Data Element  CO_GLTRI Actual finish date
103 Data Element  CO_GLTRP Basic finish date
104 Data Element  CO_GLTRS Scheduled finish
105 Data Element  CO_GLUPP Forecast finish (time)
106 Data Element  CO_GLUPS Scheduled forecast finish time
107 Data Element  CO_GLUZP Basic finish (time)
108 Data Element  CO_GLUZS Scheduled finish time
109 Data Element  CO_GMEIN Common unit of measure for all order items
110 Data Element  CO_GSTPP Forecast start date
111 Data Element  CO_GSTPS Scheduled forecast start
112 Data Element  CO_GSTRI Actual start date
113 Data Element  CO_GSTRP Basic start date
114 Data Element  CO_GSTRS Scheduled start
115 Data Element  CO_GSUPP Forecast start (time)
116 Data Element  CO_GSUPS Scheduled start time (Forecast)
117 Data Element  CO_GSUZI Actual start time
118 Data Element  CO_GSUZP Basic start time
119 Data Element  CO_GSUZS Scheduled Start (Time)
120 Data Element  CO_IASMG Scrap confirmed for order
121 Data Element  CO_IGMNG Yield confirmed from order confirmation
122 Data Element  CO_KSTEMPF Indicator: Direct cost collector
123 Data Element  CO_LAUFNR Leading order in current processing
124 Data Element  CO_LKNOT Left node in collective order
125 Data Element  CO_MES_INT_ROUTINGID Key of a Routing from an ME System
126 Data Element  CO_MES_MAX_GAMNG Maximum Value of Total Order Quantity After Distribution
127 Data Element  CO_MLTPS Order with multiple items
128 Data Element  CO_NAUCOST Indicator: Do not cost automatically
129 Data Element  CO_NAUTERM Indicator: Do not schedule automatically
130 Data Element  CO_NOPCOST Do not calculate planned costs for order
131 Data Element  CO_PENDD Outline finish of collective order (date)
132 Data Element  CO_PENDT Outline finish time
133 Data Element  CO_PLAUF Date for routing transfer
134 Data Element  CO_POSNR Order item number
135 Data Element  CO_PRODNET Indicator: Order is part of collective order
136 Data Element  CO_PRODPRF Production Scheduling Profile
137 Data Element  CO_PSTARTD Outline start of collective network (date)
138 Data Element  CO_PSTARTT Start time of a collective order
139 Data Element  CO_RKNOT Right node of a collective order
140 Data Element  CO_RUECK Completion confirmation number for the operation
141 Data Element  CO_TEILNET Number of superior network
142 Data Element  CO_UPTER Indicator: Change to Scheduled Dates
143 Data Element  CR_OBJID Object ID of the resource
144 Data Element  CR_OBJID Object ID of the resource
145 Data Element  CR_OBJTY Object types of the CIM resource
146 Data Element  CR_OBJTY Object types of the CIM resource
147 Data Element  CR_OBJTY Object types of the CIM resource
148 Data Element  CSPLIT Apportionment structure
149 Data Element  CUOBJ Configuration (internal object number)
150 Data Element  CY_SEQNR Seq. number order
151 Data Element  C_TIME Time created
152 Data Element  DATAN Date of Technical Inspection
153 Data Element  DATUV Valid-From Date
154 Data Element  DATUV Valid-From Date
155 Data Element  DAUFN Standing order number
156 Data Element  DEVICEID Additional Device Data
157 Data Element  DZKRIZ Counter for additional criteria
158 Data Element  EQFNR Sort Field
159 Data Element  EQUNR Equipment Number
160 Data Element  EQUNR Equipment Number
161 Data Element  FEVOR Production Supervisor
162 Data Element  FHORI Scheduling Margin Key for Floats
163 Data Element  FKBER Functional Area
164 Data Element  FLG_AOB Indicator: relationships
165 Data Element  FLG_ARBEI Indicator: Default value work is relevant
166 Data Element  FREIZ Release period (in days)
167 Data Element  GAMNG Total order quantity
168 Data Element  GASMG Total scrap quantity in the order
169 Data Element  GAUZT Planned downtime in hours
170 Data Element  GERNR Serial Number
171 Data Element  GEWRK Main work center for maintenance tasks
172 Data Element  GSBER Business Area
173 Data Element  GSBER Business Area
174 Data Element  HISDA PM request: History date
175 Data Element  HISTU Level (in Multi-Level BOM Explosions)
176 Data Element  ILA Maintenance activity type
177 Data Element  ILOAI ILOA Individual
178 Data Element  ILOAN Location and account assignment for technical object
179 Data Element  ILOM_OWNER Object reference indicator
180 Data Element  IM_ABUKRS Requesting company code
181 Data Element  IM_PROFIL Investment measure profile
182 Data Element  IM_SIZECL Scale of investment objects
183 Data Element  INGRP Planner Group for Customer Service and Plant Maintenance
184 Data Element  INNAM Name of the Maintenance Planner Group
185 Data Element  INSPK Name of Person Responsible for Technical Inspection
186 Data Element  IWERK Maintenance Planning Plant
187 Data Element  IWERK Maintenance Planning Plant
188 Data Element  IZWEK Reason for investment
189 Data Element  JV_ETYPE Equity type
190 Data Element  JV_JIBCL JIB/JIBE Class
191 Data Element  JV_JIBSA JIB/JIBE Subclass A
192 Data Element  JV_NAME Joint venture
193 Data Element  JV_OR_CO JV original cost object
194 Data Element  JV_OTYPE Joint Venture Object Type
195 Data Element  JV_RECIND Recovery Indicator
196 Data Element  J_OBJNR Object number
197 Data Element  J_OBJNR Object number
198 Data Element  J_STSMA Status Profile
199 Data Element  KALKVARIST Costing variant for actual costs
200 Data Element  KALKVARPLN Costing variant for planned costs
201 Data Element  KALSMA_CH Search procedure for batch determination
202 Data Element  KALSN Calendar Selection for Order
203 Data Element  KAPPL Application
204 Data Element  KAPVERSA Version of Available Capacity
205 Data Element  KBED_D Ind: do not create capacity requirements
206 Data Element  KDAUF Sales Order Number
207 Data Element  KDPOS Item number in Sales Order
208 Data Element  KOKRS Controlling Area
209 Data Element  KOKRS Controlling Area
210 Data Element  KOSTL Cost Center
211 Data Element  KUNUM Customer Number
212 Data Element  KVEWE Usage of the Condition Table
213 Data Element  LAUFN Order number
214 Data Element  LGWID Object ID of the Work Center
215 Data Element  LOSBS To Lot Size
216 Data Element  LOSDIV Lot size divisor
217 Data Element  LOSGRBIS To lot size
218 Data Element  LOSGRVON From Lot Size
219 Data Element  LOSVN From Lot Size
220 Data Element  LZEIH Unit for maximum storage period
221 Data Element  MANDT Client
222 Data Element  MATNR Material Number
223 Data Element  MATNR Material Number
224 Data Element  MATNR Material Number
225 Data Element  MAUEH Unit for Breakdown Duration
226 Data Element  MAUFNR Number of superior order
227 Data Element  MAXLZ Maximum storage period
228 Data Element  MEINS Base Unit of Measure
229 Data Element  NETZKONT Indicator for the account assignment of a network(hdr/act.)
230 Data Element  NO_DISP_PLUS Effective for Materials Planning
231 Data Element  OBJEKTID Object ID
232 Data Element  OBJKNR Object list number
233 Data Element  OCM_CH_PROC Process that has lead to the change of an object
234 Data Element  OCM_COMP_RES OCM: Result of comparison of two order objects
235 Data Element  OCM_OBJ_TYPE Change indicator
236 Data Element  PKOSA_D Cost collector for production process PROCNR
237 Data Element  PLGKZ Identifier for planning with line items
238 Data Element  PLNAL Group Counter
239 Data Element  PLNAW Application of the task list
240 Data Element  PLNME Task list unit of measure
241 Data Element  PLNNR Key for Task List Group
242 Data Element  PLNTY Task List Type
243 Data Element  PLN_VERWE Task list usage
244 Data Element  PLVAR Plan Version
245 Data Element  PM_ABR_FLG Flag: Maintenance plan call
246 Data Element  PM_OBJTY Object Type of CIM Resources for Work Center
247 Data Element  PM_PHASE Maintenance Processing Phase
248 Data Element  PM_PRT_FLG Indicator: Order Printing Requested
249 Data Element  PM_WO_FLG Indicator: Order Creation from PM Notification
250 Data Element  POSNR Item number of the SD document
251 Data Element  POSNR Item number of the SD document
252 Data Element  PPSID Object ID of PP work center
253 Data Element  PRCTR Profit Center
254 Data Element  PRIOK Priority
255 Data Element  PROFIDNZPL Network profile
256 Data Element  PS_AKSTL Requesting cost center
257 Data Element  PS_KZERB Indicator: Project summarization
258 Data Element  PS_PLART Basis for scheduling
259 Data Element  PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
260 Data Element  PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
261 Data Element  PS_PSP_PRO Project definition
262 Data Element  QMNUM Message Number
263 Data Element  QPLOS Inspection Lot Number
264 Data Element  RAUMNR Room
265 Data Element  REDKZ Reduction indicator for scheduling
266 Data Element  REDKZP Reduction indicator for scheduling (forecast)
267 Data Element  REVLV Revision level
268 Data Element  REVNI Revision of Plant Maintenance and Customer Service
269 Data Element  RGEKZ Indicator: Backflush
270 Data Element  RMNGA Total confirmed rework quantity
271 Data Element  RSNUM Number of reservation/dependent requirements
272 Data Element  RSNUM Number of reservation/dependent requirements
273 Data Element  RSORD Refurbishment order indicator (PM)
274 Data Element  RSUPG Upgrade Order Indicator
275 Data Element  SCOPE_CV Object Class
276 Data Element  SCRTP Scenario or Subscreen Category
277 Data Element  SICHZ Float after production (in days)
278 Data Element  SICHZ_TRM Scheduled float after production in days
279 Data Element  SPART Division
280 Data Element  SPLIT_STAT Status of an order in a split hierarchy
281 Data Element  STALT Alternative BOM
282 Data Element  STLAN BOM Usage
283 Data Element  STLST BOM Statuses
284 Data Element  STLTY BOM Category
285 Data Element  STNUM Bill of Material
286 Data Element  STORT Asset location
287 Data Element  SWERK Maintenance Plant
288 Data Element  SYSUUID_X UUID in X form (binary)
289 Data Element  TERHW Scheduling note from order scheduling
290 Data Element  TERMKZ Scheduling type
291 Data Element  TERMKZP Scheduling type (forecast)
292 Data Element  TPLNR Functional Location
293 Data Element  TPLNR Functional Location
294 Data Element  TRMDT Date of the last scheduling
295 Data Element  TXJCD Tax Jurisdiction
296 Data Element  UII_CHAR72 Unique Item Identifier
297 Data Element  VAGRP Responsible planner group/department
298 Data Element  VAGRP Responsible planner group/department
299 Data Element  VBELN Sales and Distribution Document Number
300 Data Element  VKORG Sales Organization
301 Data Element  VORGZ Float before production (in days)
302 Data Element  VORGZ_TRM Scheduled float before production in days
303 Data Element  VSNMR_V Sales document version number
304 Data Element  VTWEG Distribution Channel
305 Data Element  WAPOS Maintenance item
306 Data Element  WARPL Maintenance Plan
307 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
308 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
309 Data Element  WERGW Plant associated with main work center
310 Data Element  WERKS_D Plant
311 Data Element  WFCID Factory Calendar