Where Used List (Data Element) for SAP ABAP Domain TSTRDURAN (Time stream: Duration in hhhhhhh:mm:ss / external hhhhhhh:mm)
SAP ABAP Domain
TSTRDURAN (Time stream: Duration in hhhhhhh:mm:ss / external hhhhhhh:mm) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 | /BCV/QRM_CACHE_DURATION | Cache Duration | ||||
| 2 | /BEV1/RPAD1 | Waiting Time 1 in Hours : Min. | ||||
| 3 | /BEV1/RPAD2 | Waiting Time 2 in Hours : Min. | ||||
| 4 | /BEV1/RPDFD | Direct Travel Time in Hrs : Min. | ||||
| 5 | /BEV1/RPERRDD | Calculated Average Duration in Hours: Min. | ||||
| 6 | /BEV1/RPFD | Travel Duration in Hours: Min. | ||||
| 7 | /BEV1/RPMANDD | Manual Average Duration in Hours: Min. | ||||
| 8 | /BEV1/RPMAXDAUER | Maximum Duration of a Tour in Hrs:Min | ||||
| 9 | /BEV1/RPVWAD1 | Default Waiting Time 1 in Hours: Min. | ||||
| 10 | /BEV1/RPVWAD2 | Default Waiting Time 2 in Hours: Min. | ||||
| 11 | /BEV1/RPVWDFD | Default Value for Direct Travel Duration in Hours: Min. | ||||
| 12 | /BEV1/RPVWFD | Default Value Travel Duration in Hours: Min. | ||||
| 13 | /DSD/RP_MAXTIME | Maximum Duration of a Tour in Hrs:Min | ||||
| 14 | /DSD/VC_DTRVD | Direct Driving Time | ||||
| 15 | /DSD/VC_DURA | Waiting Time | ||||
| 16 | /DSD/VC_LEADT | Minimum Lead Time for Order Entry | ||||
| 17 | /DSD/VC_TRVD | Driving Time | ||||
| 18 | /SAPTRX/DURATION_HOURS | Duration in Hours:Minutes:Seconds | ||||
| 19 | /SAPTRX/EFFDURAT_PLAN | Planned Effective Duration | ||||
| 20 | /SAPTRX/EV_EXP_DUR | Event Date Duration | ||||
| 21 | /SAPTRX/EV_TOLERANCE | Earliest/Latest Event Date Tolerance | ||||
| 22 | /SAPTRX/MSG_EXP_DUR | Expected Event Message Duration | ||||
| 23 | /SAPTRX/MSG_TOLERANCE | Event Message Date Tolerance | ||||
| 24 | AB_EFFZTDA | Actual duration of shipment stage (in hours:minutes) | ||||
| 25 | AB_EFFZTDP | Plan: Actual duration at stage level (in hours:minutes) | ||||
| 26 | AB_WARZTDA | Current waiting time in shipment stage (in hrs:min) | ||||
| 27 | AB_WARZTDP | Planned waiting time in shipment stage (in hrs:min) | ||||
| 28 | FAHZTD | Travel duration as actual time (hours/minutes) | ||||
| 29 | GEODURAN | Duration for a route between two geographical locations | ||||
| 30 | JIT_DON_LIGHT_R | Time Difference for Alarm Level (Red Traffic Light) | ||||
| 31 | JIT_DON_LIGHT_Y | Time difference for Warning Level (Yellow Traffic Light) | ||||
| 32 | JIT_GRTIME | Additional Time with Goods Rec'g Times of Unloading Point | ||||
| 33 | KITZM | Transportation Time in Hours/Minutes | ||||
| 34 | KNFZM | Refill Time in Hours/Minutes | ||||
| 35 | KP_EFFZTDA | Actual time needed for transporation (in hours:minutes) | ||||
| 36 | KP_EFFZTDP | Planned duration of transportation (in hours:minutes) | ||||
| 37 | KP_WARZTDA | Current waiting time of shipment (in hours:minutes) | ||||
| 38 | KP_WARZTDP | Planned waiting time of shipment (in hours:minutes) | ||||
| 39 | KWBZM | Replenishment Lead Time in Hours/Minutes | ||||
| 40 | KWTZM | Wait Time in Hours/Minutes | ||||
| 41 | LOADTN | Loading time in working hours | ||||
| 42 | OIGEFFZTDA | TD - actual duration for shipment stage (in hours:minutes) | ||||
| 43 | OIGEFFZTDP | TD - planned duration for stage (in hours:minutes) | ||||
| 44 | OIJ_OFFSET_DUR_DMD | Demand Period Duration (in hours:minutes) | ||||
| 45 | OIJ_OFFSET_DUR_DS | Distribution Schedule Period Duration (in hours:minutes) | ||||
| 46 | OIJ_OFFSET_DUR_GEN | General Period Duration (in hours:minutes) | ||||
| 47 | OIJ_OFFSET_DUR_SUP | Supply Period Duration (in hours:minutes) | ||||
| 48 | OIJ_OFFSET_DUR_TRANS | Transport Period Duration (in hours:minutes) | ||||
| 49 | OVERDUE_AFTER | Shipments Overdue After: | ||||
| 50 | PINTVM | Pull Interval in Hours and Minutes | ||||
| 51 | PIPATN | Pick/pack time in work hours | ||||
| 52 | RESPONSE | Reply Expected After: | ||||
| 53 | ROUNDN | Rounding period in work hours | ||||
| 54 | S2L_MIN_SEL_HORIZON | Minimal Selection Horizon | ||||
| 55 | S2L_PLNG_HORIZON | Planning Horizon for Automatic Supply-to-Production | ||||
| 56 | SCHEDDURAN | Scheduling duration in hours/minutes working time | ||||
| 57 | SCHEDDURATION | Duration for scheduling (gross OR net) | ||||
| 58 | SPGAVAIT | Time available | ||||
| 59 | SPGPRODT | Production time | ||||
| 60 | TDVZND | Transportation lead time in hours/minutes work time | ||||
| 61 | TSTRBREAKS | Time stream: Proportionate breaks in hhhhhh:mm:ss |