SAP ABAP Data Element OIJ_OFFSET_DUR_SUP (Supply Period Duration (in hours:minutes))
Hierarchy
IS-OIL (Software Component) IS-OIL
   IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
     OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element OIJ_OFFSET_DUR_SUP
Short Description Supply Period Duration (in hours:minutes)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type TSTRDURAN    
Data Type DEC   Counter or amount field with comma and sign 
Length 11    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Sup.Durat. 
Medium 15 Sup.Duration 
Long 20 Supply Duration 
Heading 10 Sup.Durat. 
Documentation

Definition

Here you enter a value in hours and minutes for the duration of the planning horizon. You must maintain this field together with the offset period. You enter the offset period in days together with the duration in hours and minutes to determine the start and end of the planning horizon. The system calculates the start and end of the planning horizon using the following logic:

Start of required horizon = current date + number of days entered for offset.

End of required horizon = current date + number of days entered for offset + hours and minutes entered for duration.

Procedure

Examples

Dependencies

You must enter the duration (hours and minutes) in combination with the offset period (days).

As there is no possibility to maintain a specific start and end time, the duration should be maintained in 24-hour time periods.

Note: One day is defined as being from 0:00h until 23.59h, whereby the time is based on the local time of the user.

History
Last changed by/on SAP  20050224 
SAP Release Created in 46C