| 1 |
MANDT |
TCX00 |
MANDT |
|
|
MANDT |
|
Client |
| 2 |
WERKS |
TCX00 |
WERKS |
|
|
WERKS_D |
|
Plant |
| 3 |
AUFTG |
TCX00 |
AUFTG |
|
|
AUFTG |
|
Order group for capacity planning |
| 4 |
AUFTA |
TCX00 |
AUFTA |
|
|
AUFTA |
|
Order type in capacity planning |
| 5 |
VAGRP |
TCX00 |
VAGRP |
|
|
FEVOR |
|
Production Supervisor |
| 6 |
WERKS_TEXT |
T001W |
NAME1 |
R |
|
NAME1 |
|
Name |
| 7 |
FEVOR_TEXT |
T024F |
TXT |
R |
|
TXT_FEVOR |
|
Description of production scheduler |
| 8 |
PHORI |
TCX00 |
PHORI |
|
|
PHORI |
|
Scheduling horizon (detailed planning) |
| 9 |
APLS1 |
TCX00 |
APLS1 |
|
|
APLS1 |
|
Selection ID (detailed planning) |
| 10 |
TERM1 |
TCX00 |
TERM1 |
|
|
TERMX |
|
Lead time scheduling (detailed planning) |
| 11 |
KAPK1 |
TCX00 |
KAPK1 |
|
|
KAPKX |
|
Indicator: Generate capacity reqmts (detailed planning) |
| 12 |
PHORI_2 |
TCX00 |
PHORI_2 |
|
|
PHORI_2 |
|
Scheduling horizon (detailed planning, medium term) |
| 13 |
APLS1_2 |
TCX00 |
APLS1_2 |
|
|
APLS1_2 |
|
Selection ID for routing (detailed planning, medium term) |
| 14 |
TERM1_2 |
TCX00 |
TERM1_2 |
|
|
TERMX_2 |
|
Lead time scheduling (detailed planning, medium term) |
| 15 |
KAPK1_2 |
TCX00 |
KAPK1_2 |
|
|
KAPKX_2 |
|
Create capacity requirements (detailed planning,medium term) |
| 16 |
PHORI_3 |
TCX00 |
PHORI_3 |
|
|
PHORI_3 |
|
Scheduling horizon (detailed planning, long term) |
| 17 |
APLS1_3 |
TCX00 |
APLS1_3 |
|
|
APLS1_3 |
|
Selection ID for routing (detailed planning, long term) |
| 18 |
KAPK1_3 |
TCX00 |
KAPK1_3 |
|
|
KAPKX_3 |
|
Create capacity requirements (detailed planning, long term) |
| 19 |
TERM1_3 |
TCX00 |
TERM1_3 |
|
|
TERMX_3 |
|
Lead time scheduling (detailed planning, long term) |
| 20 |
RATHR |
TCX00 |
RATHR |
|
|
RATHR |
|
Rate-based planning horizon |
| 21 |
APLS2 |
TCX00 |
APLS2 |
|
|
APLS2 |
|
Selection ID (rate-based planning) |
| 22 |
TERM2 |
TCX00 |
TERM2 |
|
|
TERMX_RATE |
|
Lead time scheduling (rate-based planning) |
| 23 |
KAPK2 |
TCX00 |
KAPK2 |
|
|
KAPKX_RATE |
|
Create capacity requirements (rate-based planning) |
| 24 |
GROHR |
TCX00 |
GROHR |
|
|
GROHR |
|
Rough-cut planning horizon |
| 25 |
APLS3 |
TCX00 |
APLS3 |
|
|
APLS3 |
|
Selection ID (rough-cut planning) |
| 26 |
TERM3 |
TCX00 |
TERM3 |
|
|
TERMX_GROB |
|
Lead time scheduling (rough-cut planning) |
| 27 |
KAPK3 |
TCX00 |
KAPK3 |
|
|
KAPKX_GROB |
|
Create capacity requirements (rough-cut planning) |
| 28 |
DADJ1 |
TCX00 |
DADJ1 |
|
|
DADJ1 |
|
Scheduling level for adjusting basic dates |
| 29 |
DADJ2 |
TCX00 |
DADJ2 |
|
|
DADJ2 |
|
Adjust dates in lead time scheduling |
| 30 |
DADJ3 |
TCX00 |
DADJ3 |
|
|
DADJ3 |
|
Adjusting dates when dispatching planned orders |
| 31 |
TERMKZ |
TCX00 |
TERMKZ |
|
|
TERMKZ |
|
Scheduling type |
| 32 |
TERMKZ_TXT |
T482T |
TXT |
R |
|
TERMKZ_TXT |
|
Description of scheduling type |
| 33 |
TERM_AUTO |
TCX00 |
TERM_AUTO |
|
|
TERM_AUTO |
|
Indicator: Calculate dates automatically during saving |
| 34 |
PROT_AUTO |
TCX00 |
PROT_AUTO |
|
|
PROT_AUTO |
|
Display scheduling log automatically |
| 35 |
STVERG |
TCX00 |
STVERG |
|
|
STVERG |
|
Maximum number of days start date can be in the past |
| 36 |
MATFRUEH |
TCX00 |
MATFRUEH |
|
|
LAGE_FR |
|
Latest date for material staging |
| 37 |
BREAKS |
TCX00 |
BREAKS |
|
|
BREAKS |
|
Indicator: Scheduling allowing for breaks |
| 38 |
PROD_DATES |
TCX00 |
PROD_DATES |
|
|
PROD_DATES |
|
Scheduling based on production dates |
| 39 |
AUF_SHIFT |
TCX00 |
AUF_SHIFT |
|
|
AUF_SHIFT |
|
Indicator: Shift order/network |
| 40 |
RED_ART |
TCX00 |
RED_ART |
|
|
RED_ART |
|
Reduction type |
| 41 |
REDST_MAX |
TCX00 |
REDST_MAX |
|
|
REDST_MAX |
|
Maximum reduction level |
| 42 |
REDVS_S1 |
TCX00 |
REDVS_S1 |
|
|
REDVS_S1 |
|
Red. of floats before and after production (%) |
| 43 |
REDVS_S2 |
TCX00 |
REDVS_S2 |
|
|
REDVS_S2 |
|
Reduction level 2: Red. of floats bef./after prod. (in %) |
| 44 |
REDVS_S3 |
TCX00 |
REDVS_S3 |
|
|
REDVS_S3 |
|
Reduction level 3: Red. of floats bef./aft. prod. (in %) |
| 45 |
REDVS_S4 |
TCX00 |
REDVS_S4 |
|
|
REDVS_S4 |
|
Reduction level 4: Red. of floats bef./aft. prod. (in %) |
| 46 |
REDVS_S5 |
TCX00 |
REDVS_S5 |
|
|
REDVS_S5 |
|
Reduction level 5: Red. of floats bef./aft. prod. (in %) |
| 47 |
REDVS_S6 |
TCX00 |
REDVS_S6 |
|
|
REDVS_S6 |
|
Reduction level 6: Red. of floats bef./aft. prod. (in %) |
| 48 |
TERM_KPER |
TCX00 |
TERM_KPER |
|
|
TERM_KPER |
|
Rescheduling in Workforce Planning |
| 49 |
CMACT |
TCX00 |
CMACT |
|
|
CMACT |
|
Assignment Material Staging Operation Segment |
| |
|
|
|
|
|
|
|
|