SAP ABAP Data Element STVERG (Maximum number of days start date can be in the past)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CX (Package) R/3 Application development: R/3 Scheduling
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CX (Package) R/3 Application development: R/3 Scheduling
Basic Data
Data Element | STVERG |
Short Description | Maximum number of days start date can be in the past |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | STVERG | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | StartPast |
Medium | 15 | Start in past |
Long | 20 | Start in past |
Heading | 3 | SiP |
Documentation
Definition
Number of days that scheduling allows the start date to be in the past.
If this number of days is exceeded, the system automatically overrides the set scheduling type and uses "today" scheduling.
History
Last changed by/on | SAP | 19971020 |
SAP Release Created in | 470 |