SAP ABAP Data Element PINTVM (Pull Interval in Hours and Minutes)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
Basic Data
Data Element | PINTVM |
Short Description | Pull Interval in Hours and Minutes |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TSTRDURAN | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 11 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PI [h:min] |
Medium | 18 | Pull Int. [h:min] |
Long | 22 | Pull Interval [h:min] |
Heading | 22 | Pull Interval [h:min] |
Documentation
Definition
Time interval between the transfer of requirements from the consumer (demand source) to the supply source or the interval between the times of delivery by the supply source to the consumer. You can enter hours and minutes in the form of hhhhhhh : mm.
Use
The pull interval is used as a buffer in the control cycle calculation. It increases the number of kanban containers in the control cycle.
Dependencies
- The pull interval in hours/minutes takes priority over the pull interval in days, i.e. the system uses the pull interval in hours/minutes as soon as you specify this value, irrespective of what you have specified for the pull interval in days.
- To enable the pull interval in hours/minutes to be used in the kanban calculation, it is necessary to define a factory calendar and shift sequences for the control cycle calculation.
- You can specify the pull interval in the calculation profile, in the PSA, and in control cycle maintenance. If you have specified the pull interval more than once, at different points, the system takes this interval into account with the following priorities:
- 1: Control cycle maintenance
- 2: PSA
- 3: Calculation profile
Example
Your production works on a single-shift basis from 8.00 hrs to 16.00 hrs. This information in stored in the shift sequence.
The person who replenishes the PSA arrives at 8 hrs and 12 hrs every day to pick up empty kanbans (kanban cards) and leave behind full ones. In this case, the pull interval amounts to 4 hours.
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in | 605 |