SAP ABAP View U_15667 (Maintenance order operation - Internal service)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   CA (Application Component) Cross-Application Components
     UUDM (Package) EDM: Data Modeler (General)
Basic Data
View Type D Database View 
Database View U_15667  
Short Description Maintenance order operation - Internal service    
Root table AFVC   Operation within an order 
Entity TypeDM02L 
Short text Maintenance order operation - Internal service
Table
# Table Name Foreign Table Foreign Field Foreign DIR
1 AFVC AFVC
2 AFVU  
3 AFVV  
Join Conditions
# Table Name Field Name Negation Operator Constants Cont. line AND/OR Offset F Length Mco Field
1 AFVC MANDT JL EQ 0 0
2 AFVU MANDT JR EQ AND 0 0
3 AFVC AUFPL JL EQ 0 0
4 AFVU AUFPL JR EQ AND 0 0
5 AFVC APLZL JL EQ 0 0
6 AFVU APLZL JR EQ AND 0 0
7 AFVC MANDT JL EQ 0 0
8 AFVV MANDT JR EQ AND 0 0
9 AFVC AUFPL JL EQ 0 0
10 AFVV AUFPL JR EQ AND 0 0
11 AFVC APLZL JL EQ 0 0
12 AFVV APLZL JR EQ 0 0
                     
View Fields
# View field Table Field Maintenance Flag Key Data element Mod Short Description
1 MANDT AFVC MANDT   MANDT Client
2 AUFPL AFVC AUFPL   CO_AUFPL Routing number of operations in the order
3 APLZL AFVC APLZL   CO_APLZL General counter for order
4 VORNR AFVC VORNR   VORNR Operation/Activity Number
5 PLNKN AFVC PLNKN   PLNKN Number of the task list node
6 PLNAL AFVC PLNAL   PLNAL Group Counter
7 PLNTY AFVC PLNTY   PLNTY Task List Type
8 PLNNR AFVC PLNNR   PLNNR Key for Task List Group
9 ZAEHL AFVC ZAEHL   CIM_COUNT Internal counter
10 STEUS AFVC STEUS   STEUS Control key
11 ARBID AFVC ARBID   CR_OBJID Object ID of the resource
12 WERKS AFVC WERKS   WERKS_D Plant
13 PDEST AFVC PDEST   CR_PDEST Printer for shop papers
14 TXTSP AFVC TXTSP   SPRAS Language Key
15 LTXA1 AFVC LTXA1   LTXA1 Operation short text
16 LTXA2 AFVC LTXA2   LTXA2 Second line of the description
17 SUMNR AFVC SUMNR   SUMKNTNR Node number of the superior operation
18 MLSTN AFVC MLSTN   MILESTONE Usage
19 PPRIO AFVC PPRIO   PRIORITAET Priority
20 PRKST AFVC PRKST   PRKST Costs in the activity
21 OBJNR AFVC OBJNR   J_OBJNR Object number
22 STDKN AFVC STDKN   STDKN Node of operation within reference operation set
23 ANLZU AFVC ANLZU   ANLZU Syst.Condition
24 ISTRU AFVC ISTRU   ISTRU Assembly
25 ISTTY AFVC ISTTY   STLTY BOM Category
26 ISTNR AFVC ISTNR   STNUM Bill of Material
27 ISTKN AFVC ISTKN   STLKN BOM Item Node Number
28 ISTPO AFVC ISTPO   CIM_COUNT Internal counter
29 IUPOZ AFVC IUPOZ   UPOSZ Subitem Number
30 EBORT AFVC EBORT   EBORT Installation Point for Subitem
31 PVZKN AFVC PVZKN   CO_APLZL General counter for order
32 PHFLG AFVC PHFLG   PHFLG Indicator: Phase
33 RSTUF AFVC RSTUF   RSTUF Reduction level which reduces operation lead time
34 NPTXTKY AFVC NPTXTKY   TXTKY Internal text number (12-character)
35 SUBSYS AFVC SUBSYS   QEIFSUBSYS Subsystem Identifier for QM Subsystem Interface
36 SCOPE AFVC SCOPE   SCOPE_CV Object Class
37 AENNR AFVC AENNR   AENNR Change Number
38 CY_SEQNRV AFVC CY_SEQNRV   CY_SEQNRV Sequence number operation
39 MEINH AFVV MEINH   VORME Unit of measure for activity
40 UMREN AFVV UMREN   CP_UMREN Denominator for converting rtg and op units of measure
41 UMREZ AFVV UMREZ   CP_UMREZ Numerator for converting task list and oper. un. of measure
42 BMSCH AFVV BMSCH   BMSCH Base Quantity
43 DAUNO AFVV DAUNO   DAUNOR Normal duration of the activity
44 DAUNE AFVV DAUNE   DAUNORE Normal duration/unit
45 DAUMI AFVV DAUMI   DAUMIN Minimum activity duration
46 DAUME AFVV DAUME   DAUMINE Unit for the minimum duration
47 EINSA AFVV EINSA   EINSCHRA Constraint on the basic start date for the activity
48 EINSE AFVV EINSE   EINSCHRE Constraint on the finish date of the activity
49 ARBEI AFVV ARBEI   ARBEIT Work involved in the activity
50 ARBEH AFVV ARBEH   ARBEITE Unit for work
51 MGVRG AFVV MGVRG   MGVRG Operation Quantity
52 PUFFR AFVV PUFFR   PUFFR_FREI Free float
53 PUFGS AFVV PUFGS   PUFFR_GESM Total float
54 EWDNE AFVV EWDNE   EWDNE Unit for forecast normal duration
55 EWDAM AFVV EWDAM   EWDAM Minimum duration (from forecast) for activity
56 EWDME AFVV EWDME   EWDME Unit for forecast minimum duration
57 EWDAN AFVV EWDAN   EWDAN Normal duration (from forecast) of activity
58 EWSTE AFVV EWSTE   PS_RESTE Forecast date constraint on activity finish
59 EWSTA AFVV EWSTA   PS_RESTA Forecast date constraint on activity start
60 PUFGP AFVV PUFGP   PPUFF_GESM Total float (from forecast)
61 PUFFP AFVV PUFFP   PPUFF_FREI Free float (from forecast)
62 KNOTE AFVV KNOTE   KNOTE Transportation Connection Points
63 VSTZW AFVV VSTZW   VSTZW Deadline function
64 VSTGA AFVV VSTGA   VSTGA Deadline deviation reason
65 QRASTZEHT AFVV QRASTZEHT   QRASTZEHT Time Unit
66 QRASTZFAK AFVV QRASTZFAK   QRASTZFAK Time Factor
67 QRASTMENG AFVV QRASTMENG   QRASTMENG Quantity Between Two Inspections
68 QRASTEREH AFVV QRASTEREH   QRASTEREH Grid Unit of Measure
69 AUFKT AFVV AUFKT   AFAKT Execution Factor
70 VGWTS AFVC VGWTS   VORGSCHL Standard value key
71 LAR01 AFVC LAR01   LSTAR Activity Type
72 LAR02 AFVC LAR02   LSTAR Activity Type
73 LAR03 AFVC LAR03   LSTAR Activity Type
74 LAR04 AFVC LAR04   LSTAR Activity Type
75 LAR05 AFVC LAR05   LSTAR Activity Type
76 LAR06 AFVC LAR06   LSTAR Activity Type
77 LOANZ AFVC LOANZ   LOHNANZ Number of Time Tickets
78 LOART AFVC LOART   LOHNART Wage type
79 RSANZ AFVC RSANZ   CR_RS_ANZ Number of confirmation slips
80 QUALF AFVC QUALF   QUALF Suitability
81 ANZMA AFVC ANZMA   ANZMS Number of employees
82 LOGRP AFVC LOGRP   LOHNGRP Wage group
83 RSTRA AFVC RSTRA   RSTRA Reduction strategy per operation/activity
84 DDEHN AFVC DDEHN   DAUDEHN Indicator: flexible duration
85 ANZZL AFVC ANZZL   ANZKAP Number of capacities required
86 PRZNT AFVC PRZNT   APROZENT Work percentage
87 BUKRS AFVC BUKRS   BUKRS Company Code
88 ANFKO AFVC ANFKO   ANFKO Requesting cost center
89 ANFKOKRS AFVC ANFKOKRS   ANFKOKRS Controlling area of the requesting cost center
90 INDET AFVC INDET   INDET Calculation key
91 LARNT AFVC LARNT   LSTAR Activity Type
92 VERTL AFVC VERTL   CR_VERTN Distr.cap.reqmts (plant maint.,process order, network)
93 SPANZ AFVC SPANZ   SPLITTERM Actual number of splits
94 BEDID AFVC BEDID   BEDID ID of the capacity requirements record
95 BEDZL AFVC BEDZL   CIM_COUNT Internal counter
96 LEK01 AFVC LEK01   CO_LEIKZ Indicator: No remaining activity expected
97 LEK02 AFVC LEK02   CO_LEIKZ Indicator: No remaining activity expected
98 LEK03 AFVC LEK03   CO_LEIKZ Indicator: No remaining activity expected
99 LEK04 AFVC LEK04   CO_LEIKZ Indicator: No remaining activity expected
100 LEK05 AFVC LEK05   CO_LEIKZ Indicator: No remaining activity expected
101 LEK06 AFVC LEK06   CO_LEIKZ Indicator: No remaining activity expected
102 LEKNW AFVC LEKNW   LEKNW Indicator: No Remaining Work Expected
103 ARBII AFVC ARBII   CR_OBJID_I Actual operating resources object identification
104 WERKI AFVC WERKI   WERKS_I Actual plant
105 KAPT_PUFFR AFVC KAPT_PUFFR   KAPT_PUFFR Operation floats after finite scheduling (in seconds)
106 ZMERH AFVV ZMERH   DZMERH Break
107 ZEIER AFVV ZEIER   DZEIER Unit for the break time
108 VGE01 AFVV VGE01   VGWRTEH Unit of measure for the standard value
109 VGW01 AFVV VGW01   VGWRT Standard Value
110 VGE02 AFVV VGE02   VGWRTEH Unit of measure for the standard value
111 VGW02 AFVV VGW02   VGWRT Standard Value
112 VGE03 AFVV VGE03   VGWRTEH Unit of measure for the standard value
113 VGW03 AFVV VGW03   VGWRT Standard Value
114 VGE04 AFVV VGE04   VGWRTEH Unit of measure for the standard value
115 VGW04 AFVV VGW04   VGWRT Standard Value
116 VGE05 AFVV VGE05   VGWRTEH Unit of measure for the standard value
117 VGW05 AFVV VGW05   VGWRT Standard Value
118 VGE06 AFVV VGE06   VGWRTEH Unit of measure for the standard value
119 VGW06 AFVV VGW06   VGWRT Standard Value
120 ZEIMU AFVV ZEIMU   DZEIMU Unit for the minimum overlap time
121 ZMINU AFVV ZMINU   DZMINU Minimum overlap time
122 MINWE AFVV MINWE   MINWEI Minimum Send-Ahead Quantity
123 ZEIMB AFVV ZEIMB   DZEIMB Unit for the minimum processing time
124 ZMINB AFVV ZMINB   DZMINB Minimum processing time
125 ZEILM AFVV ZEILM   DZEILM Unit for the maximum wait time
126 ZLMAX AFVV ZLMAX   DZLMAX Maximum wait time
127 ZEILP AFVV ZEILP   DZEILP Unit for the required wait time
128 ZLPRO AFVV ZLPRO   DZLPRO Minimum wait time
129 ZEIWN AFVV ZEIWN   DZEIWN Unit for the standard queue time
130 ZWNOR AFVV ZWNOR   DZWNOR Standard queue time
131 ZEIWM AFVV ZEIWM   DZEIWM Unit for the minumum queue time
132 ZWMIN AFVV ZWMIN   DZWMIN Minimum queue time
133 ZEITN AFVV ZEITN   DZEITN Unit for the standard move time
134 ZTNOR AFVV ZTNOR   DZTNOR Standard move time
135 ZEITM AFVV ZEITM   DZEITM Unit for the minimum move time
136 ZTMIN AFVV ZTMIN   DZTMIN Minimum move time
137 ASVRG AFVV ASVRG   ASVRG Operation scrap
138 LMNGA AFVV LMNGA   LMNGA Total Yield Confirmed
139 XMNGA AFVV XMNGA   XMNGA Total scrap quantity confirmed
140 GMNGA AFVV GMNGA   GMNGA Confirmed yield in order unit of measure
141 ISM01 AFVV ISM01   CO_RUMNG Previously confirmed activity
142 ISM02 AFVV ISM02   CO_RUMNG Previously confirmed activity
143 ISM03 AFVV ISM03   CO_RUMNG Previously confirmed activity
144 ISM04 AFVV ISM04   CO_RUMNG Previously confirmed activity
145 ISM05 AFVV ISM05   CO_RUMNG Previously confirmed activity
146 ISM06 AFVV ISM06   CO_RUMNG Previously confirmed activity
147 ISMNW AFVV ISMNW   CO_ISMNW Actual work
148 FSAVD AFVV FSAVD   FSAVD Earliest scheduled start: Execution (date)
149 FSAVZ AFVV FSAVZ   FSAVZ Earliest scheduled start: Execution (time)
150 FSSBD AFVV FSSBD   FSSBD Earliest scheduled start: Processing (date)
151 FSSBZ AFVV FSSBZ   FSSBZ Earliest scheduled start: Processing (time)
152 FSSAD AFVV FSSAD   FSSAD Earliest scheduled start: Teardown (date)
153 FSSAZ AFVV FSSAZ   FSSAZ Earliest scheduled start: Teardown (time)
154 FSEDD AFVV FSEDD   FSEDD Earliest scheduled finish: Execution (date)
155 FSEDZ AFVV FSEDZ   FSEDZ Earliest scheduled finish: Execution (time)
156 FSSLD AFVV FSSLD   FSSLD Earliest scheduled start: Wait (date)
157 FSSLZ AFVV FSSLZ   FSSLZ Earliest scheduled start: Wait (time)
158 FSELD AFVV FSELD   FSELD Earliest scheduled finish: Wait (date)
159 FSELZ AFVV FSELZ   FSELZ Earliest scheduled finish: Wait (time)
160 SSAVD AFVV SSAVD   SSAVD Latest scheduled start: Execution (date)
161 SSAVZ AFVV SSAVZ   SSAVZ Latest scheduled start: Execution (time)
162 SSSBD AFVV SSSBD   SSSBD Latest scheduled start: Processing (date)
163 SSSBZ AFVV SSSBZ   SSSBZ Latest scheduled start: Processing (time)
164 SSSAD AFVV SSSAD   SSSAD Latest scheduled start: Teardown (date)
165 SSSAZ AFVV SSSAZ   SSSAZ Latest scheduled start: Teardown (time)
166 SSEDD AFVV SSEDD   SSEDD Latest scheduled finish: Execution (date)
167 SSEDZ AFVV SSEDZ   SSEDZ Latest scheduled finish: Execution (time)
168 SSSLD AFVV SSSLD   SSSLD Latest scheduled start: Wait time (date)
169 SSSLZ AFVV SSSLZ   SSSLZ Latest scheduled start: Wait time
170 SSELD AFVV SSELD   SSELD Latest scheduled finish: Wait time (date)
171 SSELZ AFVV SSELZ   SSELZ Latest scheduled finish: Wait time
172 ISAVD AFVV ISAVD   ISAVD Actual operation start (date)
173 IEAVD AFVV IEAVD   IEAVD Actual finish of operation (date)
174 ISDD AFVV ISDD   ISDD Actual start: Execution (date)
175 ISDZ AFVV ISDZ   ISDZ Actual start: Execution/setup (time)
176 IERD AFVV IERD   IERD Actual finish: Setup (date)
177 IERZ AFVV IERZ   IERZ Actual finish: Setup (time)
178 ISBD AFVV ISBD   ISBD Actual start: Processing (date)
179 ISBZ AFVV ISBZ   ISBZ Actual start: Processing (time)
180 IEBD AFVV IEBD   IEBD Actual finish: Processing (date)
181 IEBZ AFVV IEBZ   IEBZ Actual processing finish (time)
182 ISAD AFVV ISAD   ISAD Actual start: Teardown (date)
183 ISAZ AFVV ISAZ   ISAZ Actual start: Teardown (time)
184 IEDD AFVV IEDD   IEDD Actual finish: Execution (date)
185 IEDZ AFVV IEDZ   IEDZ Actual finish: Execution (time)
186 NTANF AFVV NTANF   VORGABESTD Constraint for activity start (Basic)
187 PEDD AFVV PEDD   CO_PEDD Forecast finish date of operation from confirmation
188 PEDZ AFVV PEDZ   CO_PEDZ Forecast finish time of operation from confirmation
189 NTANZ AFVV NTANZ   VORGABESTZ Constraint for activity start time (Basic)
190 NTEND AFVV NTEND   VORGABEEND2 Constraint for Finish of Activity (Basic)
191 NTENZ AFVV NTENZ   VORGABEENZ Basic finish time of the activity
192 EWSTD AFVV EWSTD   EWSTARTD Forecasted start date for the activity
193 EWSTZ AFVV EWSTZ   EWSTARTZ Forecast start time of the activity
194 EWEND AFVV EWEND   EWENDED Forecast finish date
195 EWENZ AFVV EWENZ   EWENDEZ Forecast finish time for the activity
196 WARTZ AFVV WARTZ   WARTEZEIT Queue time used for scheduling
197 WRTZE AFVV WRTZE   WTRZE Unit of measure for queue time
198 RUEST AFVV RUEST   RUEST Setup time
199 RSTZE AFVV RSTZE   RSTZE Unit of measure for setup time
200 BEARZ AFVV BEARZ   BEARZEIT Processing time
201 BEAZE AFVV BEAZE   BEAZE Unit of measure for processing time
202 ABRUE AFVV ABRUE   ABRUE Teardown
203 ARUZE AFVV ARUZE   ARUZE Unit of measure for teardown
204 LIEGZ AFVV LIEGZ   LIEGEZEIT Wait time used for scheduling
205 LIGZE AFVV LIGZE   LIGZE Unit of measure for wait time
206 TRANZ AFVV TRANZ   TRANSZEIT Move time used for scheduling
207 TRAZE AFVV TRAZE   TRAZE Unit of measure for move time
208 ISERH AFVV ISERH   ISERH Confirmed break time
209 OFM01 AFVV OFM01   CO_SCHAETZ Forecast value used to update the standard value
210 OFM02 AFVV OFM02   CO_SCHAETZ Forecast value used to update the standard value
211 OFM03 AFVV OFM03   CO_SCHAETZ Forecast value used to update the standard value
212 OFM04 AFVV OFM04   CO_SCHAETZ Forecast value used to update the standard value
213 OFM05 AFVV OFM05   CO_SCHAETZ Forecast value used to update the standard value
214 OFM06 AFVV OFM06   CO_SCHAETZ Forecast value used to update the standard value
215 OFMNW AFVV OFMNW   OFMNW Forecasted work (actual + remaining)
216 FPAVD AFVV FPAVD   FPAVD Earliest scheduled start date (forecast)
217 FPAVZ AFVV FPAVZ   FPAVZ Earliest scheduled start time (forecast)
218 FPEDD AFVV FPEDD   FPEDD Earliest scheduled finish date (forecast)
219 FPEDZ AFVV FPEDZ   FPEDZ Earliest scheduled finish time (forecast)
220 SPAVD AFVV SPAVD   SPAVD Latest scheduled start date (forecast)
221 SPAVZ AFVV SPAVZ   SPAVZ Latest scheduled start time (forecast)
222 SPEDD AFVV SPEDD   SPEDD Latest scheduled finish date (forecast)
223 SPEDZ AFVV SPEDZ   SPEDZ Latest scheduled finish time (forecast)
224 BEAZP AFVV BEAZP   BEAZEP Unit of processing time (Forecast)
225 BEARP AFVV BEARP   PBEARZEIT Processing time (forecast)
226 EPANF AFVV EPANF   EPANF Dispatched start date for operation
227 EPANZ AFVV EPANZ   EPANZ Dispatched start time for operation
228 EPEND AFVV EPEND   EPEND Dispatched finish date
229 EPENZ AFVV EPENZ   EPENZ Dispatched finish time
230 PDAU AFVV PDAU   PDAU Forecasted duration of activity from confirmation
231 PDAE AFVV PDAE   PDAE Unit of the forecasted duration from the confirmation
232 RMNGA AFVV RMNGA   RMNGA Total confirmed rework quantity
233 ILE01 AFVV ILE01   CO_ISMNGEH Unit of measure for the activity to be confirmed
234 ILE02 AFVV ILE02   CO_ISMNGEH Unit of measure for the activity to be confirmed
235 ILE03 AFVV ILE03   CO_ISMNGEH Unit of measure for the activity to be confirmed
236 ILE04 AFVV ILE04   CO_ISMNGEH Unit of measure for the activity to be confirmed
237 ILE05 AFVV ILE05   CO_ISMNGEH Unit of measure for the activity to be confirmed
238 ILE06 AFVV ILE06   CO_ISMNGEH Unit of measure for the activity to be confirmed
239 SLWID AFVU SLWID   SLWID Key word ID for user-defined fields
240 USR00 AFVU USR00   USRCHAR20 User field with 20 characters
                 
Maintenance Status
Access
  read only
  read and change
  Time-dependent views: like U, validity data like ' '
  read, change, delete and insert
Delivery Class      
Data Browser/Table View Maintenance    Display/Maintenance Allowed with Restrictions  
History
Last changed by/on SAP  20130529 
SAP Release Created in