1 |
MANDT |
|
MANDT |
MANDT |
CLNT |
3 |
0 |
Client |
T000 |
2 |
WERKS |
|
WERKS_D |
WERKS |
CHAR |
4 |
0 |
Plant |
T001W |
3 |
AUFTG |
|
AUFTG |
AUFTG |
CHAR |
2 |
0 |
Order group for capacity planning |
|
4 |
AUFTA |
|
AUFTA |
AUFTA |
CHAR |
4 |
0 |
Order type in capacity planning |
|
5 |
VAGRP |
|
FEVOR |
FEVOR |
CHAR |
3 |
0 |
Production Supervisor |
T024F |
6 |
WERKS_TEXT |
|
NAME1 |
TEXT30 |
CHAR |
30 |
0 |
Name |
|
7 |
FEVOR_TEXT |
|
TXT_FEVOR |
TEXT30 |
CHAR |
30 |
0 |
Description of production scheduler |
|
8 |
PHORI |
|
PHORI |
NUMC3 |
NUMC |
3 |
0 |
Scheduling horizon (detailed planning) |
|
9 |
APLS1 |
|
APLS1 |
CP_SEL_ID |
CHAR |
2 |
0 |
Selection ID (detailed planning) |
TCA43 |
10 |
TERM1 |
|
TERMX |
XFELD |
CHAR |
1 |
0 |
Lead time scheduling (detailed planning) |
|
11 |
KAPK1 |
|
KAPKX |
XFELD |
CHAR |
1 |
0 |
Indicator: Generate capacity reqmts (detailed planning) |
|
12 |
PHORI_2 |
|
PHORI_2 |
NUMC3 |
NUMC |
3 |
0 |
Scheduling horizon (detailed planning, medium term) |
|
13 |
APLS1_2 |
|
APLS1_2 |
CP_SEL_ID |
CHAR |
2 |
0 |
Selection ID for routing (detailed planning, medium term) |
|
14 |
TERM1_2 |
|
TERMX_2 |
XFELD |
CHAR |
1 |
0 |
Lead time scheduling (detailed planning, medium term) |
|
15 |
KAPK1_2 |
|
KAPKX_2 |
XFELD |
CHAR |
1 |
0 |
Create capacity requirements (detailed planning,medium term) |
|
16 |
PHORI_3 |
|
PHORI_3 |
NUMC3 |
NUMC |
3 |
0 |
Scheduling horizon (detailed planning, long term) |
|
17 |
APLS1_3 |
|
APLS1_3 |
CP_SEL_ID |
CHAR |
2 |
0 |
Selection ID for routing (detailed planning, long term) |
|
18 |
KAPK1_3 |
|
KAPKX_3 |
XFELD |
CHAR |
1 |
0 |
Create capacity requirements (detailed planning, long term) |
|
19 |
TERM1_3 |
|
TERMX_3 |
XFELD |
CHAR |
1 |
0 |
Lead time scheduling (detailed planning, long term) |
|
20 |
RATHR |
|
RATHR |
NUMC3 |
NUMC |
3 |
0 |
Rate-based planning horizon |
|
21 |
APLS2 |
|
APLS2 |
CP_SEL_ID |
CHAR |
2 |
0 |
Selection ID (rate-based planning) |
TCA43 |
22 |
TERM2 |
|
TERMX_RATE |
XFELD |
CHAR |
1 |
0 |
Lead time scheduling (rate-based planning) |
|
23 |
KAPK2 |
|
KAPKX_RATE |
XFELD |
CHAR |
1 |
0 |
Create capacity requirements (rate-based planning) |
|
24 |
GROHR |
|
GROHR |
NUMC3 |
NUMC |
3 |
0 |
Rough-cut planning horizon |
|
25 |
APLS3 |
|
APLS3 |
CP_SEL_ID |
CHAR |
2 |
0 |
Selection ID (rough-cut planning) |
TCA43 |
26 |
TERM3 |
|
TERMX_GROB |
XFELD |
CHAR |
1 |
0 |
Lead time scheduling (rough-cut planning) |
|
27 |
KAPK3 |
|
KAPKX_GROB |
XFELD |
CHAR |
1 |
0 |
Create capacity requirements (rough-cut planning) |
|
28 |
DADJ1 |
|
DADJ1 |
DADJ1 |
CHAR |
1 |
0 |
Scheduling level for adjusting basic dates |
|
29 |
DADJ2 |
|
DADJ2 |
DADJ2 |
CHAR |
1 |
0 |
Adjust dates in lead time scheduling |
|
30 |
DADJ3 |
|
DADJ3 |
DADJ3 |
CHAR |
1 |
0 |
Adjusting dates when dispatching planned orders |
|
31 |
TERMKZ |
|
TERMKZ |
TERART |
CHAR |
1 |
0 |
Scheduling type |
T482 |
32 |
TERMKZ_TXT |
|
TERMKZ_TXT |
TEXT30 |
CHAR |
30 |
0 |
Description of scheduling type |
|
33 |
TERM_AUTO |
|
TERM_AUTO |
FLAG |
CHAR |
1 |
0 |
Indicator: Calculate dates automatically during saving |
|
34 |
PROT_AUTO |
|
PROT_AUTO |
XFLAG |
CHAR |
1 |
0 |
Display scheduling log automatically |
|
35 |
STVERG |
|
STVERG |
STVERG |
NUMC |
3 |
0 |
Maximum number of days start date can be in the past |
|
36 |
MATFRUEH |
|
LAGE_FR |
LAGE_FR |
CHAR |
1 |
0 |
Latest date for material staging |
|
37 |
BREAKS |
|
BREAKS |
XFELD |
CHAR |
1 |
0 |
Indicator: Scheduling allowing for breaks |
|
38 |
PROD_DATES |
|
PROD_DATES |
XFELD |
CHAR |
1 |
0 |
Scheduling based on production dates |
|
39 |
AUF_SHIFT |
|
AUF_SHIFT |
XFELD |
CHAR |
1 |
0 |
Indicator: Shift order/network |
|
40 |
RED_ART |
|
RED_ART |
RED_ART |
CHAR |
1 |
0 |
Reduction type |
|
41 |
REDST_MAX |
|
REDST_MAX |
REDST_MAX |
NUMC |
1 |
0 |
Maximum reduction level |
|
42 |
REDVS_S1 |
|
REDVS_S1 |
CX_RPROZ |
DEC |
3 |
0 |
Red. of floats before and after production (%) |
|
43 |
REDVS_S2 |
|
REDVS_S2 |
CX_RPROZ |
DEC |
3 |
0 |
Reduction level 2: Red. of floats bef./after prod. (in %) |
|
44 |
REDVS_S3 |
|
REDVS_S3 |
CX_RPROZ |
DEC |
3 |
0 |
Reduction level 3: Red. of floats bef./aft. prod. (in %) |
|
45 |
REDVS_S4 |
|
REDVS_S4 |
CX_RPROZ |
DEC |
3 |
0 |
Reduction level 4: Red. of floats bef./aft. prod. (in %) |
|
46 |
REDVS_S5 |
|
REDVS_S5 |
CX_RPROZ |
DEC |
3 |
0 |
Reduction level 5: Red. of floats bef./aft. prod. (in %) |
|
47 |
REDVS_S6 |
|
REDVS_S6 |
CX_RPROZ |
DEC |
3 |
0 |
Reduction level 6: Red. of floats bef./aft. prod. (in %) |
|
48 |
TERM_KPER |
|
TERM_KPER |
TERM_KPER |
CHAR |
1 |
0 |
Rescheduling in Workforce Planning |
|
49 |
CMACT |
|
CMACT |
CMACT |
CHAR |
1 |
0 |
Assignment Material Staging Operation Segment |
|