SAP ABAP Data Element S2L_PLNG_HORIZON (Planning Horizon for Automatic Supply-to-Production)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-A-S2L (Application Component) Production Supply
⤷ DI_S2L (Package) Production Supply
⤷ IS-A-S2L (Application Component) Production Supply
⤷ DI_S2L (Package) Production Supply
Basic Data
Data Element | S2L_PLNG_HORIZON |
Short Description | Planning Horizon for Automatic Supply-to-Production |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TSTRDURAN | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 11 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plng Horiz |
Medium | 16 | Planning Horizon |
Long | 20 | Planning Horizon |
Heading | 16 | Planning Horizon |
Documentation
Definition
Note:
- The now-timepoint is reset when creating or refreshing data from a Supply segment in the supply-to-production table.
- When supply-to-production is consumption-based, requirements in the past according to planning, and for which no withdrawals have yet been made, are not taken into account.
- The planning horizon is calculated along the operating time. The operating time is determined using the shift sequence in the scheduling profile of the control cycle.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C2 |