SAP ABAP Data Element KAPKX_GROB (Create capacity requirements (rough-cut planning))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CX (Package) R/3 Application development: R/3 Scheduling
⤷
⤷
⤷
Basic Data
| Data Element | KAPKX_GROB |
| Short Description | Create capacity requirements (rough-cut planning) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Cap. req. |
| Medium | 15 | Cap.reqmts |
| Long | 20 | Capacity requirement |
| Heading | 3 | Cap |
Documentation
Definition
Determines that capacity requirements are generated in rough-cut planning.
Dependencies
- If you set the CapReqmnts indicator and the Scheduling indicator is set, capacity requirements are generated for the operations on the scheduled operation dates.
- If you set the CapReqmnts indicator and the Scheduling indicator is not set, capacity requirements for the operations are generated for the complete producion period of the order.
History
| Last changed by/on | SAP | 19971020 |
| SAP Release Created in |