SAP ABAP Table ACC_CYDETAIL_STY (Details Capacity Evaluation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Table Category INTTAB    Structure 
Structure ACC_CYDETAIL_STY   Table Relationship Diagram
Short Description Details Capacity Evaluation    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 .INCLUDE       0   0   Detail list in leveling  
2 .INCLUDE       0   0   Fields of the detailed capacity list  
3 WERKS WERKS_D WERKS CHAR 4   0   Plant *
4 ARBPL ARBPL ARBPL CHAR 8   0   Work center  
5 KAPAR KAPART KAPART CHAR 3   0   Capacity category *
6 PERIOD ACC_CYPERIOD SYDATS DATS 8   0   Planning period for enhanced evaluation (ACC)  
7 BED_VERUR BED_VERUR AUFNR CHAR 12   0   Pegged requirements (work- or planned order) as type char. *
8 VORNR CY_VORNR CHAR4 CHAR 4   0   Operation number  
9 AUART CY_AUFART AUFART CHAR 4   0   Category of pegged requirement *
10 BED_MENGE BED_GSMNG MENG13 QUAN 13   3   Order quantity displayed in a list  
11 BED_EINH ACC_BEDEINH MEINS UNIT 3   0   Unit of measure for pegged requirements quantity (Acc) *
12 APRIO CO_APRIO CHAR1 CHAR 1   0   Order priority  
13 BEDARF CY_RBEDARF MENG15 QUAN 15   3   Remaining capacity requirements  
14 LIEINH CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
15 SSTAD SSTAD DATUM DATS 8   0   Latest start / date  
16 SENDD SENDD DATUM DATS 8   0   Latest finish / date  
17 KRUESOLL ACC_CYKRUESOL DEC20_3 DEC 20   3   Set up scheduled cap. rqmts for operation segment (Acc)  
18 KRUEREST ACC_CYKRUERES DEC20_3 DEC 20   3   Set up remaining cap. rqmts for operation segment (Acc)  
19 KBEASOLL ACC_CYKBEASOL DEC20_3 DEC 20   3   Scheduled cap. requirements for the op. segment "processing"  
20 KBEAREST ACC_CYKBEARES DEC20_3 DEC 20   3   Process remaining capacity rqmts for operation segment (Acc)  
21 KABRSOLL ACC_CYKABRSOL DEC20_3 DEC 20   3   Scheduled cap. requirements for the op. segment teardown  
22 KABRREST ACC_CYKABRRES DEC20_3 DEC 20   3   Tear down remaining cap. rqmts for operation segment (Acc)  
23 KEINH CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
24 FSTAD FSTAD DATUM DATS 8   0   Earliest start / date  
25 FSTAU FSTAU T TIMS 6   0   Earliest start / time  
26 FENDD FENDD DATUM DATS 8   0   Earliest finish /date  
27 FENDU FENDU T TIMS 6   0   Earliest finish /time  
28 SSTAU SSTAU T TIMS 6   0   Latest start / time  
29 SENDU SENDU T TIMS 6   0   Latest finish / time  
30 ISTAD ISTAD DATUM DATS 8   0   Actual start / date  
31 ISTAU ISTAU T TIMS 6   0   Actual start / time  
32 IENDD IENDD DATUM DATS 8   0   Actual finish / date  
33 IENDU IENDU T TIMS 6   0   Actual finish / time  
34 KPVER CR_VERTL CR_VERTL CHAR 8   0   Distribution of capacity requirements (Planned/prod.order) *
35 FSAVD CY_FSAVD DATUM DATS 8   0   Earliest scheduled start: Execution (date)  
36 FSAVZ CY_FSAVZ ATIME TIMS 6   0   Earliest scheduled start: Execution (time)  
37 FSSBD CY_FSSBD DATUM DATS 8   0   Earliest scheduled start: Processing (date)  
38 FSSBZ CY_FSSBZ ATIME TIMS 6   0   Earliest scheduled start: Processing (time)  
39 FSSAD CY_FSSAD DATUM DATS 8   0   Earliest scheduled start: Teardown (date)  
40 FSSAZ CY_FSSAZ ATIME TIMS 6   0   Earliest scheduled start: Teardown (time)  
41 FSEDD CY_FSEDD DATUM DATS 8   0   Earliest scheduled finish: Execution (date)  
42 FSEDZ CY_FSEDZ ATIME TIMS 6   0   Earliest scheduled finish: Execution (time)  
43 FSSLD CY_FSSLD DATUM DATS 8   0   Earliest scheduled start: Wait (date)  
44 FSSLZ CY_FSSLZ ATIME TIMS 6   0   Earliest scheduled start: Wait (time)  
45 FSELD CY_FSELD DATUM DATS 8   0   Earliest scheduled finish: Wait (date)  
46 FSELZ CY_FSELZ ATIME TIMS 6   0   Earliest scheduled finish: Wait (time)  
47 SSAVD CY_SSAVD DATUM DATS 8   0   Latest scheduled start: Execution (date)  
48 SSAVZ CY_SSAVZ ATIME TIMS 6   0   Latest scheduled start: Execution (time)  
49 SSSBD CY_SSSBD DATUM DATS 8   0   Latest scheduled start: Processing (date)  
50 SSSBZ CY_SSSBZ ATIME TIMS 6   0   Latest scheduled start: Processing (time)  
51 SSSAD CY_SSSAD DATUM DATS 8   0   Latest scheduled start: Teardown (date)  
52 SSSAZ CY_SSSAZ ATIME TIMS 6   0   Latest scheduled start: Teardown (time)  
53 SSEDD CY_SSEDD DATUM DATS 8   0   Latest scheduled finish: Execution (date)  
54 SSEDZ CY_SSEDZ ATIME TIMS 6   0   Latest scheduled finish: Execution (time)  
55 SSSLD CY_SSSLD DATUM DATS 8   0   Latest scheduled start: Wait time (date)  
56 SSSLZ CY_SSSLZ ATIME TIMS 6   0   Latest scheduled start: Wait time  
57 SSELD CY_SSELD DATUM DATS 8   0   Latest scheduled finish: Wait time (date)  
58 SSELZ CY_SSELZ ATIME TIMS 6   0   Latest scheduled finish: Wait time  
59 ISDD CY_ISDD DATUM DATS 8   0   Actual start: Execution (date)  
60 ISDZ CY_ISDZ ATIME TIMS 6   0   Actual start: Execution/setup (time)  
61 IERD CY_IERD DATUM DATS 8   0   Actual finish: Setup (date)  
62 IERZ CY_IERZ ATIME TIMS 6   0   Actual finish: Setup (time)  
63 ISBD CY_ISBD DATUM DATS 8   0   Actual start: Processing (date)  
64 ISBZ CY_ISBZ ATIME TIMS 6   0   Actual start: Processing (time)  
65 IEBD CY_IEBD DATUM DATS 8   0   Actual finish: Processing (date)  
66 IEBZ CY_IEBZ ATIME TIMS 6   0   Actual finish processing (time)  
67 ISAD CY_ISAD DATUM DATS 8   0   Actual start: Teardown (date)  
68 ISAZ CY_ISAZ ATIME TIMS 6   0   Actual start: Teardown (time)  
69 IEDD CY_IEDD DATUM DATS 8   0   Actual finish: Execution (date)  
70 IEDZ CY_IEDZ ATIME TIMS 6   0   Actual finish: Execution (time)  
71 WARTZ ACC_WARTEZEIT DEC20_3 DEC 20   3   Queue time used for scheduling (Acc)  
72 WRTZE WTRZE EINHEIT UNIT 3   0   Unit of measure for queue time  
73 RUEST ACC_RUEST DEC20_3 DEC 20   3   Setup Time  
74 RSTZE RSTZE EINHEIT UNIT 3   0   Unit of measure for setup time  
75 BEARZ ACC_BEARZEIT DEC20_3 DEC 20   3   Processing Time  
76 BEAZE BEAZE EINHEIT UNIT 3   0   Unit of measure for processing time  
77 ABRUE ACC_ABRUE DEC20_3 DEC 20   3   Teardown (Acc)  
78 ARUZE ARUZE EINHEIT UNIT 3   0   Unit of measure for teardown  
79 LIEGZ ACC_LIEGEZEIT DEC20_3 DEC 20   3   Wait time used for scheduling  
80 LIGZE LIGZE EINHEIT UNIT 3   0   Unit of measure for wait time  
81 TRANZ ACC_TRANSZEIT DEC20_3 DEC 20   3   Move time used for scheduling (Acc)  
82 TRAZE TRAZE EINHEIT UNIT 3   0   Unit of measure for move time  
83 AUFNR AUFNR AUFNR CHAR 12   0   Order Number *
84 STLNR STNUM STNUM CHAR 8   0   Bill of Material  
85 DISPO CO_DISPO DISPO CHAR 3   0   MRP controller for the order *
86 FEVOR FEVOR FEVOR CHAR 3   0   Production Supervisor *
87 PVERW PLN_VERWE PLN_VERWE CHAR 3   0   Task list usage *
88 PLNAW PLNAW PLNAW CHAR 1   0   Application of the task list *
89 PLGRP VAGRP VAGRP CHAR 3   0   Responsible planner group/department *
90 FTRMP CO_FTRMP DATUM DATS 8   0   Planned release date  
91 GLTRP CO_GLTRP DATUM DATS 8   0   Basic finish date  
92 GSTRP CO_GSTRP DATUM DATS 8   0   Basic start date  
93 FTRMS CO_FTRMS DATUM DATS 8   0   Scheduled release date  
94 GLTRS CO_GLTRS DATUM DATS 8   0   Scheduled finish  
95 GSTRS CO_GSTRS DATUM DATS 8   0   Scheduled start  
96 GSTRI CO_GSTRI DATUM DATS 8   0   Actual start date  
97 GLTRI CO_GLTRI DATUM DATS 8   0   Actual finish date  
98 FTRMI CO_FTRMI DATUM DATS 8   0   Actual release date  
99 GAMNG CY_GAMNG MENG13 QUAN 13   3   Order quantity  
100 GMEIN MEINS MEINS UNIT 3   0   Base Unit of Measure *
101 AUTYP AUFTYP AUFTYP NUMC 2   0   Order category  
102 REDKZ REDKZ REDKZ CHAR 1   0   Reduction indicator for scheduling  
103 REFNR AUFREFNR AUFNR CHAR 12   0   Reference order number *
104 KTEXT CY_AUFTEXT TEXT40 CHAR 40   0   Short text for order  
105 BUKRS BUKRS BUKRS CHAR 4   0   Company Code *
106 GSBER GSBER GSBER CHAR 4   0   Business Area *
107 KOKRS KOKRS CACCD CHAR 4   0   Controlling Area *
108 CCKEY CCKEY CCKEY CHAR 23   0   Cost collector key  
109 PRONR PS_PSPID PS_PSPID CHAR 24   0   Project definition  
110 PROJN PS_POSID PS_POSID CHAR 24   0   Work Breakdown Structure Element (WBS Element)  
111 RUECK CY_RUECK CO_RUECK NUMC 10   0   Completion confirmation number for the operation  
112 CY_SEQNR CY_SEQNR CY_SEQNR NUMC 14   0   Seq. number order  
113 CY_SEQNRV CY_SEQNRV CY_SEQNR NUMC 14   0   Sequence number operation  
114 EQUNR EQUNR EQUNR CHAR 18   0   Equipment Number *
115 TPLNR TPLNR TPLNR CHAR 30   0   Functional Location *
116 QUALF QUALF QUALF CHAR 2   0   Suitability *
117 BAUTL BAUTL MATNR CHAR 18   0   Assembly *
118 ILOAN ILOAN ILOAN CHAR 12   0   Location and account assignment for technical object *
119 IWERK IWERK WERKS CHAR 4   0   Maintenance Planning Plant *
120 INGPR INGRP INGRP CHAR 3   0   Planner Group for Customer Service and Plant Maintenance *
121 APGRP VAGRP VAGRP CHAR 3   0   Responsible planner group/department *
122 KUNUM KUNUM KUNNR CHAR 10   0   Customer Number *
123 ANLBD ANLBD DATUM DATS 8   0   Date until which the system is available  
124 WARPL WARPL WARPL CHAR 12   0   Maintenance Plan *
125 LAUFN LAUFN AUFNR CHAR 12   0   Order number *
126 QMNUM QMNUM QMNUM CHAR 12   0   Message Number *
127 VAWRK WERGW WERKS CHAR 4   0   Plant associated with main work center *
128 VAPLZ GEWRK ARBPL CHAR 8   0   Main work center for maintenance tasks  
129 VATXT AP_KTEXT TEXT40 CHAR 40   0   Short text for the work center  
130 INNAM INNAM TEXT18 CHAR 18   0   Name of the Maintenance Planner Group  
131 KDAUF KDAUF VBELN CHAR 10   0   Sales Order Number *
132 KDPOS CO_KDPOS POSNR NUMC 6   0   Sales order item *
133 LGORT LGORT_D LGORT CHAR 4   0   Storage location *
134 VERID VERID VERID CHAR 4   0   Production Version *
135 CHARG CHARG_D CHARG CHAR 10   0   Batch Number *
136 NAME1 CY_NAME1 NAME CHAR 35   0   Name of the customer for the customer order  
137 PLNNR PLNNR PLNNR CHAR 8   0   Key for Task List Group  
138 PLNAL PLNAL ALTNR CHAR 2   0   Group Counter  
139 PLNFL PLNFOLGE PLNFOLGE CHAR 6   0   Sequence  
140 PLNTY PLNTY PLNTY CHAR 1   0   Task List Type *
141 UVORN CY_UVORN CHAR4 CHAR 4   0   Sub-operation  
142 LTXA1 LTXA1 TEXT40 CHAR 40   0   Operation short text  
143 LOART LOHNART LOART CHAR 4   0   Wage type  
144 MGVRG MGVRG MENG13 QUAN 13   3   Operation Quantity  
145 MEINH VORME MEINS UNIT 3   0   Unit of measure for activity *
146 RFGRP RUEFAGRP RUEFAGRP CHAR 10   0   Setup group category *
147 RFSCH RUEFASCHLU RUEFASCHLU CHAR 10   0   Setup group key *
148 RASCH RUEARSCHLU RUEARSCHLU CHAR 2   0   Setup Type Key *
149 ARBEI ARBEIT ARBEIT QUAN 7   1   Work involved in the activity  
150 ARBEH ARBEITE MEINS UNIT 3   0   Unit for work *
151 PSTXTTI TXTTI CHAR20 CHAR 20   0   PS text description  
152 DAUNO DAUNOR DAUER_4_1 QUAN 5   1   Normal duration of the activity  
153 DAUNE DAUNORE MEINS UNIT 3   0   Normal duration/unit *
154 EWDAN EWDAN DAUER_4_1 QUAN 5   1   Normal duration (from forecast) of activity  
155 EWDNE EWDNE MEINS UNIT 3   0   Unit for forecast normal duration *
156 OFMNW OFMNW ARBEIT QUAN 7   1   Forecasted work (actual + remaining)  
157 ASVRG ASVRG MENG13 QUAN 13   3   Operation scrap  
158 VGE01 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
159 VGW01 VGWRT VGWRT QUAN 9   3   Standard Value  
160 VGE02 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
161 VGW02 VGWRT VGWRT QUAN 9   3   Standard Value  
162 VGE03 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
163 VGW03 VGWRT VGWRT QUAN 9   3   Standard Value  
164 VGE04 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
165 VGW04 VGWRT VGWRT QUAN 9   3   Standard Value  
166 VGE05 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
167 VGW05 VGWRT VGWRT QUAN 9   3   Standard Value  
168 VGE06 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
169 VGW06 VGWRT VGWRT QUAN 9   3   Standard Value  
170 USR00 USRCHAR20 USRCHAR20 CHAR 20   0   User field with 20 characters  
171 USR01 USRCHAR20 USRCHAR20 CHAR 20   0   User field with 20 characters  
172 USR02 USRCHAR10 USRCHAR10 CHAR 10   0   User field with 10 characters  
173 USR03 USRCHAR10 USRCHAR10 CHAR 10   0   User field with 10 characters  
174 USR04 USRQUAN13 USRQUAN13 QUAN 13   3   User field for quantity (length 10.3)  
175 USE04 USRUNIT MEINS UNIT 3   0   User field: Unit for quantity fields *
176 USR05 USRQUAN13 USRQUAN13 QUAN 13   3   User field for quantity (length 10.3)  
177 USE05 USRUNIT MEINS UNIT 3   0   User field: Unit for quantity fields *
178 USR06 USRCURR13 USRCURR13 CURR 13   3   User-defined field for values (length 10,3)  
179 USE06 USRCUKY WAERS CUKY 5   0   User field: Unit for value fields *
180 USR07 USRCURR13 USRCURR13 CURR 13   3   User-defined field for values (length 10,3)  
181 USE07 USRCUKY WAERS CUKY 5   0   User field: Unit for value fields *
182 USR08 USRDATE USRDATE DATS 8   0   User field for date  
183 USR09 USRDATE USRDATE DATS 8   0   User field for date  
184 USR10 USRFLAG FLAG CHAR 1   0   User-defined field: Indicator for reports  
185 USR11 USRFLAG FLAG CHAR 1   0   User-defined field: Indicator for reports  
186 VNAME JV_NAME JV_NAME CHAR 6   0   Joint venture *
187 PLNUM PLNUM PLNUM CHAR 10   0   Planned order number *
188 MATNR CYMATNR MATNR CHAR 18   0   Material in planned order *
189 PLWRK PLWRK WERKS CHAR 4   0   Planning Plant *
190 PWWRK PWWRK WERKS CHAR 4   0   Production plant in planned order *
191 PAART CY_PAART PAART CHAR 4   0   Type of planned order  
192 GSMNG GSMNG MENG13 QUAN 13   3   Total planned order quantity  
193 MEINS MEINS MEINS UNIT 3   0   Base Unit of Measure *
194 SERNR SERNR SERNR CHAR 8   0   BOM explosion number *
195 PLSCN PLSCN PLSCN NUMC 3   0   Planning Scenario of Long-Term Planning *
196 KAPFX KAPFX XFELD CHAR 1   0   Indicator: capacity for planned order dispatched  
197 SEQNR CY_SEQNR CY_SEQNR NUMC 14   0   Seq. number order  
198 ABKRS AUFABKRS AKREIS NUMC 2   0   Processing group *
199 KOSTL AUFKOSTL KOSTL CHAR 10   0   Cost center for basic settlement *
200 PSTTR CY_PSTTR DATUM DATS 8   0   Basic start in planned order  
201 PEDTR CY_PEDTR DATUM DATS 8   0   Basic date in planned order  
202 PERNR PERNR_D PERNR NUMC 8   0   Personnel Number  
203 OTYPE OTYPE OTYPE CHAR 2   0   Object Type *
204 ORGEH ORGEH ORGEH NUMC 8   0   Organizational Unit *
205 ORGEH_TXT CYSTEXT TEXT40 CHAR 40   0   Description of organizational unit  
206 BEGDA BEGDA DATUM DATS 8   0   Start Date  
207 ENDDA ENDDA DATUM DATS 8   0   End Date  
208 PLANS HROBJID HROBJID NUMC 8   0   Object ID *
209 PLANS_TXT CYPLANS TEXT40 CHAR 40   0   Position name  
210 STELL STELL STELL NUMC 8   0   Job *
211 STELL_TXT CYSTELL TEXT40 CHAR 40   0   Description of position key  
212 ENAME EMNAM TEXT40 CHAR 40   0   Formatted Name of Employee or Applicant  
213 TITEL TITEL TITEL CHAR 15   0   Title *
214 GBDAT GBDAT GBDAT DATS 8   0   Date of Birth  
215 FAMST FAMST FAMST CHAR 1   0   Marital Status Key *
216 PSTLZ PSTLZ PSTLZ CHAR 10   0   Postal Code  
217 ORT01 ORT01 TEXT25 CHAR 25   0   City  
218 STRAS STRAS TEXT30 CHAR 30   0   House number and street  
219 ANRED ANRDE ANRDE CHAR 1   0   Form-of-Address Key *
220 NATIO NATSL LAND1 CHAR 3   0   Nationality *
221 VERWE AP_VERWE AP_VERWE CHAR 4   0   Work Center Category *
222 VERAN AP_VERAN AP_VERAN CHAR 3   0   Person responsible for the work center *
223 MATYP MATYP MATYP CHAR 10   0   Machine type *
224 ARBPLTEXT ARBPLTEXT TEXT40 CHAR 40   0   Text describing work center in more detail  
225 AZMAX KAPANZAHL KAPANZAHL INT2 5   0   Number of individual capacities  
226 KAPARTEXT KAPTEXT TEXT40 CHAR 40   0   Capacity short text  
227 NAME KAPNAME KAPNAME CHAR 8   0   Capacity name  
228 PLANR KAPPLANER KAPPLANER CHAR 3   0   Capacity planner group *
229 POOLK KAP_KZPOOL XFELD CHAR 1   0   Indicator for pooled capacity  
230 MEHR KAP_MEHR XFELD CHAR 1   0   Has individual capacities  
231 IBEDARF CY_IBEDARF MENG15 QUAN 15   3   Actual cap. reqmts  
232 SBEDARF CY_SBEDARF MENG15 QUAN 15   3   Planned capacity requirements  
233 VRG_ARBPL VRG_ARBPL ARBPL CHAR 8   0   Work center of the operation  
234 VRG_ARBPLT VRG_ARBPLT TEXT40 CHAR 40   0   Work center text of sub-operation  
235 STATUS STATUS_TXT STATUS_TXT CHAR 4   0   Text of order status  
236 STATUV ACC_STATUV CHAR40 CHAR 40   0   Operation status text (Acc)  
237 MATTEXT MAKTX TEXT40 CHAR 40   0   Material description  
238 ANGEB CY_ANGEB MENG13 QUAN 13   3   Available capacity as field of type P  
239 LIEINHA CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
240 STTXT CO_STTXT CHAR40 CHAR 40   0   System Status  
241 ISTRUEST ACC_CYISTRUEST DEC20_3 DEC 20   3   Set up actual capacity rqmnts for operation segment (Acc)  
242 ISTBEARB ACC_CYISTBEARB DEC20_3 DEC 20   3   Process actual capacity rqmts for operation segment (Acc)  
243 ISTABRUE ACC_CYISTABRUE DEC20_3 DEC 20   3   Tear down actual capacity rqmts for operation segment (Acc)  
244 ANZZL ANZKAP INT1 INT1 3   0   Number of capacities required  
245 BSTKZ CY_BSTKZ CY_BSTKZ CHAR 1   0   Indicator rqmts.record is confirmed (cap.availability check)  
246 SAFNR SAFNR SAFNR CHAR 10   0   SOP order number  
247 GSTRU GSTRU AS4TAB CHAR 30   0   Generated DDIC table for LIS, conditions, messages *
248 VSNDA VSNDA VERID CHAR 4   0   Production version *
249 VONDAT VONDAT DATUM DATS 8   0   Valid-From Date  
250 BISDAT BISDAT DATUM DATS 8   0   Valid-to date  
251 PERIV PERIV PERIV CHAR 2   0   Fiscal Year Variant *
252 MENGE PRODU FLTP FLTP 16   16   Production  
253 VRSIO VRSIO VRSIO CHAR 3   0   Version number in the information structure *
254 VSNMR VSNMR VSNMR CHAR 12   0   Number or description of a version  
255 INDEX_BED CY_INDBED SYST_LONG INT4 10   0   Index referring to pegged requirement  
256 GRUPPE CY_GRUPPE NUMC2 NUMC 2   0   Requirements group  
257 KOMBI CY_KOMBI INT2 INT2 5   0   Combination within a requirements group  
258 BEDART CY_BEDART CY_BEDART CHAR 1   0   Requirements type (planned, remaining, actual requirements)  
History
Last changed by/on SAP  20130529 
SAP Release Created in 700