Hierarchy
⤷ IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
⤷ OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element | OIJ_OFFSET_DUR_SUP |
Short Description | Supply Period Duration (in hours:minutes) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TSTRDURAN | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 11 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sup.Durat. |
Medium | 15 | Sup.Duration |
Long | 20 | Supply Duration |
Heading | 10 | Sup.Durat. |
Documentation
Definition
Here you enter a value in hours and minutes for the duration of the planning horizon. You must maintain this field together with the offset period. You enter the offset period in days together with the duration in hours and minutes to determine the start and end of the planning horizon. The system calculates the start and end of the planning horizon using the following logic:
Start of required horizon = current date + number of days entered for offset.
End of required horizon = current date + number of days entered for offset + hours and minutes entered for duration.
Procedure
Examples
Dependencies
You must enter the duration (hours and minutes) in combination with the offset period (days).
As there is no possibility to maintain a specific start and end time, the duration should be maintained in 24-hour time periods.
Note: One day is defined as being from 0:00h until 23.59h, whereby the time is based on the local time of the user.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 46C |