Hierarchy
⤷ IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
⤷ OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element | OIJ_OFFSET_DUR_DS |
Short Description | Distribution Schedule Period Duration (in hours:minutes) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TSTRDURAN | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 11 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | DS Durat. |
Medium | 20 | Distr.Sch.Duration |
Long | 25 | Distrib. Sched. Duration |
Heading | 10 | DS Durat. |
Documentation
Definition
Demand Items - Planning horizon offset duration
Indicates the timespan in days, hours, minutes.
i.e. Start of required horizon: current date + maintained offset
End of required horizon: current date + maintained offset + duration.
Procedure
Examples
Time,'Offset in days''Offset duration', Start of planning horizon
Time dependent,'0''3:00h', after three hours, from current time
Time independent,'1''7:00h' after one day and seven hours (the seven
hours are counted as from the end of the first day, from 0:00h of the next day)
Note:
- one day is defined as being from 0:00h until 23.59h
- the time refers to the local timezone of the user
Dependencies
This duration (in hours and minutes) has to be maintained in conjunction with the offset (in days).
As there is no possibility to maintain a specific start and end time, the duration should be maintained in 24h time periods.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 46C |