SAP ABAP Data Element OIJ_OFFSET_DUR_DS (Distribution Schedule Period Duration (in hours:minutes))
Hierarchy
IS-OIL (Software Component) IS-OIL
   IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
     OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element OIJ_OFFSET_DUR_DS
Short Description Distribution Schedule Period Duration (in hours:minutes)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type TSTRDURAN    
Data Type DEC   Counter or amount field with comma and sign 
Length 11    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 DS Durat. 
Medium 20 Distr.Sch.Duration 
Long 25 Distrib. Sched. Duration 
Heading 10 DS Durat. 
Documentation

Definition

Demand Items - Planning horizon offset duration

Indicates the timespan in days, hours, minutes.

i.e. Start of required horizon: current date + maintained offset

End of required horizon: current date + maintained offset + duration.

Procedure

Examples

Time,'Offset in days''Offset duration', Start of planning horizon

Time dependent,'0''3:00h', after three hours, from current time

Time independent,'1''7:00h' after one day and seven hours (the seven

hours are counted as from the end of the first day, from 0:00h of the next day)

Note:

- one day is defined as being from 0:00h until 23.59h

- the time refers to the local timezone of the user

Dependencies

This duration (in hours and minutes) has to be maintained in conjunction with the offset (in days).

As there is no possibility to maintain a specific start and end time, the duration should be maintained in 24h time periods.

History
Last changed by/on SAP  20050224 
SAP Release Created in 46C